Banner MSC Banner MSC Banner MSC
ADVERTISEMENT

DON'T MISS OUR PREMIUM CONTENT

SUBSCRIBE
LOGIN
T21
  • Login
  • Register
  • Aerial
  • Automotive
  • Land
  • Railway
  • Maritime
  • Logistics
  • Economy
  • Technology
  • Opinion
  • Magazine
  • ESG
No Result
View All Result
  • Aerial
  • Automotive
  • Land
  • Railway
  • Maritime
  • Logistics
  • Economy
  • Technology
  • Opinion
  • Magazine
  • ESG
No Result
View All Result
T21
No Result
View All Result
Home Railway

More than 20 companies compete for the Saltillo-Nuevo Laredo train

The ARTF reiterated that the opening of proposals will take place on December 2nd.

T21 Media by T21 Media
12 November, 2025
5
SHARES
ShareShareShare

The  Railway Transport Regulatory Agency (ARTF)  indicated that 21 companies have shown interest in participating in the bidding process for the construction and design of 30.75 kilometers (km) of the  Saltillo-Nuevo Laredo passenger train  , segment 15 “B”, Monterrey Metropolitan Area .

The work for this project will be carried out in Nuevo León and Tamaulipas, in order to connect the Monterrey metropolitan area with Nuevo Laredo

The ARTF specified that the allocation of resources for said project for the following year will be 5,041,255,103.77 pesos.

According to the minutes of the first clarification meeting, the companies that have also participated in other tenders for the new passenger trains promoted by the current federal administration are Caabsa Constructora, China Railway International Group, Construcciones Urales, Construcciones y Maquinaria, Constructora de Proyectos Viales de México (a subsidiary of OHLA),  Constructora Garza Ponce, and  Contratista General de América Latina.

As well as Gami Ingeniería e Instalaciones , ICA Constructora , Impulsora de Desarrollo Integral, Ingeniería y Desarrollo Inmobiliario de México, Jaguar Ingenieros Constructores, La Peninsular Compañía Constructora, Mota-Engil México, Operadora CICSA  (a subsidiary of Grupo Carso), Prodemex Construcciones, and Promotora y Desarrolladora Mexicana.

In addition to Proveedora de Materiales del Norte, Recal Estructuras ,  Regiomontana de Construcción y Servicios , and TSO-NGE México .

The ARTF reiterated that the opening of proposals will take place on December 2nd, and that the date for the announcement of the winning bid will be revealed, as well as the start of construction on January 16, 2026, with  an execution period of 1,020 calendar days

This section is part of the Saltillo-Nuevo Laredo train, which consists of the construction of a 395.77 km railway line, with proposed stations and stops in Derramadero, Saltillo Centro, Ramos Arizpe, García, Santa Catarina, Monterrey Centro, Las Torres, Bustamante, Anáhuac, and Nuevo Laredo Centro.

Source: ARTF

Comment and follow us on X:  @evandeltoro  /  @GrupoT21

Tags: ARTFCHINA RAILWAY INTERNATIONAL GROUPGrupo CarsoSALTILLO-NUEVO LAREDO TRAIN

Related news

ATTRAPI declares the tender to build 4 stations of the Saltillo–Nuevo Laredo train void

ATTRAPI declares the tender to build 4 stations of the Saltillo–Nuevo Laredo train void

26 February, 2026
ATTRAPI launches tender for segment of the Saltillo–Nuevo Laredo train

ATTRAPI launches tender for segment of the Saltillo–Nuevo Laredo train

23 February, 2026
These consortiums are raising their hands to build 4 stations for the Saltillo-Nuevo Laredo train

These consortiums are raising their hands to build 4 stations for the Saltillo-Nuevo Laredo train

27 January, 2026
Bids submitted for third section of the Querétaro-Irapuato train

Bids submitted for third section of the Querétaro-Irapuato train

8 January, 2026
Next Post
DAF XG, innovation, efficiency, and safety in trucking

DAF XG, innovation, efficiency, and safety in trucking

Cross-border and intermodal strategies: Volkswagen de México’s bet for its logistics

Cross-border and intermodal strategies: Volkswagen de México's bet for its logistics

Featured Video

https://www.youtube.com/watch?v=9df6l4A59pk

Most Read

  • 350 companies suspended for alleged irregular steel imports

    350 companies suspended for alleged irregular steel imports

    5 shares
    Share 2 Tweet 1
  • SAT and ANAM Announce “New Transport Facilities” for the Tehuantepec Isthmus Interoceanic Corridor

    5 shares
    Share 2 Tweet 1
  • Mexico confirms its leadership in trade with the US by the end of 2025

    5 shares
    Share 2 Tweet 1
  • Traxión formalizes the acquisition of Solistica; exceeds one million square meters of logistics infrastructure

    5 shares
    Share 2 Tweet 1
  • Foreign Direct Investment in Mexico sets a new record in 2025

    5 shares
    Share 2 Tweet 1
  • Closure of the Strait of Hormuz could affect Mexico’s fuel price hikes

    5 shares
    Share 2 Tweet 1

Web Stories

Ver todas
índice de Confianza del Transporte y Logística – Cuarto trimestre 2023
10 destinos de exportación de vehículos pesados 2023
Descubre el Top 10 de destinos de exportación de vehículos pesados en México en 2023
La venta de vehículos pesados rompe récord en 2023
5 marcas de camiones más vendidas

Categories

  • Aerial
  • Automotive
  • Land
  • Railway
  • Maritime
  • Logistics
  • Economy
  • Technology
  • Opinion
  • Magazine

Other Links

Contact Us
Advertising contact
Media Kit
Privacy Policy
Cookies policy
  • Contact Us
  • Privacy Policy
  • Cookies policy (EU)

© 2024 T21-US - All rights reserved.

Welcome Back!

Sign In with Facebook
Sign In with Google
Sign In with Linked In
OR

Login to your account below

Forgotten Password? Sign Up

Create New Account!

Sign Up with Facebook
Sign Up with Google
Sign Up with Linked In
OR

Fill the forms below to register

All fields are required. Log In

Retrieve your password

Please enter your username or email address to reset your password.

Log In
Manage cookie consent
To offer the best experiences, we use technologies such as cookies to store and/or access device information. Consent to these technologies will allow us to process data such as browsing behavior or unique IDs on this site. Failure to consent, or withdrawal of consent, may adversely affect certain features and functions.
Funcional Always active
El almacenamiento o acceso técnico es estrictamente necesario para el propósito legítimo de permitir el uso de un servicio específico explícitamente solicitado por el abonado o usuario, o con el único propósito de llevar a cabo la transmisión de una comunicación a través de una red de comunicaciones electrónicas.
Preferences
The technical storage or access is necessary for the legitimate purpose of storing preferences that are not requested by the subscriber or user.
Estadísticas
El almacenamiento o acceso técnico que es utilizado exclusivamente con fines estadísticos. The technical storage or access that is used exclusively for anonymous statistical purposes. Without a subpoena, voluntary compliance on the part of your Internet Service Provider, or additional records from a third party, information stored or retrieved for this purpose alone cannot usually be used to identify you.
Marketing
El almacenamiento o acceso técnico es necesario para crear perfiles de usuario para enviar publicidad, o para rastrear al usuario en una web o en varias web con fines de marketing similares.
  • Manage options
  • Manage services
  • Manage {vendor_count} vendors
  • Read more about these purposes
Ver preferencias
  • {title}
  • {title}
  • {title}
No Result
View All Result
  • Aerial
  • Automotive
  • Land
  • Railway
  • Maritime
  • Logistics
  • Economy
  • Technology
  • Opinión
  • Magazine
  • ESG

© 2023 T21. Todos los derechos reservados

Are you sure want to unlock this post?
Unlock left : 0
Are you sure want to cancel subscription?
índice de Confianza del Transporte y Logística – Cuarto trimestre 2023 10 destinos de exportación de vehículos pesados 2023 Descubre el Top 10 de destinos de exportación de vehículos pesados en México en 2023 La venta de vehículos pesados rompe récord en 2023 5 marcas de camiones más vendidas