<?xml version="1.0" encoding="UTF-8"?><rss version="2.0"
	xmlns:content="http://purl.org/rss/1.0/modules/content/"
	xmlns:wfw="http://wellformedweb.org/CommentAPI/"
	xmlns:dc="http://purl.org/dc/elements/1.1/"
	xmlns:atom="http://www.w3.org/2005/Atom"
	xmlns:sy="http://purl.org/rss/1.0/modules/syndication/"
	xmlns:slash="http://purl.org/rss/1.0/modules/slash/"
	>

<channel>
	<title>SALTILLO-NUEVO LAREDO TRAIN archivos - T21</title>
	<atom:link href="https://t21.us/tag/saltillo-nuevo-laredo-train/feed/" rel="self" type="application/rss+xml" />
	<link>https://t21.us/tag/saltillo-nuevo-laredo-train/</link>
	<description>The leading provider of news in the Transportation and Logistics Sector, including Air, Maritime, Land, and Railway, in Mexico and Latin America.</description>
	<lastBuildDate>Fri, 24 Apr 2026 23:43:23 +0000</lastBuildDate>
	<language>en-US</language>
	<sy:updatePeriod>
	hourly	</sy:updatePeriod>
	<sy:updateFrequency>
	1	</sy:updateFrequency>
	<generator>https://wordpress.org/?v=7.0.4</generator>

<image>
	<url>https://t21.us/wp-content/uploads/2024/04/cropped-t21-favicon-200-32x32-1.png</url>
	<title>SALTILLO-NUEVO LAREDO TRAIN archivos - T21</title>
	<link>https://t21.us/tag/saltillo-nuevo-laredo-train/</link>
	<width>32</width>
	<height>32</height>
</image> 
	<item>
		<title>A consortium led by Recal Estructuras will build a section of the Saltillo–Nuevo Laredo train</title>
		<link>https://t21.us/a-consortium-led-by-recal-estructuras-will-build-a-section-of-the-saltillo-nuevo-laredo-train/</link>
		
		<dc:creator><![CDATA[T21 Media]]></dc:creator>
		<pubDate>Fri, 24 Apr 2026 23:43:23 +0000</pubDate>
				<category><![CDATA[FEATURED]]></category>
		<category><![CDATA[Railway]]></category>
		<category><![CDATA[ATTRAPI]]></category>
		<category><![CDATA[PASSENGER TRAIN]]></category>
		<category><![CDATA[RAILWAY PROJECTS]]></category>
		<category><![CDATA[RECAL STRUCTURE]]></category>
		<category><![CDATA[SALTILLO-NUEVO LAREDO TRAIN]]></category>
		<guid isPermaLink="false">https://t21.us/?p=635364</guid>

					<description><![CDATA[<p>The consortium led by Recal Estructuras won the bid for the construction and design of 9.204 kilometers (km) of the Saltillo–Nuevo Laredo passenger train, segment 15 “A2”, Monterrey Metropolitan Area. Together with Constructora Moyeda, Construcciones Urales , Azvi, and Gami Ingeniería e Instalaciones, they were awarded a contract for 10 billion 438 million 249 thousand 060.02 pesos . According to the [&#8230;]</p>
<p>El cargo <a href="https://t21.us/a-consortium-led-by-recal-estructuras-will-build-a-section-of-the-saltillo-nuevo-laredo-train/">A consortium led by Recal Estructuras will build a section of the Saltillo–Nuevo Laredo train</a> apareció primero en <a href="https://t21.us">T21</a>.</p>
]]></description>
										<content:encoded><![CDATA[<p><img decoding="async" src="https://t21.com.mx/wp-content/uploads/2026/04/Sin-titulo-17.jpg" /></p>
<p><span dir="auto">The consortium led by </span><a href="https://recalglobal.com/"><span dir="auto">Recal Estructuras</span></a><span dir="auto"> won the bid for the construction and design of 9.204 kilometers (km) of the Saltillo–Nuevo Laredo passenger train, segment 15 “A2”, Monterrey Metropolitan Area.</span></p>
<p><span dir="auto">Together with Constructora Moyeda, </span><a href="https://construccionesurales.mx/"><span dir="auto">Construcciones Urales</span></a><span dir="auto"> , Azvi, and Gami Ingeniería e Instalaciones, they were awarded </span><strong><span dir="auto">a contract for 10 billion 438 million 249 thousand 060.02 pesos</span></strong><span dir="auto"> .</span></p>
<p><span dir="auto">According to the tender ruling, the consortia led by </span><strong><span dir="auto">Impulsora de Desarrollo Integral</span></strong><span dir="auto"> , as well as </span><strong><span dir="auto">Proveedora de Materiales del Norte</span></strong><span dir="auto"> , and Tordec were rejected for not meeting the required requirements.</span></p>
<p><span dir="auto">Meanwhile, along with Recal Estructuras, </span><a href="https://www.ica.com.mx/"><span dir="auto">ICA Constructora</span></a><span dir="auto"> and Constructora de Proyectos Viales de México complied with the requirements established by the </span><a href="https://www.gob.mx/attrapi/en"><span dir="auto">Agency for Trains and Integrated Public Transport (ATTRAPI)</span></a><span dir="auto"> .</span></p>
<p><span dir="auto">The agency specified that </span><strong><span dir="auto">the work will begin on May 1st</span></strong><span dir="auto"> and will have an execution period of 1,007 calendar days.</span></p>
<p><span dir="auto">The Saltillo–Nuevo Laredo train is expected to improve regional connectivity in the Bajío region. This 18.06 km rail line will connect the Monterrey Metropolitan Area, passing through urban and rural areas, as well as industrial sites.</span></p>
<p><span dir="auto">It is worth remembering that the overall </span><strong><span dir="auto"> Saltillo-Nuevo Laredo train project consists of the construction of a 396.3 kilometer (km) railway line </span></strong><span dir="auto"> that will have a double track section without electrification and will run at a maximum speed of 200 kilometers per hour (km/h).</span></p>
<figure id="attachment_673356" class="wp-caption aligncenter" aria-describedby="caption-attachment-673356"><img fetchpriority="high" decoding="async" class="wp-image-673356 size-full" src="https://t21.com.mx/wp-content/uploads/2026/04/Captura-de-pantalla-2026-02-22-213315.png" sizes="(max-width: 950px) 100vw, 950px" srcset="https://t21.com.mx/wp-content/uploads/2026/04/Captura-de-pantalla-2026-02-22-213315.png 950w, https://t21.com.mx/wp-content/uploads/2026/04/Captura-de-pantalla-2026-02-22-213315-300x154.png 300w, https://t21.com.mx/wp-content/uploads/2026/04/Captura-de-pantalla-2026-02-22-213315-768x394.png 768w, https://t21.com.mx/wp-content/uploads/2026/04/Captura-de-pantalla-2026-02-22-213315-600x308.png 600w, https://t21.com.mx/wp-content/uploads/2026/04/Captura-de-pantalla-2026-02-22-213315-150x77.png 150w, https://t21.com.mx/wp-content/uploads/2026/04/Captura-de-pantalla-2026-02-22-213315-750x384.png 750w" alt="" width="950" height="487" data-pin-no-hover="true" /><figcaption id="caption-attachment-673356" class="wp-caption-text"><span dir="auto">Source: ATTRAPI.</span></figcaption></figure>
<p><span dir="auto">Comment and follow us on LinkedIn:  </span><a href="https://www.linkedin.com/in/evangelina-del-toro-31b8104b/"><span dir="auto">@Evangelina del Toro</span></a><span dir="auto">  /  </span><a id="menurj3" class="fui-Link ___1q1shib f2hkw1w f3rmtva f1ewtqcl fyind8e f1k6fduh f1w7gpdv fk6fouc fjoy568 figsok6 f1s184ao f1mk8lai fnbmjn9 f1o700av f13mvf36 f1cmlufx f9n3di6 f1ids18y f1tx3yz7 f1deo86v f1eh06m1 f1iescvh fhgqx19 f1olyrje f1p93eir f1nev41a f1h8hb77 f1lqvz6u f10aw75t fsle3fq f17ae5zn" title="https://www.linkedin.com/company/t21-grupo-comunicai-ny-medios/" href="https://www.linkedin.com/company/t21-grupo-comunicai-n-y-medios/" target="_blank" rel="noreferrer noopener" aria-label="Link @GrupoT21"><span dir="auto">@GrupoT21</span></a></p>
<p>El cargo <a href="https://t21.us/a-consortium-led-by-recal-estructuras-will-build-a-section-of-the-saltillo-nuevo-laredo-train/">A consortium led by Recal Estructuras will build a section of the Saltillo–Nuevo Laredo train</a> apareció primero en <a href="https://t21.us">T21</a>.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>This consortium will build 4 stations on the Saltillo-Nuevo Laredo train line</title>
		<link>https://t21.us/this-consortium-will-build-4-stations-on-the-saltillo-nuevo-laredo-train-line/</link>
		
		<dc:creator><![CDATA[T21 Media]]></dc:creator>
		<pubDate>Tue, 21 Apr 2026 00:22:47 +0000</pubDate>
				<category><![CDATA[Railway]]></category>
		<category><![CDATA[ATTRAPI]]></category>
		<category><![CDATA[COMSA INFRASTRUCTURE]]></category>
		<category><![CDATA[PASSENGER TRAIN]]></category>
		<category><![CDATA[RAILWAY PROJECTS]]></category>
		<category><![CDATA[SALTILLO-NUEVO LAREDO TRAIN]]></category>
		<category><![CDATA[STATION CONSTRUCTION]]></category>
		<guid isPermaLink="false">https://t21.us/?p=635269</guid>

					<description><![CDATA[<p>The federal government awarded the consortium headed by Comsa Infraestructuras  a contract for 2,890,971,095.04 pesos for the construction and design of four stations of the  Saltillo-Nuevo Laredo passenger train . According to the tender award document, of the five proposals received by the Agency for Trains and Integrated Public Transport (ATTRAPI) , the winning bid was the only one that was solvent and [&#8230;]</p>
<p>El cargo <a href="https://t21.us/this-consortium-will-build-4-stations-on-the-saltillo-nuevo-laredo-train-line/">This consortium will build 4 stations on the Saltillo-Nuevo Laredo train line</a> apareció primero en <a href="https://t21.us">T21</a>.</p>
]]></description>
										<content:encoded><![CDATA[<p><img decoding="async" src="https://t21.com.mx/wp-content/uploads/2026/04/Sin-titulo-11.jpg" /></p>
<p><span dir="auto">The federal government awarded the consortium headed by </span><a href="https://www.comsa.com/"><span dir="auto">Comsa Infraestructuras</span></a><span dir="auto">  a contract for </span><strong><span dir="auto">2,890,971,095.04 pesos</span></strong><span dir="auto"> for the construction and design of four stations of the  </span><strong><span dir="auto">Saltillo-Nuevo Laredo passenger train</span></strong><span dir="auto"> .</span></p>
<p><span dir="auto">According to the tender award document, of the five proposals received by the </span><a href="https://www.gob.mx/attrapi"><span dir="auto">Agency for Trains and Integrated Public Transport (ATTRAPI)</span></a><span dir="auto"> , the winning bid was the only one that was solvent and met all the requested requirements.</span></p>
<p><span dir="auto">Comsa Infraestructura formed the consortium with Regiomontana de Construcción y Servicios, Comsa, and Vise. </span><strong><span dir="auto">Work will begin on April 27th</span></strong><span dir="auto"> , with a completion timeframe of 749 calendar days.</span></p>
<p><span dir="auto">The agency highlighted that the 2026 allocation for this project amounts to 1,116 million 688 thousand 100.40 pesos.</span></p>
<p><span dir="auto">The works encompass the construction and design of the  </span><strong><span dir="auto">Derramadero, Saltillo, Ramos Arizpe and García</span></strong><span dir="auto"> stations .</span></p>
<p><span dir="auto">Last February, ATTRAPI declared the bidding process for this project void, as it considered that none of the offers it received met all the requested technical and economic requirements.</span></p>
<p><strong><span dir="auto">The Saltillo-Nuevo Laredo train project involves the construction of a 396.3-kilometer (km) railway line,</span></strong><span dir="auto"> which will include a section of double track that is not electrified and will operate at a maximum speed of 200 kilometers per hour (km/h). It also includes the following stations and stops: Derramadero, Saltillo Centro, Ramos Arizpe, García, Las Torres, Salinas Victoria, Bustamante, Lampazos, Anáhuac, and Nuevo Laredo.</span></p>
<p><span dir="auto">It is worth remembering that </span><a href="https://recalglobal.com/"><span dir="auto">Recal Estructuras</span></a><span dir="auto"> , </span><a href="https://construccionesurales.mx/"><span dir="auto">Construcciones Urales</span></a><span dir="auto"> , Gami Ingeniería e Instalaciones, Azvi and Constructora Moyeda were the companies that won the construction and design of 8.854 km of this same project in segment 15 “A1”, Monterrey Metropolitan Area.</span></p>
<blockquote><p><span dir="auto">ATTRAPI also launched tenders for this project for the construction and design of the General Escobedo, Salinas Victoria, Villaldama, Lampazos de Naranjo, Anáhuac and Nuevo Laredo stations; the deadline for submitting proposals is May 12.</span></p></blockquote>
<p><span dir="auto">Also, on April 29th, the decision will be made for the tender for the construction and design of the Zica Derramadero railway auxiliary buildings, García Workshops and Garages, Las Torres inspection zone, Salinas Victoria maintenance base and Zica Nuevo Laredo.</span></p>
<p><span dir="auto">Meanwhile, the next April 24th will be for the construction and design of the railway systems, and the 21st of the same month for the construction and design of 9,204 km, segment 15 “A2”, Monterrey Metropolitan Area.</span></p>
<p><span dir="auto">Comment and follow us on LinkedIn:  </span><a href="https://www.linkedin.com/in/evangelina-del-toro-31b8104b/"><span dir="auto">@Evangelina del Toro</span></a><span dir="auto">  /  </span><a href="https://www.linkedin.com/company/t21-grupo-comunicai-n-y-medios/"><span dir="auto">@GrupoT21</span></a></p>
<div class="jeg_ad jeg_ad_article jnews_content_inline_2_ads  ">
<div class="ads-wrapper align-center "></div>
</div>
<p>El cargo <a href="https://t21.us/this-consortium-will-build-4-stations-on-the-saltillo-nuevo-laredo-train-line/">This consortium will build 4 stations on the Saltillo-Nuevo Laredo train line</a> apareció primero en <a href="https://t21.us">T21</a>.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>ATTRAPI launches competition to build 6 stations for the Saltillo–Nuevo Laredo train</title>
		<link>https://t21.us/attrapi-launches-competition-to-build-6-stations-for-the-saltillo-nuevo-laredo-train/</link>
		
		<dc:creator><![CDATA[T21 Media]]></dc:creator>
		<pubDate>Tue, 07 Apr 2026 01:45:43 +0000</pubDate>
				<category><![CDATA[Railway]]></category>
		<category><![CDATA[ATTRAPI]]></category>
		<category><![CDATA[INAH]]></category>
		<category><![CDATA[PASSENGER TRAIN]]></category>
		<category><![CDATA[RAILWAY PROJECTS]]></category>
		<category><![CDATA[RAILWAY STATIONS]]></category>
		<category><![CDATA[SALTILLO-NUEVO LAREDO TRAIN]]></category>
		<guid isPermaLink="false">https://t21.us/?p=634973</guid>

					<description><![CDATA[<p>The  Agency for Trains and Integrated Public Transportation (ATTRAPI) launched the call for bids for the construction and design of six railway stations for the Saltillo–Nuevo Laredo passenger train. According to the document, these are the stations General Escobedo, Salinas Victoria, Villaldama, Lampazos de Naranjo, Anáhuac and Nuevo Laredo . “The work will be carried out under a continuous management scheme [&#8230;]</p>
<p>El cargo <a href="https://t21.us/attrapi-launches-competition-to-build-6-stations-for-the-saltillo-nuevo-laredo-train/">ATTRAPI launches competition to build 6 stations for the Saltillo–Nuevo Laredo train</a> apareció primero en <a href="https://t21.us">T21</a>.</p>
]]></description>
										<content:encoded><![CDATA[<p><img decoding="async" src="https://t21.com.mx/wp-content/uploads/2026/04/Sin-titulo-1.jpg" /></p>
<p><span dir="auto">The  </span><a href="https://www.gob.mx/attrapi"><span dir="auto">Agency for Trains and Integrated Public Transportation (ATTRAPI)</span></a><span dir="auto"> launched the call for bids for the </span><strong><span dir="auto">construction and design of six railway stations</span></strong><span dir="auto"> for the Saltillo–Nuevo Laredo passenger train.</span></p>
<p><span dir="auto">According to the document, these are the stations </span><strong><span dir="auto">General Escobedo, Salinas Victoria, Villaldama, Lampazos de Naranjo, Anáhuac and Nuevo Laredo</span></strong><span dir="auto"> .</span></p>
<blockquote><p><span dir="auto">“The work will be carried out under a continuous management scheme ( </span><em><span dir="auto">fast track</span></em><span dir="auto"> ), starting construction in stages as portions of the executive project are completed, without waiting to have the project completed in its entirety, which implies that work can begin as long as the construction elements of the work to be carried out do have the corresponding executive project,” the agency specified.</span></p></blockquote>
<p><span dir="auto">ATTRAPI highlighted that </span><strong><span dir="auto">Salinas Victoria, Villaldama and Lampazos de Naranjo are old stations with historical value</span></strong><span dir="auto">  cataloged by the </span><a href="https://www.inah.gob.mx/"><span dir="auto">National Institute of Anthropology and History (INAH)</span></a><span dir="auto"> , so the winner must consider the materials, specialized personnel, tools, equipment, temporary installations and other elements required for their correct execution, in accordance with the guidelines and authorizations issued by this institute.</span></p>
<blockquote><p><span dir="auto">“The winning bidder will be responsible for coordinating with the competent authorities for the initiation, management, monitoring and conclusion of all necessary procedures, the preparation of studies, reports, executive project and the execution of rescue and salvage actions, as well as for carrying out the corresponding works, within the deadlines established by the agency,” he explained.</span></p></blockquote>
<p><span dir="auto">The agency specified that the presentation and opening of proposals for this project </span><strong><span dir="auto">will be on April 21, and that day the date on which the decision will be made will be announced</span></strong><span dir="auto"> .</span></p>
<p><span dir="auto">Similarly, he indicated that the start date for the work will be </span><strong><span dir="auto">May 21, 2026, with a deadline for the execution of the work of 558 calendar days</span></strong><span dir="auto"> .</span></p>
<p><span dir="auto">Comment and follow us on LinkedIn:  </span><a href="https://www.linkedin.com/in/evangelina-del-toro-31b8104b/"><span dir="auto">@Evangelina del Toro</span></a><span dir="auto">  /  </span><a href="https://www.linkedin.com/company/t21-grupo-comunicai-n-y-medios/"><span dir="auto">@GrupoT21</span></a></p>
<p>El cargo <a href="https://t21.us/attrapi-launches-competition-to-build-6-stations-for-the-saltillo-nuevo-laredo-train/">ATTRAPI launches competition to build 6 stations for the Saltillo–Nuevo Laredo train</a> apareció primero en <a href="https://t21.us">T21</a>.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>ATTRAPI declares the tender to build 4 stations of the Saltillo–Nuevo Laredo train void</title>
		<link>https://t21.us/attrapi-declares-the-tender-to-build-4-stations-of-the-saltillo-nuevo-laredo-train-void/</link>
		
		<dc:creator><![CDATA[T21 Media]]></dc:creator>
		<pubDate>Thu, 26 Feb 2026 23:06:23 +0000</pubDate>
				<category><![CDATA[Railway]]></category>
		<category><![CDATA[ATTRAPI]]></category>
		<category><![CDATA[RAILWAY PROJECTS]]></category>
		<category><![CDATA[SALTILLO-NUEVO LAREDO TRAIN]]></category>
		<category><![CDATA[STATIONS]]></category>
		<category><![CDATA[TENDER]]></category>
		<guid isPermaLink="false">https://t21.us/?p=633960</guid>

					<description><![CDATA[<p>The  Agency for Trains and Integrated Public Transportation (ATTRAPI) declared the tender for the construction and design of the Derramadero, Saltillo, Ramos Arizpe and García stations of the Saltillo–Nuevo Laredo passenger train void. According to the competition&#8217;s ruling, the agency stated that of the six bids it received, none met all the requested technical and economic requirements. It is worth remembering [&#8230;]</p>
<p>El cargo <a href="https://t21.us/attrapi-declares-the-tender-to-build-4-stations-of-the-saltillo-nuevo-laredo-train-void/">ATTRAPI declares the tender to build 4 stations of the Saltillo–Nuevo Laredo train void</a> apareció primero en <a href="https://t21.us">T21</a>.</p>
]]></description>
										<content:encoded><![CDATA[<p><img decoding="async" src="https://t21.com.mx/wp-content/uploads/2026/02/Sin-titulo-17.jpg" /></p>
<p><span dir="auto">The  </span><a href="https://www.gob.mx/attrapi"><span dir="auto">Agency for Trains and Integrated Public Transportation (ATTRAPI)</span></a><span dir="auto"> declared the tender for the construction and design of the </span><strong><span dir="auto">Derramadero, Saltillo, Ramos Arizpe and García</span></strong><span dir="auto"> stations of the Saltillo–Nuevo Laredo passenger train void.</span></p>
<p><span dir="auto">According to the competition&#8217;s ruling, the agency stated that </span><strong><span dir="auto">of the six bids it received, none met all the</span></strong><span dir="auto"> requested technical and economic requirements.</span></p>
<p><a href="https://www.comsa.com/"><span dir="auto">It is worth remembering that for this tender, the consortium formed by Comsa Infraestructuras</span></a><span dir="auto"> , VISE, COMSA and Regiomontana de Construcción y Servicios submitted offers  for two billion 567 million 432 thousand 059.57 pesos.</span></p>
<p><span dir="auto">Meanwhile, the offer from Constructora de Proyectos Viales de México, Obrascon Huarte Lain (OHL) and </span><a href="https://www.grupocaabsa.com/"><span dir="auto">Caabsa Constructora</span></a><span dir="auto"> , was two billion 963 million 635 thousand 333.05 pesos.</span></p>
<p><span dir="auto">The consortium formed by </span><strong><span dir="auto">Gami Ingeniería e Instalaciones</span></strong><span dir="auto"> , Construcciones Urales and </span><a href="https://www.azvi.es/"><span dir="auto">Azvi</span></a><span dir="auto"> , registered a proposal of two billion 695 million 483 thousand 218.84 pesos.</span></p>
<p><span dir="auto">Meanwhile , </span><a href="https://ica.com.mx/"><span dir="auto">ICA Constructora</span></a><span dir="auto"> , ICA Constructora de Infraestructura, Construcciones y Trituraciones, Controladora de Operaciones de Infraestructura and Desarrolladora de Infraestructura Puerto Escondido, submitted a bid of three billion 683 million 547 thousand 117.42 pesos.</span></p>
<p><a href="https://grupoidinsa.com/"><span dir="auto">Impulsora de Desarrollo Integral</span></a><span dir="auto"> , </span><a href="https://jaguaringenieros.mx/"><span dir="auto">Jaguar Ingenieros Constructores</span></a><span dir="auto"> , Proacon México, Aldesa Construcciones, Coalvi, Construcciones Aldesem, Aldesa Construcciones Polska and </span><a href="http://www.ccecc.com.cn/"><span dir="auto">China Civil Engineering Construction Corporation</span></a><span dir="auto"> , registered an offer for three billion 54 million 313 thousand 149.27 pesos.</span></p>
<p><span dir="auto">The lowest offer was the one presented by </span><a href="https://www.idimsa.com.mx/"><span dir="auto"> Ingeniería y Desarrollo Inmobiliario de México</span></a><span dir="auto"> , China Gezhouba Group Company Limited Mexico and Constructora e Inmobiliaria, with two billion 400 million 787 thousand 143.77 pesos.</span></p>
<p><span dir="auto">The plan included the </span><strong><span dir="auto">engineering development and execution of the comprehensive executive project</span></strong><span dir="auto"> for the construction of the aforementioned stations, platforms and tracks in the laredos, layout, earthworks, complementary studies, among others, in accordance with the tender.</span></p>
<p><span dir="auto">Comment and follow us on LinkedIn:  </span><a href="https://www.linkedin.com/in/evangelina-del-toro-31b8104b/"><span dir="auto">@Evangelina del Toro</span></a><span dir="auto">  /  </span><a id="menurj3" class="fui-Link ___1q1shib f2hkw1w f3rmtva f1ewtqcl fyind8e f1k6fduh f1w7gpdv fk6fouc fjoy568 figsok6 f1s184ao f1mk8lai fnbmjn9 f1o700av f13mvf36 f1cmlufx f9n3di6 f1ids18y f1tx3yz7 f1deo86v f1eh06m1 f1iescvh fhgqx19 f1olyrje f1p93eir f1nev41a f1h8hb77 f1lqvz6u f10aw75t fsle3fq f17ae5zn" title="https://www.linkedin.com/company/t21-grupo-comunicai-ny-medios/" href="https://www.linkedin.com/company/t21-grupo-comunicai-n-y-medios/" target="_blank" rel="noreferrer noopener" aria-label="Link @GrupoT21"><span dir="auto">@GrupoT21</span></a></p>
<p>El cargo <a href="https://t21.us/attrapi-declares-the-tender-to-build-4-stations-of-the-saltillo-nuevo-laredo-train-void/">ATTRAPI declares the tender to build 4 stations of the Saltillo–Nuevo Laredo train void</a> apareció primero en <a href="https://t21.us">T21</a>.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>ATTRAPI launches tender for segment of the Saltillo–Nuevo Laredo train</title>
		<link>https://t21.us/attrapi-launches-tender-for-segment-of-the-saltillo-nuevo-laredo-train/</link>
		
		<dc:creator><![CDATA[T21 Media]]></dc:creator>
		<pubDate>Mon, 23 Feb 2026 23:26:08 +0000</pubDate>
				<category><![CDATA[Railway]]></category>
		<category><![CDATA[ATTRAPI]]></category>
		<category><![CDATA[PASSENGER TRAIN]]></category>
		<category><![CDATA[RAILWAY PROJECTS]]></category>
		<category><![CDATA[SALTILLO-NUEVO LAREDO TRAIN]]></category>
		<category><![CDATA[TENDER]]></category>
		<guid isPermaLink="false">https://t21.us/?p=633868</guid>

					<description><![CDATA[<p>The Agency for Trains and Integrated Public Transportation (ATTRAPI) launched the tender for the construction and design of 9.204 kilometers (km) of the Saltillo–Nuevo Laredo passenger train, segment 15 “A2”, Monterrey Metropolitan Area. The agency detailed that the project includes the construction of a double railway track , the elevated stations of González Garza and Monterrey Centro, as well [&#8230;]</p>
<p>El cargo <a href="https://t21.us/attrapi-launches-tender-for-segment-of-the-saltillo-nuevo-laredo-train/">ATTRAPI launches tender for segment of the Saltillo–Nuevo Laredo train</a> apareció primero en <a href="https://t21.us">T21</a>.</p>
]]></description>
										<content:encoded><![CDATA[<p><img decoding="async" src="https://t21.com.mx/wp-content/uploads/2026/02/Sin-titulo-13.jpg" /></p>
<p><span dir="auto">The </span><a href="https://www.gob.mx/attrapi"><span dir="auto">Agency for Trains and Integrated Public Transportation (ATTRAPI)</span></a><span dir="auto"> launched the tender for the construction and design of 9.204 kilometers (km) of the Saltillo–Nuevo Laredo passenger train, segment 15 “A2”, Monterrey Metropolitan Area.</span></p>
<p><span dir="auto">The agency detailed that </span><strong><span dir="auto">the project includes the construction of a double railway track</span></strong><span dir="auto"> , the elevated stations of González Garza and Monterrey Centro, as well as the studies necessary for the correct preparation and authorization of the executive project.</span></p>
<figure id="attachment_668582" class="wp-caption aligncenter" aria-describedby="caption-attachment-668582"><img decoding="async" class="wp-image-668582 size-full" src="https://t21.com.mx/wp-content/uploads/2026/02/Captura-de-pantalla-2026-02-22-211830.png" sizes="(max-width: 1181px) 100vw, 1181px" srcset="https://t21.com.mx/wp-content/uploads/2026/02/Captura-de-pantalla-2026-02-22-211830.png 1181w, https://t21.com.mx/wp-content/uploads/2026/02/Captura-de-pantalla-2026-02-22-211830-300x183.png 300w, https://t21.com.mx/wp-content/uploads/2026/02/Captura-de-pantalla-2026-02-22-211830-1024x624.png 1024w, https://t21.com.mx/wp-content/uploads/2026/02/Captura-de-pantalla-2026-02-22-211830-768x468.png 768w, https://t21.com.mx/wp-content/uploads/2026/02/Captura-de-pantalla-2026-02-22-211830-600x366.png 600w, https://t21.com.mx/wp-content/uploads/2026/02/Captura-de-pantalla-2026-02-22-211830-150x91.png 150w, https://t21.com.mx/wp-content/uploads/2026/02/Captura-de-pantalla-2026-02-22-211830-750x457.png 750w, https://t21.com.mx/wp-content/uploads/2026/02/Captura-de-pantalla-2026-02-22-211830-1140x695.png 1140w" alt="" width="1181" height="720" data-pin-no-hover="true" /><figcaption id="caption-attachment-668582" class="wp-caption-text"><span dir="auto">Source: ATTRAPI.</span></figcaption></figure>
<p><span dir="auto">ATTRAPI indicated that the construction of the project will be carried out subsequently, through excavation work, soil improvement, foundations, retaining walls, mechanically stabilized walls, earthworks, ballast, sleepers, rails and their respective fixings, as well as reinforced and prestressed steel concrete for the vertical and horizontal foundation, lighting, traffic lights, among others.</span></p>
<p><span dir="auto">Also, the </span><strong><span dir="auto">construction and modernization of viaducts</span></strong><span dir="auto"> , railway and vehicular bridges designed to guarantee the continuity of train and road traffic.</span></p>
<blockquote><p><span dir="auto">“This project aims to enhance intercity connectivity in the Monterrey Metropolitan Area, through a modern, efficient and sustainable railway infrastructure,” he emphasized.</span></p></blockquote>
<p><span dir="auto">According to the tender documents, </span><strong><span dir="auto">the site visit will take place on February 25</span></strong><span dir="auto"> , followed by a clarification meeting the next day. The proposals will be opened on March 30, and the date for the tender&#8217;s decision will be announced that same day.</span></p>
<p><span dir="auto">ATTRAPI has set </span><strong><span dir="auto">May 1st as the start date for the project</span></strong><span dir="auto"> , with a completion timeframe of 1,007 calendar days. It specified that </span><strong><span dir="auto">it has allocated 1,701,168,857.41 pesos</span></strong><span dir="auto"> for this project this year.</span></p>
<p><span dir="auto">The Saltillo–Nuevo Laredo train is expected to improve regional connectivity in the Bajío region. This 18.06 km rail line connects the Monterrey Metropolitan Area, passing through urban areas, rural areas, and industrial sites.</span></p>
<figure id="attachment_668583" class="wp-caption aligncenter" aria-describedby="caption-attachment-668583"><img decoding="async" class="wp-image-668583 size-full" src="https://t21.com.mx/wp-content/uploads/2026/02/Captura-de-pantalla-2026-02-22-213315.png" sizes="(max-width: 950px) 100vw, 950px" srcset="https://t21.com.mx/wp-content/uploads/2026/02/Captura-de-pantalla-2026-02-22-213315.png 950w, https://t21.com.mx/wp-content/uploads/2026/02/Captura-de-pantalla-2026-02-22-213315-300x154.png 300w, https://t21.com.mx/wp-content/uploads/2026/02/Captura-de-pantalla-2026-02-22-213315-768x394.png 768w, https://t21.com.mx/wp-content/uploads/2026/02/Captura-de-pantalla-2026-02-22-213315-600x308.png 600w, https://t21.com.mx/wp-content/uploads/2026/02/Captura-de-pantalla-2026-02-22-213315-150x77.png 150w, https://t21.com.mx/wp-content/uploads/2026/02/Captura-de-pantalla-2026-02-22-213315-750x384.png 750w" alt="" width="950" height="487" data-pin-no-hover="true" /><figcaption id="caption-attachment-668583" class="wp-caption-text"><span dir="auto">Source: ATTRAPI.</span></figcaption></figure>
<p><span dir="auto">Comment and follow us on LinkedIn:  </span><a href="https://www.linkedin.com/in/evangelina-del-toro-31b8104b/"><span dir="auto">@Evangelina del Toro</span></a><span dir="auto">  /  </span><a id="menurj3" class="fui-Link ___1q1shib f2hkw1w f3rmtva f1ewtqcl fyind8e f1k6fduh f1w7gpdv fk6fouc fjoy568 figsok6 f1s184ao f1mk8lai fnbmjn9 f1o700av f13mvf36 f1cmlufx f9n3di6 f1ids18y f1tx3yz7 f1deo86v f1eh06m1 f1iescvh fhgqx19 f1olyrje f1p93eir f1nev41a f1h8hb77 f1lqvz6u f10aw75t fsle3fq f17ae5zn" title="https://www.linkedin.com/company/t21-grupo-comunicai-ny-medios/" href="https://www.linkedin.com/company/t21-grupo-comunicai-n-y-medios/" target="_blank" rel="noreferrer noopener" aria-label="Link @GrupoT21"><span dir="auto">@GrupoT21</span></a></p>
<p>El cargo <a href="https://t21.us/attrapi-launches-tender-for-segment-of-the-saltillo-nuevo-laredo-train/">ATTRAPI launches tender for segment of the Saltillo–Nuevo Laredo train</a> apareció primero en <a href="https://t21.us">T21</a>.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>These consortiums are raising their hands to build 4 stations for the Saltillo-Nuevo Laredo train</title>
		<link>https://t21.us/these-consortiums-are-raising-their-hands-to-build-4-stations-for-the-saltillo-nuevo-laredo-train/</link>
		
		<dc:creator><![CDATA[T21 Media]]></dc:creator>
		<pubDate>Wed, 28 Jan 2026 00:02:01 +0000</pubDate>
				<category><![CDATA[FEATURED]]></category>
		<category><![CDATA[Railway]]></category>
		<category><![CDATA[ATTRAPI]]></category>
		<category><![CDATA[CONSTUCTION]]></category>
		<category><![CDATA[RAILWAY PROJECTS]]></category>
		<category><![CDATA[SALTILLO-NUEVO LAREDO TRAIN]]></category>
		<category><![CDATA[TRAINS STATIONS]]></category>
		<guid isPermaLink="false">https://t21.us/?p=633247</guid>

					<description><![CDATA[<p>The  Agency for Trains and Integrated Public Transportation (ATTRAPI) received six bids for the construction and design of the Derramadero, Saltillo, Ramos Arizpe and García stations of the Saltillo–Nuevo Laredo passenger train. According to the tender document, the consortium formed by Comsa Infraestructuras , VISE, COMSA and Regiomontana de Construcción y Servicios submitted a proposal for two billion 567 million [&#8230;]</p>
<p>El cargo <a href="https://t21.us/these-consortiums-are-raising-their-hands-to-build-4-stations-for-the-saltillo-nuevo-laredo-train/">These consortiums are raising their hands to build 4 stations for the Saltillo-Nuevo Laredo train</a> apareció primero en <a href="https://t21.us">T21</a>.</p>
]]></description>
										<content:encoded><![CDATA[<p><img decoding="async" src="https://t21.com.mx/wp-content/uploads/2026/01/Sin-titulo-10.jpg" /></p>
<p><span dir="auto">The  </span><a href="https://www.gob.mx/attrapi"><span dir="auto">Agency for Trains and Integrated Public Transportation (ATTRAPI) </span></a><strong><span dir="auto">received six bids</span></strong><span dir="auto"> for the construction and design of the Derramadero, Saltillo, Ramos Arizpe and García stations of the Saltillo–Nuevo Laredo passenger train.</span></p>
<p><span dir="auto">According to the tender document, the consortium formed by </span><a href="https://www.comsa.com/"><span dir="auto">Comsa Infraestructuras</span></a><span dir="auto"> , VISE, COMSA and Regiomontana de Construcción y Servicios submitted a proposal for two billion 567 million 432 thousand 059.57 pesos.</span></p>
<p><span dir="auto">The lowest offer was the one presented by </span><a href="https://www.idimsa.com.mx/"><span dir="auto"> Ingeniería y Desarrollo Inmobiliario de México</span></a><span dir="auto"> , China Gezhouba Group Company Limited Mexico and Constructora e Inmobiliaria, with two billion 400 million 787 thousand 143.77 pesos.</span></p>
<figure id="attachment_666312" class="wp-caption aligncenter" aria-describedby="caption-attachment-666312"><img decoding="async" class="wp-image-666312 size-full" src="https://t21.com.mx/wp-content/uploads/2026/01/Captura-de-pantalla-2026-01-26-211857.png" sizes="(max-width: 982px) 100vw, 982px" srcset="https://t21.com.mx/wp-content/uploads/2026/01/Captura-de-pantalla-2026-01-26-211857.png 982w, https://t21.com.mx/wp-content/uploads/2026/01/Captura-de-pantalla-2026-01-26-211857-300x214.png 300w, https://t21.com.mx/wp-content/uploads/2026/01/Captura-de-pantalla-2026-01-26-211857-768x549.png 768w, https://t21.com.mx/wp-content/uploads/2026/01/Captura-de-pantalla-2026-01-26-211857-600x429.png 600w, https://t21.com.mx/wp-content/uploads/2026/01/Captura-de-pantalla-2026-01-26-211857-150x107.png 150w, https://t21.com.mx/wp-content/uploads/2026/01/Captura-de-pantalla-2026-01-26-211857-120x86.png 120w, https://t21.com.mx/wp-content/uploads/2026/01/Captura-de-pantalla-2026-01-26-211857-350x250.png 350w, https://t21.com.mx/wp-content/uploads/2026/01/Captura-de-pantalla-2026-01-26-211857-750x536.png 750w" alt="" width="982" height="702" data-pin-no-hover="true" /><figcaption id="caption-attachment-666312" class="wp-caption-text"><span dir="auto">Source: ATTRAPI.</span></figcaption></figure>
<p><span dir="auto">ATTRAPI specified that the decision for this competition </span><strong><span dir="auto">will be announced on January 30th</span></strong><span dir="auto"> .</span></p>
<p><span dir="auto">He explained that the construction work will take place in the states of Coahuila and Nuevo León, and </span><strong><span dir="auto"> it is expected that the works will begin on February 10, 2026, with a duration of 749 calendar days</span></strong><span dir="auto"> .</span></p>
<p><span dir="auto">This project includes the engineering development and execution of the comprehensive executive project for the construction of the aforementioned stations, platforms and tracks in the laredos, layout, earthworks, complementary studies, among others.</span></p>
<p><span dir="auto">Comment and follow us on X:  </span><a href="https://twitter.com/evandeltoro"><span dir="auto">@evandeltoro</span></a><span dir="auto">  /  </span><a href="https://twitter.com/GrupoT21"><span dir="auto">@GrupoT21</span></a></p>
<p>El cargo <a href="https://t21.us/these-consortiums-are-raising-their-hands-to-build-4-stations-for-the-saltillo-nuevo-laredo-train/">These consortiums are raising their hands to build 4 stations for the Saltillo-Nuevo Laredo train</a> apareció primero en <a href="https://t21.us">T21</a>.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>Bids submitted for 30.75 km of the Saltillo–Nuevo Laredo train</title>
		<link>https://t21.us/bids-submitted-for-30-75-km-of-the-saltillo-nuevo-laredo-train/</link>
		
		<dc:creator><![CDATA[T21 Media]]></dc:creator>
		<pubDate>Wed, 03 Dec 2025 22:30:42 +0000</pubDate>
				<category><![CDATA[Railway]]></category>
		<category><![CDATA[ARTF]]></category>
		<category><![CDATA[CICSA OPERATOR]]></category>
		<category><![CDATA[ICA CONSTRUCTION]]></category>
		<category><![CDATA[Monterrey]]></category>
		<category><![CDATA[RAILWAY PROJECTS]]></category>
		<category><![CDATA[SALTILLO-NUEVO LAREDO TRAIN]]></category>
		<guid isPermaLink="false">https://t21.us/?p=632377</guid>

					<description><![CDATA[<p>Three consortia and one company submitted proposals for the construction and design of 30.75 kilometers (km) of the Saltillo–Nuevo Laredo train , segment 15 “b”, Monterrey metropolitan area. According to the Railway Transport Regulatory Agency (ARTF) , the consortium headed by ICA Constructora submitted a bid of 11 billion 150 million 858 thousand 547.75 pesos, the lowest , while Proyectos y Estudios Ferroviarios had [&#8230;]</p>
<p>El cargo <a href="https://t21.us/bids-submitted-for-30-75-km-of-the-saltillo-nuevo-laredo-train/">Bids submitted for 30.75 km of the Saltillo–Nuevo Laredo train</a> apareció primero en <a href="https://t21.us">T21</a>.</p>
]]></description>
										<content:encoded><![CDATA[<p><img decoding="async" src="https://t21.com.mx/wp-content/uploads/2025/12/Sin-titulo-2.jpg" /></p>
<p><span dir="auto">Three consortia and one company submitted </span><strong><span dir="auto">proposals for the construction and design of 30.75 kilometers (km) of the Saltillo–Nuevo Laredo train</span></strong><span dir="auto"> , segment 15 “b”, Monterrey metropolitan area.</span></p>
<p><span dir="auto">According to the </span><a href="https://www.gob.mx/artf"><span dir="auto">Railway Transport Regulatory Agency (ARTF)</span></a><span dir="auto"> , the consortium headed by </span><a href="https://ica.com.mx/"><span dir="auto">ICA Constructora </span></a><strong><span dir="auto">submitted a bid of 11 billion 150 million 858 thousand 547.75 pesos, the lowest</span></strong><span dir="auto"> , while </span><strong><span dir="auto">Proyectos y Estudios Ferroviarios </span></strong><strong><span dir="auto">had the highest proposal</span></strong><span dir="auto"> , with 15 billion 271 million 970 thousand 859.57 pesos.</span></p>
<figure id="attachment_662753" class="wp-caption aligncenter" aria-describedby="caption-attachment-662753"><img decoding="async" class="wp-image-662753 size-full" src="https://t21.com.mx/wp-content/uploads/2025/12/Captura-de-pantalla-2025-12-02-200818.png" sizes="(max-width: 1268px) 100vw, 1268px" srcset="https://t21.com.mx/wp-content/uploads/2025/12/Captura-de-pantalla-2025-12-02-200818.png 1268w, https://t21.com.mx/wp-content/uploads/2025/12/Captura-de-pantalla-2025-12-02-200818-300x150.png 300w, https://t21.com.mx/wp-content/uploads/2025/12/Captura-de-pantalla-2025-12-02-200818-1024x510.png 1024w, https://t21.com.mx/wp-content/uploads/2025/12/Captura-de-pantalla-2025-12-02-200818-768x383.png 768w, https://t21.com.mx/wp-content/uploads/2025/12/Captura-de-pantalla-2025-12-02-200818-600x299.png 600w, https://t21.com.mx/wp-content/uploads/2025/12/Captura-de-pantalla-2025-12-02-200818-150x75.png 150w, https://t21.com.mx/wp-content/uploads/2025/12/Captura-de-pantalla-2025-12-02-200818-360x180.png 360w, https://t21.com.mx/wp-content/uploads/2025/12/Captura-de-pantalla-2025-12-02-200818-750x374.png 750w, https://t21.com.mx/wp-content/uploads/2025/12/Captura-de-pantalla-2025-12-02-200818-1140x568.png 1140w" alt="" width="1268" height="632" data-pin-no-hover="true" /><figcaption id="caption-attachment-662753" class="wp-caption-text"><span dir="auto">Source: ARTF.</span></figcaption></figure>
<p><span dir="auto">Following the corresponding analysis, the ARTF indicated that the decision regarding this competition will be announced on December 19th.</span></p>
<p><span dir="auto">The agency specified that it has  </span><strong><span dir="auto">an allocation of 351 million 284 thousand 265.16 pesos for this project this year</span></strong><span dir="auto"> .</span></p>
<p><span dir="auto">He explained that the work will be carried out in the states of Nuevo León and Tamaulipas, in order to connect the Monterrey Metropolitan Area with Nuevo Laredo.</span></p>
<p><span dir="auto">The ARTF </span><strong><span dir="auto">set the start of the work for January 16, 2026</span></strong><span dir="auto"> , with an execution period of 1,020 calendar days.</span></p>
<p><span dir="auto">It is worth remembering that ICA Constructora, along with Constructora de Infraestructura, Construcciones y Trituraciones, Constructora El Cajón, Compañía Hidroeléctrica La Yesca, Desarrolladora de Infraestructura Puerto Escondido, Controladora de Operaciones de Infraestructura and ICA Edificio Satélite, will have the construction and design of 100.05 km of this train in  </span><strong><span dir="auto">segments 16 and 17 Unión San Javier–Arroyo El Sauz</span></strong><span dir="auto"> .</span></p>
<p><span dir="auto">Meanwhile, for </span><a href="https://www.ccicsa.com.mx/"><span dir="auto">Operadora CICSA </span></a><span dir="auto"> (subsidiary of  </span><a href="https://www.carso.com.mx/grupo-carso/"><span dir="auto">Grupo Carso</span></a><span dir="auto"> ) and </span><a href="https://www.fccco.mx/"><span dir="auto">FCC Construcción</span></a><span dir="auto"> , it awarded the construction and design of 111 km in </span><strong><span dir="auto"> segments 13 and 14, Saltillo–Santa Catarina</span></strong><span dir="auto"> .</span></p>
<p><a href="https://www.grupoindi.com.mx/nosotros.html"><span dir="auto">Gami Ingeniería e Instalaciones</span></a><span dir="auto"> , </span><a href="https://construccionesurales.mx/"><span dir="auto">Construcciones Urales</span></a><span dir="auto"> , Recal Estructuras and </span><a href="https://www.azvi.es/"><span dir="auto">Azvi</span></a><span dir="auto"> will have the construction and design of 136.28 km in </span><strong><span dir="auto">segments 18, 19 and 20, Arroyo El Sauz–Nuevo Laredo</span></strong><span dir="auto"> .</span></p>
<p><span dir="auto">Comment and follow us on X:  </span><a href="https://twitter.com/evandeltoro"><span dir="auto">@evandeltoro</span></a><span dir="auto">  /  </span><a href="https://twitter.com/GrupoT21"><span dir="auto">@GrupoT21</span></a></p>
<p>El cargo <a href="https://t21.us/bids-submitted-for-30-75-km-of-the-saltillo-nuevo-laredo-train/">Bids submitted for 30.75 km of the Saltillo–Nuevo Laredo train</a> apareció primero en <a href="https://t21.us">T21</a>.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>More than 20 companies compete for the Saltillo-Nuevo Laredo train</title>
		<link>https://t21.us/more-than-20-companies-compete-for-the-saltillo-nuevo-laredo-train/</link>
		
		<dc:creator><![CDATA[T21 Media]]></dc:creator>
		<pubDate>Wed, 12 Nov 2025 23:11:37 +0000</pubDate>
				<category><![CDATA[Railway]]></category>
		<category><![CDATA[ARTF]]></category>
		<category><![CDATA[CHINA RAILWAY INTERNATIONAL GROUP]]></category>
		<category><![CDATA[Grupo Carso]]></category>
		<category><![CDATA[SALTILLO-NUEVO LAREDO TRAIN]]></category>
		<guid isPermaLink="false">https://t21.us/?p=631917</guid>

					<description><![CDATA[<p>The  Railway Transport Regulatory Agency (ARTF)  indicated that 21 companies have shown interest in participating in the bidding process for the construction and design of 30.75 kilometers (km) of the  Saltillo-Nuevo Laredo passenger train  , segment 15 “B”, Monterrey Metropolitan Area . The work for this project will be carried out in Nuevo León and Tamaulipas, in order to connect [&#8230;]</p>
<p>El cargo <a href="https://t21.us/more-than-20-companies-compete-for-the-saltillo-nuevo-laredo-train/">More than 20 companies compete for the Saltillo-Nuevo Laredo train</a> apareció primero en <a href="https://t21.us">T21</a>.</p>
]]></description>
										<content:encoded><![CDATA[<p><img decoding="async" src="https://t21.com.mx/wp-content/uploads/2025/06/Infraestructura-ferroviaria.jpg" /></p>
<p><span dir="auto">The  </span><a href="https://www.gob.mx/artf"><span dir="auto">Railway Transport Regulatory Agency (ARTF)</span></a><span dir="auto">  indicated that 21 companies have shown interest in participating in the bidding process for the construction and design of 30.75 kilometers (km) of the  </span><strong><span dir="auto">Saltillo-Nuevo Laredo passenger train </span></strong> <strong><span dir="auto">, segment 15 “B”, Monterrey Metropolitan Area</span></strong><span dir="auto"> .</span></p>
<p><span dir="auto">The work for this project will be carried out in Nuevo León and Tamaulipas, in order to connect the Monterrey metropolitan area with Nuevo Laredo</span></p>
<p><span dir="auto">The ARTF specified that the allocation of resources for said project for the following year </span><strong><span dir="auto">will be 5,041,255,103.77 pesos.</span></strong></p>
<p><span dir="auto">According to the minutes of the first clarification meeting, the companies that have also participated in other tenders for the new passenger trains promoted by the current federal administration are </span><a href="https://www.grupocaabsa.com/"><span dir="auto">Caabsa Constructora, </span></a><a href="http://www.crecgi.com/ztgjen/index/index.html"><span dir="auto">China Railway International Group, </span></a><a href="https://construccionesurales.mx/"><span dir="auto">Construcciones Urales, </span></a><strong><span dir="auto">Construcciones y Maquinaria,</span></strong><span dir="auto"> Constructora de Proyectos Viales de México (a subsidiary of OHLA), </span><a href="https://www.grupogp.com.mx/"><span dir="auto"> Constructora Garza Ponce, and  </span></a><strong><span dir="auto">Contratista General de América Latina.</span></strong></p>
<p><span dir="auto">As well as </span><a href="https://grupoindi.mx/"><span dir="auto">Gami Ingeniería e Instalaciones</span></a><span dir="auto"> , </span><a href="https://ica.com.mx/"><span dir="auto">ICA Constructora</span></a><span dir="auto"> , </span><a href="https://grupoidinsa.com/"><span dir="auto">Impulsora de Desarrollo Integral, </span></a><strong><span dir="auto">Ingeniería y Desarrollo Inmobiliario de México, </span></strong><a href="https://jaguaringenieros.mx/"><span dir="auto">Jaguar Ingenieros Constructores, </span></a><a href="https://peninsulaconstructora.com/"><span dir="auto">La Peninsular Compañía Constructora, </span></a><a href="https://careers.mota-engil.com/?locale=es_ES&amp;previewLink=true&amp;referrerSave=false"><span dir="auto">Mota-Engil México, </span></a><a href="https://www.ccicsa.com.mx/"><span dir="auto">Operadora CICSA </span></a><span dir="auto"> (a subsidiary of </span><a href="https://www.carso.com.mx/grupo-carso/"><span dir="auto">Grupo Carso), </span></a><a href="https://www.prodemex.com/"><span dir="auto">Prodemex Construcciones, and </span></a><a href="https://www.prodemex.com/"><span dir="auto">Promotora y Desarrolladora Mexicana.</span></a></p>
<p><span dir="auto">In addition to </span><strong><span dir="auto">Proveedora de Materiales del Norte, </span></strong><a href="https://recal-mexico.com/"><span dir="auto">Recal Estructuras</span></a><span dir="auto"> ,  </span><a href="https://recsa.mx/"><span dir="auto">Regiomontana de Construcción y Servicios</span></a><span dir="auto"> , and </span><a href="https://www.nge.fr/es/"><span dir="auto">TSO-NGE México</span></a><span dir="auto"> .</span></p>
<p><span dir="auto">The ARTF reiterated that the opening of proposals will take place on December 2nd, and that the date for the announcement of the winning bid will be revealed, as well as the start of construction on January 16, 2026, with </span><strong><span dir="auto"> an execution period of 1,020 calendar</span></strong><span dir="auto"> days</span></p>
<p><span dir="auto">This section is part of the Saltillo-Nuevo Laredo train, which consists of the construction of a 395.77 km railway line, with proposed stations and stops in Derramadero, Saltillo Centro, Ramos Arizpe, García, Santa Catarina, Monterrey Centro, Las Torres, Bustamante, Anáhuac, and Nuevo Laredo Centro.</span></p>
<figure id="attachment_661140" class="wp-caption aligncenter" aria-describedby="caption-attachment-661140"><img decoding="async" class="wp-image-661140 size-full" src="https://t21.com.mx/wp-content/uploads/2025/11/0960-Tren-Saltillo-Nuevo-Laredo-Trazo-propuesto.png" sizes="(max-width: 1114px) 100vw, 1114px" srcset="https://t21.com.mx/wp-content/uploads/2025/11/0960-Tren-Saltillo-Nuevo-Laredo-Trazo-propuesto.png 1114w, https://t21.com.mx/wp-content/uploads/2025/11/0960-Tren-Saltillo-Nuevo-Laredo-Trazo-propuesto-300x204.png 300w, https://t21.com.mx/wp-content/uploads/2025/11/0960-Tren-Saltillo-Nuevo-Laredo-Trazo-propuesto-1024x697.png 1024w, https://t21.com.mx/wp-content/uploads/2025/11/0960-Tren-Saltillo-Nuevo-Laredo-Trazo-propuesto-768x523.png 768w, https://t21.com.mx/wp-content/uploads/2025/11/0960-Tren-Saltillo-Nuevo-Laredo-Trazo-propuesto-600x408.png 600w, https://t21.com.mx/wp-content/uploads/2025/11/0960-Tren-Saltillo-Nuevo-Laredo-Trazo-propuesto-150x102.png 150w, https://t21.com.mx/wp-content/uploads/2025/11/0960-Tren-Saltillo-Nuevo-Laredo-Trazo-propuesto-750x510.png 750w" alt="" width="1114" height="758" data-pin-no-hover="true" /><figcaption id="caption-attachment-661140" class="wp-caption-text"><span dir="auto">Source: ARTF</span></figcaption></figure>
<p><span dir="auto">Comment and follow us on X:  </span><a href="https://twitter.com/evandeltoro"><span dir="auto">@evandeltoro</span></a><span dir="auto">  /  </span><a href="https://twitter.com/GrupoT21"><span dir="auto">@GrupoT21</span></a></p>
<p>El cargo <a href="https://t21.us/more-than-20-companies-compete-for-the-saltillo-nuevo-laredo-train/">More than 20 companies compete for the Saltillo-Nuevo Laredo train</a> apareció primero en <a href="https://t21.us">T21</a>.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>Tender published for Monterrey section of the Saltillo–Nuevo Laredo train</title>
		<link>https://t21.us/tender-published-for-monterrey-section-of-the-saltillo-nuevo-laredo-train/</link>
		
		<dc:creator><![CDATA[T21 Media]]></dc:creator>
		<pubDate>Sat, 25 Oct 2025 23:52:26 +0000</pubDate>
				<category><![CDATA[FEATURED]]></category>
		<category><![CDATA[Railway]]></category>
		<category><![CDATA[ARTF]]></category>
		<category><![CDATA[Monterrey]]></category>
		<category><![CDATA[PASSENGER TRAIN]]></category>
		<category><![CDATA[RAILWAY PTOJECTS]]></category>
		<category><![CDATA[SALTILLO-NUEVO LAREDO TRAIN]]></category>
		<guid isPermaLink="false">https://t21.us/?p=631336</guid>

					<description><![CDATA[<p>The Railway Transport Regulatory Agency (ARTF) published the tender for the construction and design of 30.75 kilometers (km) of the Saltillo–Nuevo Laredo passenger train , segment 15 “B”, Monterrey Metropolitan Zone . In the document, the agency specified that it has an allocation of 351 million 284 thousand 265.16 pesos for this project this year . He explained that the project [&#8230;]</p>
<p>El cargo <a href="https://t21.us/tender-published-for-monterrey-section-of-the-saltillo-nuevo-laredo-train/">Tender published for Monterrey section of the Saltillo–Nuevo Laredo train</a> apareció primero en <a href="https://t21.us">T21</a>.</p>
]]></description>
										<content:encoded><![CDATA[<p><img decoding="async" src="https://t21.com.mx/wp-content/uploads/2025/05/Tren-de-pasajeros-03.jpg" /></p>
<p><span dir="auto">The </span><a href="https://www.gob.mx/artf"><span dir="auto">Railway Transport Regulatory Agency (ARTF)</span></a><span dir="auto"> published the tender for the construction and design of 30.75 kilometers (km) of the </span><strong><span dir="auto">Saltillo–Nuevo Laredo passenger train </span></strong><strong><span dir="auto">, segment 15 “B”, Monterrey Metropolitan Zone</span></strong><span dir="auto"> .</span></p>
<p><span dir="auto">In the document, the agency specified that it has </span><strong><span dir="auto">an allocation of 351 million 284 thousand 265.16 pesos for this project this year</span></strong><span dir="auto"> .</span></p>
<p><span dir="auto">He explained that the project will be carried out in the states of Nuevo León and Tamaulipas, with the goal of connecting the Monterrey Metropolitan Area with Nuevo Laredo.</span></p>
<p><span dir="auto">He reported that the construction site visit will be held on November 3rd, followed by a clarification meeting a day later, and the presentation and </span><strong><span dir="auto">opening of proposals will take place on December 2nd. The date of the tender&#8217;s decision will also be announced</span></strong><span dir="auto"> .</span></p>
<div class="jeg_ad jeg_ad_article jnews_content_inline_ads  ">
<div class="ads-wrapper align-center "><span dir="auto">The ARTF set the start date for the work for January 16, 2026, with </span><strong><span dir="auto">a completion period of 1,020 calendar days</span></strong><span dir="auto"> .</span></div>
</div>
<blockquote><p><em><span dir="auto">&#8220;The work will be carried out under a fast-track</span></em><span dir="auto"> management scheme , with construction beginning in stages as portions of the executive project are completed, without waiting for the entire project to be concluded. This means that work can begin as long as the construction elements of the work being carried out have the corresponding executive project,&#8221; he said.</span></p></blockquote>
<p><span dir="auto">The Saltillo–Nuevo Laredo passenger train project involves the construction of a 395.77 km railway with proposed stations and stops: Derramadero, Saltillo Centro, Ramos Arizpe, García, and Santa Catarina, Monterrey Centro, Las Torres, Bustamante, Anáhuac, and Nuevo Laredo Centro.</span></p>
<p><span dir="auto">It is worth remembering that the ARTF awarded </span><a href="https://ica.com.mx/"><span dir="auto">ICA Constructora</span></a><span dir="auto"> , Infrastructure Construction Company, Constructions and Triturations, El Cajón Construction Company, La Yesca Hydroelectric Company, Puerto Escondido Infrastructure Developer, Infrastructure Operations Controller and ICA Satellite Building, the construction and design of 100.05 km of this train in </span><strong><span dir="auto">segments 16 and 17 Unión San Javier–Arroyo El Sauz</span></strong><span dir="auto"> .</span></p>
<p><span dir="auto">While for </span><a href="https://www.ccicsa.com.mx/"><span dir="auto">Operadora CICSA</span></a><span dir="auto"> and FCC Construcción, it awarded the construction and design of 111 km in </span><strong><span dir="auto">segments 13 and 14, Saltillo–Santa Catarina</span></strong><span dir="auto"> .</span></p>
<p><span dir="auto">For </span><strong><span dir="auto">Gami Engineering and Installations</span></strong><span dir="auto"> , Urales Constructions, Recal Structures and Azvi, awarded the construction and design of 136.28 km in </span><strong><span dir="auto">segments 18, 19 and 20, Arroyo El Sauz–Nuevo Laredo</span></strong><span dir="auto"> .</span></p>
<p><span dir="auto">Comment and follow us on X:  </span><a href="https://twitter.com/evandeltoro"><span dir="auto">@evandeltoro</span></a><span dir="auto">  /  </span><a href="https://twitter.com/GrupoT21"><span dir="auto">@GrupoT21</span></a></p>
<p>El cargo <a href="https://t21.us/tender-published-for-monterrey-section-of-the-saltillo-nuevo-laredo-train/">Tender published for Monterrey section of the Saltillo–Nuevo Laredo train</a> apareció primero en <a href="https://t21.us">T21</a>.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>Gami Engineering and Installations wins contract for the Saltillo-Nuevo Laredo train section</title>
		<link>https://t21.us/gami-engineering-and-installations-wins-contract-for-the-saltillo-nuevo-laredo-train-section/</link>
		
		<dc:creator><![CDATA[T21 Media]]></dc:creator>
		<pubDate>Wed, 08 Oct 2025 00:59:21 +0000</pubDate>
				<category><![CDATA[Railway]]></category>
		<category><![CDATA[Andrés Lajous]]></category>
		<category><![CDATA[ARTF]]></category>
		<category><![CDATA[GAMI ENGINEERING AND INSTALLATIONS]]></category>
		<category><![CDATA[ICA CONSTRUCTION]]></category>
		<category><![CDATA[PASSENGER TRAINS]]></category>
		<category><![CDATA[RAILWAY PROJECTS]]></category>
		<category><![CDATA[SALTILLO-NUEVO LAREDO TRAIN]]></category>
		<guid isPermaLink="false">https://t21.us/?p=630970</guid>

					<description><![CDATA[<p>The consortium led by Gami Engineering and Installations will build and design 136.48 kilometers (km) of the Saltillo-Nuevo Laredo passenger train , segments 18, 19 and 20 Arroyo El Sauz-Nuevo Laredo. According to the tender decision, together with Construcciones Urales , Recal Estructuras and Azvi submitted an offer for 12 billion 669 million 670 thousand 550.55 pesos , the lowest of the three submitted. Meanwhile, the consortium [&#8230;]</p>
<p>El cargo <a href="https://t21.us/gami-engineering-and-installations-wins-contract-for-the-saltillo-nuevo-laredo-train-section/">Gami Engineering and Installations wins contract for the Saltillo-Nuevo Laredo train section</a> apareció primero en <a href="https://t21.us">T21</a>.</p>
]]></description>
										<content:encoded><![CDATA[<p class="p2"><span class="s1"><img decoding="async" class="size-full wp-image-649257 alignnone" src="https://t21.com.mx/wp-content/uploads/2025/06/Tren-de-pasajeros-02.jpg" sizes="(max-width: 1170px) 100vw, 1170px" srcset="https://t21.com.mx/wp-content/uploads/2025/06/Tren-de-pasajeros-02.jpg 1170w, https://t21.com.mx/wp-content/uploads/2025/06/Tren-de-pasajeros-02-300x179.jpg 300w, https://t21.com.mx/wp-content/uploads/2025/06/Tren-de-pasajeros-02-1024x613.jpg 1024w, https://t21.com.mx/wp-content/uploads/2025/06/Tren-de-pasajeros-02-768x459.jpg 768w, https://t21.com.mx/wp-content/uploads/2025/06/Tren-de-pasajeros-02-600x359.jpg 600w, https://t21.com.mx/wp-content/uploads/2025/06/Tren-de-pasajeros-02-150x90.jpg 150w, https://t21.com.mx/wp-content/uploads/2025/06/Tren-de-pasajeros-02-750x449.jpg 750w, https://t21.com.mx/wp-content/uploads/2025/06/Tren-de-pasajeros-02-1140x682.jpg 1140w" alt="" width="1170" height="700" data-pin-no-hover="true" /><br />
<span dir="auto">The consortium led by </span><a href="https://grupoindi.mx/"><span dir="auto">Gami Engineering and Installations</span></a><span dir="auto"> will build and design </span><strong><span dir="auto">136.48 kilometers (km) of the Saltillo-Nuevo Laredo passenger train</span></strong><span dir="auto"> , segments 18, 19 and 20 Arroyo El Sauz-Nuevo Laredo.</span></span></p>
<p class="p2"><span class="s1"><span dir="auto">According to the tender decision, together with </span><a href="https://www.azvi.es/pais/mexico/"><span dir="auto">Construcciones Urales</span></a><span dir="auto"> , </span><a href="https://recalglobal.com/"><span dir="auto">Recal Estructuras</span></a><span dir="auto"> and </span><a href="https://www.azvi.es/"><span dir="auto">Azvi</span></a><span dir="auto"> submitted an offer for </span><strong><span dir="auto">12 billion 669 million 670 thousand 550.55 pesos</span></strong><span dir="auto"> , the lowest of the three submitted.</span></span></p>
<p class="p2"><span class="s1"><span dir="auto">Meanwhile, the consortium led by </span><a href="https://ica.com.mx/home/"><span dir="auto">ICA Constructora</span></a><span dir="auto"> submitted a proposal of 17 billion 131 million 534 thousand 748.22 pesos.</span></span></p>
<p class="p2"><span class="s1"><span dir="auto">The third bid was awarded to </span><a href="https://www.ccicsa.com.mx/"><span dir="auto">Operadora CICSA</span></a><span dir="auto"> and </span><a href="https://www.fccco.mx/"><span dir="auto">FCC Construcción</span></a><span dir="auto"> , with a bid of 17.91 billion 630 thousand 448.94 pesos.</span></span></p>
<p class="p2"><span class="s1"><span dir="auto">The </span><a href="https://www.gob.mx/artf"><span dir="auto">Rail Transport Regulatory Agency (ARTF)</span></a><span dir="auto"> evaluated the proposals by points and percentages, with the winner receiving 88.12 points, the runner-up receiving 85.98 points, and the third-place consortium receiving 75.30 points.</span></span></p>
<p class="p2"><span class="s1"><span dir="auto">The agency specified that </span><strong><span dir="auto">the contract signing will take place on October 10</span></strong><span dir="auto"> , while construction of the project is expected to begin on the 13th of the same month, with a 1,054-day completion period.</span></span></p>
<div class="jeg_ad jeg_ad_article jnews_content_inline_ads  ">
<div class="ads-wrapper align-center "><span dir="auto" style="font-family: -apple-system, BlinkMacSystemFont, 'Segoe UI', Roboto, Oxygen-Sans, Ubuntu, Cantarell, 'Helvetica Neue', sans-serif;">Andrés Lajous, head of the ARTF, indicated that </span><strong style="font-family: -apple-system, BlinkMacSystemFont, 'Segoe UI', Roboto, Oxygen-Sans, Ubuntu, Cantarell, 'Helvetica Neue', sans-serif;"><span dir="auto">tenders related to passenger trains will continue</span></strong><span dir="auto" style="font-family: -apple-system, BlinkMacSystemFont, 'Segoe UI', Roboto, Oxygen-Sans, Ubuntu, Cantarell, 'Helvetica Neue', sans-serif;"> , and one of the next to be announced will be for the purchase of 44 trains for the Mexico-Querétaro, Querétaro-Irapuato, and Saltillo-Nuevo Laredo lines. He also ruled out preference for companies such as those from China.</span></div>
</div>
<blockquote>
<p class="p2"><span class="s1"><span dir="auto">&#8220;I don&#8217;t know why anyone would say that. Look at the bidding processes; the information is public. Right now, we&#8217;re on schedule (with bidding processes),&#8221; he emphasized.</span></span></p>
</blockquote>
<p><span dir="auto">Comment and follow us on X:  </span><a href="https://twitter.com/evandeltoro"><span dir="auto">@evandeltoro</span></a><span dir="auto">  /  </span><a href="https://twitter.com/GrupoT21"><span dir="auto">@GrupoT21</span></a></p>
<p>El cargo <a href="https://t21.us/gami-engineering-and-installations-wins-contract-for-the-saltillo-nuevo-laredo-train-section/">Gami Engineering and Installations wins contract for the Saltillo-Nuevo Laredo train section</a> apareció primero en <a href="https://t21.us">T21</a>.</p>
]]></content:encoded>
					
		
		
			</item>
	</channel>
</rss>
