<?xml version="1.0" encoding="UTF-8"?><rss version="2.0"
	xmlns:content="http://purl.org/rss/1.0/modules/content/"
	xmlns:wfw="http://wellformedweb.org/CommentAPI/"
	xmlns:dc="http://purl.org/dc/elements/1.1/"
	xmlns:atom="http://www.w3.org/2005/Atom"
	xmlns:sy="http://purl.org/rss/1.0/modules/syndication/"
	xmlns:slash="http://purl.org/rss/1.0/modules/slash/"
	>

<channel>
	<title>REMOTE OPERATION archivos - T21</title>
	<atom:link href="https://t21.us/tag/remote-operation/feed/" rel="self" type="application/rss+xml" />
	<link>https://t21.us/tag/remote-operation/</link>
	<description>The leading provider of news in the Transportation and Logistics Sector, including Air, Maritime, Land, and Railway, in Mexico and Latin America.</description>
	<lastBuildDate>Thu, 10 Sep 2026 16:34:31 +0000</lastBuildDate>
	<language>en-US</language>
	<sy:updatePeriod>
	hourly	</sy:updatePeriod>
	<sy:updateFrequency>
	1	</sy:updateFrequency>
	<generator>https://wordpress.org/?v=7.0.4</generator>

<image>
	<url>https://t21.us/wp-content/uploads/2024/04/cropped-t21-favicon-200-32x32-1.png</url>
	<title>REMOTE OPERATION archivos - T21</title>
	<link>https://t21.us/tag/remote-operation/</link>
	<width>32</width>
	<height>32</height>
</image> 
	<item>
		<title>CICE puts new cranes into operation in Veracruz; expands capacity for maritime services</title>
		<link>https://t21.us/cice-puts-new-cranes-into-operation-in-veracruz-expands-capacity-for-maritime-services/</link>
		
		<dc:creator><![CDATA[T21 Media]]></dc:creator>
		<pubDate>Thu, 10 Sep 2026 16:34:31 +0000</pubDate>
				<category><![CDATA[Maritime]]></category>
		<category><![CDATA[CICE GROUP]]></category>
		<category><![CDATA[MARITIME SERVICES]]></category>
		<category><![CDATA[REMOTE OPERATION]]></category>
		<category><![CDATA[SAFE LOADING]]></category>
		<guid isPermaLink="false">https://t21.us/?p=638196</guid>

					<description><![CDATA[<p>The Grupo CICE Semi-Specialized Container and Cargo Terminal , located in the North Bay of the port of Veracruz, opened a new operational stage with the commissioning of two Liebherr P180 LS Multipurpose Rail Cranes (GPR) , equipment with which the company expands its capabilities to serve maritime services and perform maneuvers with different cargo configurations. The integration of [&#8230;]</p>
<p>El cargo <a href="https://t21.us/cice-puts-new-cranes-into-operation-in-veracruz-expands-capacity-for-maritime-services/">CICE puts new cranes into operation in Veracruz; expands capacity for maritime services</a> apareció primero en <a href="https://t21.us">T21</a>.</p>
]]></description>
										<content:encoded><![CDATA[<p><img decoding="async" src="https://t21.com.mx/wp-content/uploads/2026/09/CICE-gruas-cc.jpg" /></p>
<p><a href="https://home.grupocice.com/"><span dir="auto">The Grupo CICE</span></a><span dir="auto"> Semi-Specialized Container and Cargo Terminal , located in the North Bay of the port of Veracruz, opened a new operational stage with the </span><strong><span dir="auto">commissioning of two Liebherr P180 LS Multipurpose Rail Cranes (GPR)</span></strong><span dir="auto"> , equipment with which the company expands its capabilities to serve maritime services and perform maneuvers with different cargo configurations.</span></p>
<p><span dir="auto">The integration of the equipment progressed from the installation phase to commercial operation with the service of two shipping lines. The first was ALTAMIRA EXPRESS, operated by </span><a href="https://www.cma-cgm.com/"><span dir="auto">CMA CGM</span></a><span dir="auto"> , with the arrival of the </span><strong><span dir="auto">vessel ELBBRIDGE</span></strong><span dir="auto"> ; while the second crane became operational with the ZIM GULF TOUCAN service, operated by </span><a href="https://www.zim.com/"><span dir="auto">ZIM Integrated Shipping Services</span></a><span dir="auto"> , during the stopover of the SPYROS V.</span></p>
<blockquote><p><span dir="auto">With these operations, both teams were formally integrated into the work scheme of the North Bay terminal, expanding the resources available to respond to the needs of the </span><strong><span dir="auto">shipping lines</span></strong><span dir="auto"> that call at this facility in the port of Veracruz.</span></p></blockquote>
<p><span dir="auto">One of the key features of the new cranes is precisely their versatility. The Liebherr P180 LS cranes have a </span><strong><span dir="auto">safe lifting capacity of up to 65 tons</span></strong><span dir="auto"> and can reach up to 80 tons using Twin Lift operations, a configuration that allows for the simultaneous handling of two containers.</span></p>
<div class="jeg_preview_slider gallery_1" data-selector="gallery_1">
<div class="jeg_preview_holder">
<div class="jeg_preview_media">
<div class="jeg_preview_media_holder">
<div class="jeg_preview_media_content">
<div class="jeg_preview_media_content_holder_padding">
<div class="jeg_preview_media_content_holder"><img decoding="async" class="jeg_preview_hide" src="https://t21.com.mx/wp-content/uploads/2026/09/CICE3.jpg" /></div>
</div>
</div>
</div>
</div>
</div>
</div>
<p><span dir="auto">For operations requiring higher capacities, the cranes can work in tandem </span><strong><span dir="auto">,</span></strong><span dir="auto"> handling loads between 80 and 100 tons. This feature is particularly relevant for a facility that, in addition to container handling, is designed to handle project cargo, where the dimensions and weights of the components require different operational configurations than those used in conventional containerized cargo handling.</span></p>
<p><span dir="auto">In addition, it has a </span><strong><span dir="auto">capacity of up to 20 rows of containers</span></strong><span dir="auto"> , a feature that expands the possibilities for serving vessels and strengthens the terminal&#8217;s capacity to meet the demands posed by the evolution of maritime services.</span></p>
<p><span dir="auto">The addition of the equipment also has a technological component. The GPR cranes are equipped with </span><strong><span dir="auto">ROS systems for remote operation</span></strong><span dir="auto"> , as well as Active Front End technology, which allows for energy recovery during certain phases of crane operation. In this way, the expansion of physical capabilities is accompanied by tools designed to optimize maneuvers and the performance of port operations.</span></p>
<p><span dir="auto">The commissioning of the two cranes is thus integrated into the operational development of the Semi-Specialized Container and Cargo Terminal Project of Grupo CICE in Bahía Norte, an infrastructure from which the company seeks to increase its capacity to respond to the dynamics of </span><strong><span dir="auto">maritime services</span></strong><span dir="auto"> that connect the port of Veracruz with different markets.</span></p>
<p><span dir="auto">Beyond adding two pieces of equipment to its infrastructure, its commissioning expands Grupo CICE&#8217;s options for handling different types of maneuvers from the same terminal, both for containerized cargo and for operations that demand greater lifting capacities.</span></p>
<p><span dir="auto">Comment and follow us on LinkedIn:  </span><a href="https://www.linkedin.com/company/t21-grupo-comunicai-n-y-medios/"><span dir="auto">@GrupoT21</span></a></p>
<p>El cargo <a href="https://t21.us/cice-puts-new-cranes-into-operation-in-veracruz-expands-capacity-for-maritime-services/">CICE puts new cranes into operation in Veracruz; expands capacity for maritime services</a> apareció primero en <a href="https://t21.us">T21</a>.</p>
]]></content:encoded>
					
		
		
			</item>
	</channel>
</rss>
