<?xml version="1.0" encoding="UTF-8"?><rss version="2.0"
	xmlns:content="http://purl.org/rss/1.0/modules/content/"
	xmlns:wfw="http://wellformedweb.org/CommentAPI/"
	xmlns:dc="http://purl.org/dc/elements/1.1/"
	xmlns:atom="http://www.w3.org/2005/Atom"
	xmlns:sy="http://purl.org/rss/1.0/modules/syndication/"
	xmlns:slash="http://purl.org/rss/1.0/modules/slash/"
	>

<channel>
	<title>RECAL STRUCTURE archivos - T21</title>
	<atom:link href="https://t21.us/tag/recal-structure/feed/" rel="self" type="application/rss+xml" />
	<link>https://t21.us/tag/recal-structure/</link>
	<description>The leading provider of news in the Transportation and Logistics Sector, including Air, Maritime, Land, and Railway, in Mexico and Latin America.</description>
	<lastBuildDate>Fri, 24 Apr 2026 23:43:23 +0000</lastBuildDate>
	<language>en-US</language>
	<sy:updatePeriod>
	hourly	</sy:updatePeriod>
	<sy:updateFrequency>
	1	</sy:updateFrequency>
	<generator>https://wordpress.org/?v=7.0.4</generator>

<image>
	<url>https://t21.us/wp-content/uploads/2024/04/cropped-t21-favicon-200-32x32-1.png</url>
	<title>RECAL STRUCTURE archivos - T21</title>
	<link>https://t21.us/tag/recal-structure/</link>
	<width>32</width>
	<height>32</height>
</image> 
	<item>
		<title>A consortium led by Recal Estructuras will build a section of the Saltillo–Nuevo Laredo train</title>
		<link>https://t21.us/a-consortium-led-by-recal-estructuras-will-build-a-section-of-the-saltillo-nuevo-laredo-train/</link>
		
		<dc:creator><![CDATA[T21 Media]]></dc:creator>
		<pubDate>Fri, 24 Apr 2026 23:43:23 +0000</pubDate>
				<category><![CDATA[FEATURED]]></category>
		<category><![CDATA[Railway]]></category>
		<category><![CDATA[ATTRAPI]]></category>
		<category><![CDATA[PASSENGER TRAIN]]></category>
		<category><![CDATA[RAILWAY PROJECTS]]></category>
		<category><![CDATA[RECAL STRUCTURE]]></category>
		<category><![CDATA[SALTILLO-NUEVO LAREDO TRAIN]]></category>
		<guid isPermaLink="false">https://t21.us/?p=635364</guid>

					<description><![CDATA[<p>The consortium led by Recal Estructuras won the bid for the construction and design of 9.204 kilometers (km) of the Saltillo–Nuevo Laredo passenger train, segment 15 “A2”, Monterrey Metropolitan Area. Together with Constructora Moyeda, Construcciones Urales , Azvi, and Gami Ingeniería e Instalaciones, they were awarded a contract for 10 billion 438 million 249 thousand 060.02 pesos . According to the [&#8230;]</p>
<p>El cargo <a href="https://t21.us/a-consortium-led-by-recal-estructuras-will-build-a-section-of-the-saltillo-nuevo-laredo-train/">A consortium led by Recal Estructuras will build a section of the Saltillo–Nuevo Laredo train</a> apareció primero en <a href="https://t21.us">T21</a>.</p>
]]></description>
										<content:encoded><![CDATA[<p><img decoding="async" src="https://t21.com.mx/wp-content/uploads/2026/04/Sin-titulo-17.jpg" /></p>
<p><span dir="auto">The consortium led by </span><a href="https://recalglobal.com/"><span dir="auto">Recal Estructuras</span></a><span dir="auto"> won the bid for the construction and design of 9.204 kilometers (km) of the Saltillo–Nuevo Laredo passenger train, segment 15 “A2”, Monterrey Metropolitan Area.</span></p>
<p><span dir="auto">Together with Constructora Moyeda, </span><a href="https://construccionesurales.mx/"><span dir="auto">Construcciones Urales</span></a><span dir="auto"> , Azvi, and Gami Ingeniería e Instalaciones, they were awarded </span><strong><span dir="auto">a contract for 10 billion 438 million 249 thousand 060.02 pesos</span></strong><span dir="auto"> .</span></p>
<p><span dir="auto">According to the tender ruling, the consortia led by </span><strong><span dir="auto">Impulsora de Desarrollo Integral</span></strong><span dir="auto"> , as well as </span><strong><span dir="auto">Proveedora de Materiales del Norte</span></strong><span dir="auto"> , and Tordec were rejected for not meeting the required requirements.</span></p>
<p><span dir="auto">Meanwhile, along with Recal Estructuras, </span><a href="https://www.ica.com.mx/"><span dir="auto">ICA Constructora</span></a><span dir="auto"> and Constructora de Proyectos Viales de México complied with the requirements established by the </span><a href="https://www.gob.mx/attrapi/en"><span dir="auto">Agency for Trains and Integrated Public Transport (ATTRAPI)</span></a><span dir="auto"> .</span></p>
<p><span dir="auto">The agency specified that </span><strong><span dir="auto">the work will begin on May 1st</span></strong><span dir="auto"> and will have an execution period of 1,007 calendar days.</span></p>
<p><span dir="auto">The Saltillo–Nuevo Laredo train is expected to improve regional connectivity in the Bajío region. This 18.06 km rail line will connect the Monterrey Metropolitan Area, passing through urban and rural areas, as well as industrial sites.</span></p>
<p><span dir="auto">It is worth remembering that the overall </span><strong><span dir="auto"> Saltillo-Nuevo Laredo train project consists of the construction of a 396.3 kilometer (km) railway line </span></strong><span dir="auto"> that will have a double track section without electrification and will run at a maximum speed of 200 kilometers per hour (km/h).</span></p>
<figure id="attachment_673356" class="wp-caption aligncenter" aria-describedby="caption-attachment-673356"><img fetchpriority="high" decoding="async" class="wp-image-673356 size-full" src="https://t21.com.mx/wp-content/uploads/2026/04/Captura-de-pantalla-2026-02-22-213315.png" sizes="(max-width: 950px) 100vw, 950px" srcset="https://t21.com.mx/wp-content/uploads/2026/04/Captura-de-pantalla-2026-02-22-213315.png 950w, https://t21.com.mx/wp-content/uploads/2026/04/Captura-de-pantalla-2026-02-22-213315-300x154.png 300w, https://t21.com.mx/wp-content/uploads/2026/04/Captura-de-pantalla-2026-02-22-213315-768x394.png 768w, https://t21.com.mx/wp-content/uploads/2026/04/Captura-de-pantalla-2026-02-22-213315-600x308.png 600w, https://t21.com.mx/wp-content/uploads/2026/04/Captura-de-pantalla-2026-02-22-213315-150x77.png 150w, https://t21.com.mx/wp-content/uploads/2026/04/Captura-de-pantalla-2026-02-22-213315-750x384.png 750w" alt="" width="950" height="487" data-pin-no-hover="true" /><figcaption id="caption-attachment-673356" class="wp-caption-text"><span dir="auto">Source: ATTRAPI.</span></figcaption></figure>
<p><span dir="auto">Comment and follow us on LinkedIn:  </span><a href="https://www.linkedin.com/in/evangelina-del-toro-31b8104b/"><span dir="auto">@Evangelina del Toro</span></a><span dir="auto">  /  </span><a id="menurj3" class="fui-Link ___1q1shib f2hkw1w f3rmtva f1ewtqcl fyind8e f1k6fduh f1w7gpdv fk6fouc fjoy568 figsok6 f1s184ao f1mk8lai fnbmjn9 f1o700av f13mvf36 f1cmlufx f9n3di6 f1ids18y f1tx3yz7 f1deo86v f1eh06m1 f1iescvh fhgqx19 f1olyrje f1p93eir f1nev41a f1h8hb77 f1lqvz6u f10aw75t fsle3fq f17ae5zn" title="https://www.linkedin.com/company/t21-grupo-comunicai-ny-medios/" href="https://www.linkedin.com/company/t21-grupo-comunicai-n-y-medios/" target="_blank" rel="noreferrer noopener" aria-label="Link @GrupoT21"><span dir="auto">@GrupoT21</span></a></p>
<p>El cargo <a href="https://t21.us/a-consortium-led-by-recal-estructuras-will-build-a-section-of-the-saltillo-nuevo-laredo-train/">A consortium led by Recal Estructuras will build a section of the Saltillo–Nuevo Laredo train</a> apareció primero en <a href="https://t21.us">T21</a>.</p>
]]></content:encoded>
					
		
		
			</item>
	</channel>
</rss>
