<?xml version="1.0" encoding="UTF-8"?><rss version="2.0"
	xmlns:content="http://purl.org/rss/1.0/modules/content/"
	xmlns:wfw="http://wellformedweb.org/CommentAPI/"
	xmlns:dc="http://purl.org/dc/elements/1.1/"
	xmlns:atom="http://www.w3.org/2005/Atom"
	xmlns:sy="http://purl.org/rss/1.0/modules/syndication/"
	xmlns:slash="http://purl.org/rss/1.0/modules/slash/"
	>

<channel>
	<title>RAILWAY TRANSPORT archivos - T21</title>
	<atom:link href="https://t21.us/tag/railway-transport/feed/" rel="self" type="application/rss+xml" />
	<link>https://t21.us/tag/railway-transport/</link>
	<description>The leading provider of news in the Transportation and Logistics Sector, including Air, Maritime, Land, and Railway, in Mexico and Latin America.</description>
	<lastBuildDate>Wed, 10 Jul 2024 18:21:23 +0000</lastBuildDate>
	<language>en-US</language>
	<sy:updatePeriod>
	hourly	</sy:updatePeriod>
	<sy:updateFrequency>
	1	</sy:updateFrequency>
	<generator>https://wordpress.org/?v=7.0</generator>

<image>
	<url>https://t21.us/wp-content/uploads/2024/04/cropped-t21-favicon-200-32x32-1.png</url>
	<title>RAILWAY TRANSPORT archivos - T21</title>
	<link>https://t21.us/tag/railway-transport/</link>
	<width>32</width>
	<height>32</height>
</image> 
	<item>
		<title>Passenger Trains in Sight, What About Freight?</title>
		<link>https://t21.us/passenger-trains-in-sight-what-about-freight/</link>
		
		<dc:creator><![CDATA[T21 Media]]></dc:creator>
		<pubDate>Wed, 10 Jul 2024 18:20:57 +0000</pubDate>
				<category><![CDATA[FEATURED]]></category>
		<category><![CDATA[Railway]]></category>
		<category><![CDATA[AMF]]></category>
		<category><![CDATA[FREIGHT TRAINS]]></category>
		<category><![CDATA[PASSENGER TRAINS]]></category>
		<category><![CDATA[RAILWAY TRANSPORT]]></category>
		<guid isPermaLink="false">https://t21.us/?p=620496</guid>

					<description><![CDATA[<p>When it comes to trains, this six-year period paints itself, although it will only leave 3,500 kilometers (km) of railway tracks for passenger trains out of the 18,000 km promised. While for the freight rail service, a public policy that encourages an increase in the participation of the railway compared to motor transportation continues to be [&#8230;]</p>
<p>El cargo <a href="https://t21.us/passenger-trains-in-sight-what-about-freight/">Passenger Trains in Sight, What About Freight?</a> apareció primero en <a href="https://t21.us">T21</a>.</p>
]]></description>
										<content:encoded><![CDATA[<p><img decoding="async" src="https://t21.com.mx/wp-content/uploads/2024/07/Trenes-01.jpg" /></p>
<p>When it comes to trains, this six-year period paints itself, although it will only leave 3,500 kilometers (km) of railway tracks for passenger trains out of the 18,000 km promised. While for the freight rail service, a <strong>public policy that encourages an increase in the participation of the railway compared to motor transportation continues to be required.</strong></p>
<blockquote><p>“It has not moved for years, remaining at a level of between 25% and 26 percent. Neither in previous administrations, nor in the one that concludes, has this public policy been designed to encourage the use of the means of transportation that, today, is the most efficient, safe and sustainable,&#8221; mentions Juan Carlos Miranda Hernández, general director of JCMIC, railway consulting company.</p></blockquote>
<p>According to the <a href="https://www.gob.mx/artf">Railway Transport Regulatory Agency (ARTF)</a> , the Public Railway Freight Transport Service reached a <strong>historical record in 2023 by moving 131.48 million tons</strong> , an increase of 2.3% compared to 2022, although with an accumulated growth rate of just 0.60% from 2017 to 2023.</p>
<p>While the Mexican Railway System experienced an increase in its extension, going from 26,914 km in 2022 to 27,732 km last year. This growth is mainly attributed to the incorporation of infrastructure projects such as the <strong>Maya Train and the Mexico-Toluca interurban train</strong> .</p>
<p>Miranda Hernández states that <strong>“the rail transport mode had, in general, good progress”</strong> during the six-year term of Andrés Manuel López Obrador, which, among other actions, was promoted by <em>nearshoring</em> , but also non-traditional markets, such as intermodal and automotive, “have been the engine of growth. It remains clear that the concession model for rail freight transportation has been successful, with accumulated investments since 1997 of more than 14 billion dollars, with infrastructure, equipment and technology comparable to those prevailing in the United States and Canada. However, during this six-year term there were three negative effects.”</p>
<p>These, he specifies, are due to the construction of the <a href="https://www.trenmaya.gob.mx/">Mayan Train</a> and the reconstruction of the<a href="https://www.ferroistmo.com.mx/"> </a><a href="https://www.ferroistmo.com.mx/">Tehuantepec Isthmus Railway (FIT)</a> , in which the already reduced cargo traffic in the south-southeast was completely paralyzed towards Tabasco, Campeche and Yucatán, and was seriously affected in Oaxaca and Chiapas, so recovering these traffics &#8211; and developing new ones &#8211; will be a challenge because users, when affected in their logistics chains, developed alternative solutions, some of them long-term or structural. . “Competitiveness in service and rates should be the key factor for the development of cargo in the south-southeast,” he indicates.</p>
<p>It also states that <strong>the blockades of the railways by third parties</strong> , particularly in Michoacán, Sonora, Chihuahua and Veracruz, among others, <strong>seriously affected the service.</strong> The most serious was in the Acámbaro-Lázaro Cárdenas corridor, in which there were blockages lasting more than two months. “The slow response of the federal and state governments affected the competitiveness of the port of Lázaro Cárdenas and the Lázaro Cárdenas-Nuevo Laredo corridor,” he recalls.</p>
<p>For his part, Benjamín Alemán Castilla, founding partner of <a href="https://alttrac.com/">Alttrac</a> and former head of the ARTF, comments that, <strong>without cargo, it will be very difficult for the Maya Train to be profitable.</strong> “The president-elect has also spoken about the loading part, which is a vital component to aspire [1] for this subsystem to have a certain profitability,” he assures.</p>
<p>Comment and follow us on X:<a href="https://twitter.com/evandeltoro">@evandeltoro</a> / <a href="https://twitter.com/GrupoT21">@GrupoT21</a></p>
<p>El cargo <a href="https://t21.us/passenger-trains-in-sight-what-about-freight/">Passenger Trains in Sight, What About Freight?</a> apareció primero en <a href="https://t21.us">T21</a>.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>Less Than Three Months Before Sanctions Implementation, SAT Publishes New Version 3.1 of CCP</title>
		<link>https://t21.us/less-than-three-months-before-sanctions-implementation-sat-publishes-new-version-3-1-of-ccp/</link>
		
		<dc:creator><![CDATA[T21 Media]]></dc:creator>
		<pubDate>Wed, 19 Jun 2024 19:23:45 +0000</pubDate>
				<category><![CDATA[Land]]></category>
		<category><![CDATA[AIR TRANSPORT]]></category>
		<category><![CDATA[COMPLEMENTARY WAYBILL]]></category>
		<category><![CDATA[MOTOR TRANSPORT]]></category>
		<category><![CDATA[RAILWAY TRANSPORT]]></category>
		<category><![CDATA[SEA TRANSPORT]]></category>
		<category><![CDATA[SERVICE TAX ADMINISTRATION]]></category>
		<guid isPermaLink="false">https://t21.us/?p=619865</guid>

					<description><![CDATA[<p>As of July 17, the Carta Porte Complement (CCP) version 3.1 will be required , as announced by the Tax Administration Service (SAT) . The measure was announced a little more than two and a half months after the sanctions for errors or omissions in the issuance of the digital tax receipt over the Internet (CFDI) with CCP [&#8230;]</p>
<p>El cargo <a href="https://t21.us/less-than-three-months-before-sanctions-implementation-sat-publishes-new-version-3-1-of-ccp/">Less Than Three Months Before Sanctions Implementation, SAT Publishes New Version 3.1 of CCP</a> apareció primero en <a href="https://t21.us">T21</a>.</p>
]]></description>
										<content:encoded><![CDATA[<p><img decoding="async" src="https://t21.com.mx/wp-content/uploads/2024/06/CAMION-CARRETERA-TRASERO-1024x658.jpg" alt="A menos de tres meses de la aplicación de sanciones, SAT publica nueva versión 3.1 de CCP" /></p>
<p><strong>As of July 17, the Carta Porte Complement (CCP) version 3.1 will be required</strong> , as announced by the <a href="https://translate.google.com/website?sl=en&amp;tl=es&amp;hl=es&amp;client=webapp&amp;u=https://www.sat.gob.mx/home">Tax Administration Service (SAT)</a> . The measure was announced a little more than two and a half months after the sanctions for errors or omissions in the issuance of the digital tax receipt over the Internet (CFDI) with CCP and ending the coexistence between versions 2.0 and 3.0 of the aforementioned complement.</p>
<blockquote><p>With the update, the tax authority terminates the validity of CCP 3.0 that began on November 25, 2023 and will be completed on July 16, 2024, which means that there is, so far, no period of coexistence between both versions.</p></blockquote>
<p>The new Version 3.1 of the CCP contains updates to the main technical documents:</p>
<ul>
<li>Waybill standard</li>
<li>Waybill scheme</li>
<li>Original string sequence</li>
<li>Error Matrix</li>
<li>Catalog outline</li>
</ul>
<p>Some main changes in CCP 3.1 are the elimination of the Customs Regime field, as well as the incorporation of the Customs Regimes section, integrating the CCPCustoms Regime node and the Customs Regime field with additional validation.</p>
<p>The use of the Tariff Fraction field was modified from required to optional, eliminating its additional validation, and the description of the CveMaterialPeligroso and FolioImpoVUCEM fields was also updated.</p>
<p>The description of the GrossVehicularWeight field was updated, also incorporating the CCP Trailers node as a Container subnode, which contains two fields SubTipoRemCCP and PlacaCCP.</p>
<p><strong>In the Printed Representation:</strong></p>
<ul>
<li>The structure for the Customs Regimes node is added.</li>
<li>Adjusts the structure of the CCP Trailers node within the Container node.</li>
</ul>
<p><strong>QR code:</strong></p>
<ul>
<li>The total number of characters for prefixes is updated from 70 to 74.</li>
<li>The structure of the URL for the validation of the CFDI Carta Porte is modified in the technical documentation, the &amp; character is eliminated before the IdCCP text.</li>
</ul>
<p><strong>Regarding the catalogs, the changes were the following</strong></p>
<ul>
<li>7 keys were added to the c_NumAutorizacionNaviero catalog, for version 3.0 and 3.1 of Carta Porte.</li>
<li>The value of the Hazardous Material column was modified for key 12352124 of the catalog c_ClaveProdServCP, for versions 3.0 and 3.1 of Carta Porte.</li>
<li>Added 64 keys to the c_MaterialDangerous catalog.</li>
<li>Removed 3 keys from the c_MaterialPeligroso catalog in the Excel file, only for version 3.1 of</li>
<li>Door Card.</li>
<li>Key 3316.</li>
<li>Key 3492.</li>
<li>Key 3493.</li>
</ul>
<p>Comment and follow us on X: <a href="https://twitter.com/GrupoT21">@GrupoT21</a></p>
<p>El cargo <a href="https://t21.us/less-than-three-months-before-sanctions-implementation-sat-publishes-new-version-3-1-of-ccp/">Less Than Three Months Before Sanctions Implementation, SAT Publishes New Version 3.1 of CCP</a> apareció primero en <a href="https://t21.us">T21</a>.</p>
]]></content:encoded>
					
		
		
			</item>
	</channel>
</rss>
