<?xml version="1.0" encoding="UTF-8"?><rss version="2.0"
	xmlns:content="http://purl.org/rss/1.0/modules/content/"
	xmlns:wfw="http://wellformedweb.org/CommentAPI/"
	xmlns:dc="http://purl.org/dc/elements/1.1/"
	xmlns:atom="http://www.w3.org/2005/Atom"
	xmlns:sy="http://purl.org/rss/1.0/modules/syndication/"
	xmlns:slash="http://purl.org/rss/1.0/modules/slash/"
	>

<channel>
	<title>RAILWAY PROJECTS archivos - T21</title>
	<atom:link href="https://t21.us/tag/railway-projects/feed/" rel="self" type="application/rss+xml" />
	<link>https://t21.us/tag/railway-projects/</link>
	<description>The leading provider of news in the Transportation and Logistics Sector, including Air, Maritime, Land, and Railway, in Mexico and Latin America.</description>
	<lastBuildDate>Tue, 11 Aug 2026 22:48:07 +0000</lastBuildDate>
	<language>en-US</language>
	<sy:updatePeriod>
	hourly	</sy:updatePeriod>
	<sy:updateFrequency>
	1	</sy:updateFrequency>
	<generator>https://wordpress.org/?v=7.0.4</generator>

<image>
	<url>https://t21.us/wp-content/uploads/2024/04/cropped-t21-favicon-200-32x32-1.png</url>
	<title>RAILWAY PROJECTS archivos - T21</title>
	<link>https://t21.us/tag/railway-projects/</link>
	<width>32</width>
	<height>32</height>
</image> 
	<item>
		<title>ATTRAPI launches tender for section II of the Querétaro-Saltillo train</title>
		<link>https://t21.us/attrapi-launches-tender-for-section-ii-of-the-queretaro-saltillo-train/</link>
		
		<dc:creator><![CDATA[T21 Media]]></dc:creator>
		<pubDate>Tue, 11 Aug 2026 22:48:07 +0000</pubDate>
				<category><![CDATA[FEATURED]]></category>
		<category><![CDATA[Railway]]></category>
		<category><![CDATA[ATTRAPI]]></category>
		<category><![CDATA[CONSTRUCTION]]></category>
		<category><![CDATA[RAILWAY]]></category>
		<category><![CDATA[RAILWAY PROJECTS]]></category>
		<guid isPermaLink="false">https://t21.us/?p=637612</guid>

					<description><![CDATA[<p>The Agency for Trains and Integrated Public Transport (ATTRAPI) launched the call for bids for the construction and design of 82 kilometers (km) of section II of the Querétaro-Saltillo train , Querétaro-San Luis Potosí section, San Miguel de Allende-Villa de Reyes subsection, chainage from km 68+000 to km 150+000. According to the document, representatives from Holcim Mexico Operations , Calzada [&#8230;]</p>
<p>El cargo <a href="https://t21.us/attrapi-launches-tender-for-section-ii-of-the-queretaro-saltillo-train/">ATTRAPI launches tender for section II of the Querétaro-Saltillo train</a> apareció primero en <a href="https://t21.us">T21</a>.</p>
]]></description>
										<content:encoded><![CDATA[<p><img decoding="async" src="https://t21.com.mx/wp-content/uploads/2026/08/ATTRAPI.jpg" /></p>
<p><strong><span dir="auto">The </span><a href="https://www.gob.mx/attrapi"><span dir="auto">Agency for Trains and Integrated Public Transport (ATTRAPI)</span></a><span dir="auto"> launched the call for bids for the construction and design of 82 kilometers (km) of section II of the Querétaro-Saltillo train</span></strong><span dir="auto"> , Querétaro-San Luis Potosí section, San Miguel de Allende-Villa de Reyes subsection, chainage from km 68+000 to km 150+000.</span></p>
<p><span dir="auto">According to the document, representatives from </span><a href="https://www.holcim.com.mx/"><span dir="auto">Holcim Mexico Operations</span></a><span dir="auto"> , Calzada Construcciones, </span><a href="https://www.ica.com.mx/"><span dir="auto">ICA Constructora</span></a><span dir="auto"> , </span><a href="https://www.vise.com.mx/"><span dir="auto">VISE</span></a><span dir="auto"> , and </span><a href="https://www.gpconstruccion.com.mx/"><span dir="auto">GP Construcción</span></a><span dir="auto"> were present during the first working visit .</span></p>
<p><span dir="auto">In addition to </span><a href="https://espanol.ccccltd.cn/"><span dir="auto">China Communications Construction Company Mexico</span></a><span dir="auto"> , Regiomontana de Construcción y Servicios, and Proveedora de Materiales del Norte.</span></p>
<p><strong><span dir="auto">The tender includes the construction of viaducts, tunnels, bridges, railway underpasses, railway overpasses and pedestrian bridges in Guanajuato</span></strong><span dir="auto"> , with the purpose of connecting the cities of Querétaro and San Miguel de Allende.</span></p>
<p><span dir="auto">The agency specified that the first and second clarification meetings will be on October 13 and 31, respectively, while the submission of bids will be on October 2, and the decision will be announced on the same day.</span></p>
<p><span dir="auto">According to ATTRAPI, the work will begin on November 2, 2026, with </span><strong><span dir="auto">a completion time of 1,003 calendar days</span></strong><span dir="auto"> .</span></p>
<p><span data-teams="true"><span dir="auto">Comment and follow us on LinkedIn:  </span><a id="menurjdo" class="fui-Link ___1q1shib f2hkw1w f3rmtva f1ewtqcl fyind8e f1k6fduh f1w7gpdv fk6fouc fjoy568 figsok6 f1s184ao f1mk8lai fnbmjn9 f1o700av f13mvf36 f1cmlufx f9n3di6 f1ids18y f1tx3yz7 f1deo86v f1eh06m1 f1iescvh fhgqx19 f1olyrje f1p93eir f1nev41a f1h8hb77 f1lqvz6u f10aw75t fsle3fq f17ae5zn" title="https://www.linkedin.com/in/evangelina-del-toro-31b8104b/" href="https://www.linkedin.com/in/evangelina-del-toro-31b8104b/" target="_blank" rel="noreferrer noopener" aria-label="Link @Evangelina del Toro"><span dir="auto">@Evangelina del Toro</span></a><span dir="auto">  /  </span><a id="menurjdq" class="fui-Link ___1q1shib f2hkw1w f3rmtva f1ewtqcl fyind8e f1k6fduh f1w7gpdv fk6fouc fjoy568 figsok6 f1s184ao f1mk8lai fnbmjn9 f1o700av f13mvf36 f1cmlufx f9n3di6 f1ids18y f1tx3yz7 f1deo86v f1eh06m1 f1iescvh fhgqx19 f1olyrje f1p93eir f1nev41a f1h8hb77 f1lqvz6u f10aw75t fsle3fq f17ae5zn" title="https://www.linkedin.com/company/t21-grupo-comunicai-ny-medios/" href="https://www.linkedin.com/company/t21-grupo-comunicai-n-y-medios/" target="_blank" rel="noreferrer noopener" aria-label="Link @GrupoT21"><span dir="auto">@GrupoT21</span></a></span></p>
<p>El cargo <a href="https://t21.us/attrapi-launches-tender-for-section-ii-of-the-queretaro-saltillo-train/">ATTRAPI launches tender for section II of the Querétaro-Saltillo train</a> apareció primero en <a href="https://t21.us">T21</a>.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>Production value of construction companies, with solid foundations in May</title>
		<link>https://t21.us/production-value-of-construction-companies-with-solid-foundations-in-may/</link>
		
		<dc:creator><![CDATA[T21 Media]]></dc:creator>
		<pubDate>Fri, 24 Jul 2026 22:44:37 +0000</pubDate>
				<category><![CDATA[Economy]]></category>
		<category><![CDATA[CONSTRUCTION]]></category>
		<category><![CDATA[ENEC]]></category>
		<category><![CDATA[INEGI WORKS]]></category>
		<category><![CDATA[MEXICAN ECONOMY]]></category>
		<category><![CDATA[NATIONAL SURVEY OF CONSTRUCTION COMPANIES]]></category>
		<category><![CDATA[RAILWAY PROJECTS]]></category>
		<guid isPermaLink="false">https://t21.us/?p=637232</guid>

					<description><![CDATA[<p>The production value of construction companies in May 2026 grew 2.7% on a monthly basis , while in its annual comparison it registered an increase of 7.5%, according to the results of the National Survey of Construction Companies (ENEC), prepared by the National Institute of Statistics and Geography (Inegi) . In the fifth month of the year, on [&#8230;]</p>
<p>El cargo <a href="https://t21.us/production-value-of-construction-companies-with-solid-foundations-in-may/">Production value of construction companies, with solid foundations in May</a> apareció primero en <a href="https://t21.us">T21</a>.</p>
]]></description>
										<content:encoded><![CDATA[<p><img decoding="async" src="https://t21.com.mx/wp-content/uploads/2026/07/ENEC2.jpg" /></p>
<p><strong><span dir="auto">The production value of construction companies in May 2026 grew 2.7% on a monthly basis</span></strong><span dir="auto"> , while in its annual comparison it registered an increase of 7.5%, according to the results of the National Survey of Construction Companies (ENEC), prepared by the </span><a href="https://www.inegi.org.mx/"><span dir="auto">National Institute of Statistics and Geography (Inegi)</span></a><span dir="auto"> .</span></p>
<p><strong><span dir="auto">In the fifth month of the year, on a monthly basis, construction</span></strong><span dir="auto"> -related works , especially those in the private sector, increased by 0.7 percent. </span><strong><span dir="auto">Water, irrigation, and sanitation</span></strong><span dir="auto"> increased by 14.3%, achieving its second consecutive month of strong performance.</span></p>
<p><strong><span dir="auto">Transport</span></strong><span dir="auto"> works , such as the construction of passenger trains, recovered in May 2026, with a monthly increase of 9.3%, after the drop last April.</span></p>
<p><span dir="auto">Regarding the number of </span><strong><span dir="auto">people employed </span></strong><span dir="auto"> in the construction sector, Inegi reported a monthly increase of 0.8% and an annual increase of 0.3%.</span></p>
<p><span dir="auto">Hours </span><strong><span dir="auto">worked</span></strong><span dir="auto"> showed mixed performance in May 2026. This item showed a 0.5% increase on a monthly basis, but had a year-on-year decline of 0.1%, reflecting a slight deterioration in this indicator.</span></p>
<p><span dir="auto">Meanwhile, </span><strong><span dir="auto">average real wages</span></strong><span dir="auto"> performed well, increasing by 0.3% monthly and 3.3% annually, which improved the income of construction workers.</span></p>
<figure id="attachment_679292" class="wp-caption aligncenter" aria-describedby="caption-attachment-679292"><img fetchpriority="high" decoding="async" class="wp-image-679292 size-full" src="https://t21.com.mx/wp-content/uploads/2026/07/ENECMAY26.jpg" sizes="(max-width: 969px) 100vw, 969px" srcset="https://t21.com.mx/wp-content/uploads/2026/07/ENECMAY26.jpg 969w, https://t21.com.mx/wp-content/uploads/2026/07/ENECMAY26-300x63.jpg 300w, https://t21.com.mx/wp-content/uploads/2026/07/ENECMAY26-768x162.jpg 768w, https://t21.com.mx/wp-content/uploads/2026/07/ENECMAY26-600x126.jpg 600w, https://t21.com.mx/wp-content/uploads/2026/07/ENECMAY26-150x32.jpg 150w, https://t21.com.mx/wp-content/uploads/2026/07/ENECMAY26-750x158.jpg 750w" alt="" width="969" height="204" data-pin-no-hover="true" /><figcaption id="caption-attachment-679292" class="wp-caption-text"><span dir="auto">Source: Inegi.</span></figcaption></figure>
<p><span dir="auto">Construction is one of the sectors that contribute to economic growth and job creation in the country, derived from private and public projects, such as railway works (Saltillo-Nuevo Laredo train), and the </span><strong><span dir="auto">Economic Development Poles for Well-being</span></strong><span dir="auto"> , which will promote the construction of industrial parks in several states of the country such as Hidalgo, Michoacán and Guanajuato, among others.</span></p>
<p><span dir="auto">However, despite the rebound shown last May, construction, like other industries, faces a slow recovery, so investments in the sector are viewed with caution and uncertainty, generated by internal factors such as a weak economy, and external factors, such as the United States tariff measures and the conflict in the Middle East, which have increased the cost of some important inputs for this industry, including steel, aluminum and PVC pipes.</span></p>
<p><span dir="auto">According to the </span><a href="https://canadevi.com.mx/"><span dir="auto">National Chamber of the Housing Development and Promotion Industry (Canadevi)</span></a><span dir="auto"> , the conflict in the Middle East has increased housing construction costs in Mexico by up to 5%.</span></p>
<p><span dir="auto">Comment and follow us on LinkedIn:  </span><a href="https://www.linkedin.com/company/t21-grupo-comunicai-n-y-medios/"><span dir="auto">@GrupoT21</span></a></p>
<p>El cargo <a href="https://t21.us/production-value-of-construction-companies-with-solid-foundations-in-may/">Production value of construction companies, with solid foundations in May</a> apareció primero en <a href="https://t21.us">T21</a>.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>GMXT reports increased revenue in Q2 2026; seeks to invest in Brazil and Argentina</title>
		<link>https://t21.us/gmxt-reports-increased-revenue-in-q2-2026-seeks-to-invest-in-brazil-and-argentina/</link>
		
		<dc:creator><![CDATA[T21 Media]]></dc:creator>
		<pubDate>Thu, 23 Jul 2026 21:28:28 +0000</pubDate>
				<category><![CDATA[FEATURED]]></category>
		<category><![CDATA[Railway]]></category>
		<category><![CDATA[Argentina]]></category>
		<category><![CDATA[BRAZIL]]></category>
		<category><![CDATA[GMXT]]></category>
		<category><![CDATA[MEXICO TRANSPORT GROUP]]></category>
		<category><![CDATA[Quarterly report]]></category>
		<category><![CDATA[Rail Transport]]></category>
		<category><![CDATA[RAILWAY PROJECTS]]></category>
		<guid isPermaLink="false">https://t21.us/?p=637196</guid>

					<description><![CDATA[<p>Grupo México Transportes (GMXT) reported a 14.3% increase in its total revenue during the second quarter of 2026 (2Q26) , and confirmed that it is looking to invest in the railway sector of Brazil and Argentina. “We are analyzing different investment opportunities seeking to generate value for our shareholders; these opportunities include railway operations in Brazil through acquisition [&#8230;]</p>
<p>El cargo <a href="https://t21.us/gmxt-reports-increased-revenue-in-q2-2026-seeks-to-invest-in-brazil-and-argentina/">GMXT reports increased revenue in Q2 2026; seeks to invest in Brazil and Argentina</a> apareció primero en <a href="https://t21.us">T21</a>.</p>
]]></description>
										<content:encoded><![CDATA[<p><img decoding="async" src="https://t21.com.mx/wp-content/uploads/2025/11/Sin-titulo-5.jpg" /></p>
<p><strong><a href="https://gmxt.mx/es/inicio/"><span dir="auto">Grupo México Transportes (GMXT)</span></a><span dir="auto"> reported a 14.3% increase in its total revenue </span></strong><strong><span dir="auto">during the second quarter of 2026 (2Q26)</span></strong><span dir="auto"> , and confirmed that it is looking to invest in the railway sector of Brazil and Argentina.</span></p>
<blockquote><p><span dir="auto">“We are analyzing different investment opportunities seeking to generate value for our shareholders; these opportunities include railway operations in Brazil through acquisition and in Argentina through the bidding of railway assets for rail freight movement,” the company stated.</span></p></blockquote>
<p><span dir="auto">He specified that in the case of Brazil there is the possibility of a stake in a relevant asset of the country, with a view to </span><strong><span dir="auto">growing volumes in a diversified manner and improving efficiency</span></strong><span dir="auto"> .</span></p>
<p><span dir="auto">For Argentina, he explained that they expect the corresponding tender to be launched, which, </span><strong><span dir="auto">if it is a comprehensive model, could be attractive to the company</span></strong><span dir="auto"> , unlike the divided model ( </span><em><span dir="auto">open access</span></em><span dir="auto"> ) that has proven to generate losses and require subsidies from the government and would not be of interest to </span><a href="https://www.gmexico.com/"><span dir="auto">Grupo México</span></a><span dir="auto"> .</span></p>
<blockquote><p><span dir="auto">“Both offer a significant opportunity for increased volume transport by rail. With our 30 years of experience and advanced technologies, we could integrate them into the aforementioned rail networks and gain market share, higher volumes, and greater efficiencies,” he emphasized.</span></p></blockquote>
<p><span dir="auto">Regarding its Q2 2026 results, </span><strong><span dir="auto">GMXT went from $853,221,000 to $975,238,000 year-on-year</span></strong><span dir="auto"> , growth that was mainly driven by the agricultural, intermodal and automotive segments.</span></p>
<figure id="attachment_679178" class="wp-caption aligncenter" aria-describedby="caption-attachment-679178"><img decoding="async" class="wp-image-679178 size-full" src="https://t21.com.mx/wp-content/uploads/2026/07/GMXT.png" sizes="(max-width: 1207px) 100vw, 1207px" srcset="https://t21.com.mx/wp-content/uploads/2026/07/GMXT.png 1207w, https://t21.com.mx/wp-content/uploads/2026/07/GMXT-300x132.png 300w, https://t21.com.mx/wp-content/uploads/2026/07/GMXT-1024x451.png 1024w, https://t21.com.mx/wp-content/uploads/2026/07/GMXT-768x339.png 768w, https://t21.com.mx/wp-content/uploads/2026/07/GMXT-600x264.png 600w, https://t21.com.mx/wp-content/uploads/2026/07/GMXT-150x66.png 150w, https://t21.com.mx/wp-content/uploads/2026/07/GMXT-750x331.png 750w, https://t21.com.mx/wp-content/uploads/2026/07/GMXT-1140x502.png 1140w" alt="" width="1207" height="532" data-pin-no-hover="true" /><figcaption id="caption-attachment-679178" class="wp-caption-text"><span dir="auto">Source: GMXT.</span></figcaption></figure>
<p><span dir="auto">According to the report sent to the </span><a href="https://www.bmv.com.mx/es"><span dir="auto">Mexican Stock Exchange (BMV)</span></a><span dir="auto"> , EBITDA reached $406 million 648 thousand in Q2 2026, an 8.3% increase year-on-year.</span></p>
<p><span dir="auto">Meanwhile,  </span><strong><span dir="auto">the cargo transported grew 7%</span></strong><span dir="auto"> compared to the same period in 2025, totaling 524,649 cars.</span></p>
<p><strong><span dir="auto">The increase in volume was led by the metals segment</span></strong><span dir="auto"> , with a 26% increase in cars, followed by intermodal which grew 12% and the agricultural segment with a 6% increase.</span></p>
<p><span dir="auto">Comment and follow us on LinkedIn:  </span><a href="https://www.linkedin.com/company/t21-grupo-comunicai-n-y-medios/"><span dir="auto">@GrupoT21</span></a></p>
<p>El cargo <a href="https://t21.us/gmxt-reports-increased-revenue-in-q2-2026-seeks-to-invest-in-brazil-and-argentina/">GMXT reports increased revenue in Q2 2026; seeks to invest in Brazil and Argentina</a> apareció primero en <a href="https://t21.us">T21</a>.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>Predictive maintenance will boost rail safety and efficiency: Fracttal</title>
		<link>https://t21.us/predictive-maintenance-will-boost-rail-safety-and-efficiency-fracttal/</link>
		
		<dc:creator><![CDATA[T21 Media]]></dc:creator>
		<pubDate>Tue, 21 Jul 2026 22:39:55 +0000</pubDate>
				<category><![CDATA[FEATURED]]></category>
		<category><![CDATA[Railway]]></category>
		<category><![CDATA[artificial intelligence]]></category>
		<category><![CDATA[FRACTTAL]]></category>
		<category><![CDATA[FREIGHT AND PASSENGER TRAIN]]></category>
		<category><![CDATA[LOGISTICS COMPETITIVENESS]]></category>
		<category><![CDATA[MAINTENANCE]]></category>
		<category><![CDATA[railway infrastructure]]></category>
		<category><![CDATA[RAILWAY PROJECTS]]></category>
		<guid isPermaLink="false">https://t21.us/?p=637143</guid>

					<description><![CDATA[<p>The adoption of predictive maintenance schemes based on artificial intelligence (AI) and the Internet of Things (IoT) will be fundamental to preventing failures, strengthening operational safety, optimizing spending on railway infrastructure and bolstering Mexico&#8217;s logistical competitiveness, said Tomás Allen, commercial vice president of Fracttal , a company specializing in the digital maintenance of equipment and physical assets. “The rail [&#8230;]</p>
<p>El cargo <a href="https://t21.us/predictive-maintenance-will-boost-rail-safety-and-efficiency-fracttal/">Predictive maintenance will boost rail safety and efficiency: Fracttal</a> apareció primero en <a href="https://t21.us">T21</a>.</p>
]]></description>
										<content:encoded><![CDATA[<p><img decoding="async" src="https://t21.com.mx/wp-content/uploads/2026/07/Sin-titulo-12.jpg" /></p>
<p><strong><span dir="auto">The adoption of predictive maintenance</span></strong><span dir="auto"> schemes based on artificial intelligence (AI) and the Internet of Things (IoT) will be fundamental to preventing failures, strengthening operational safety, optimizing spending on railway infrastructure and bolstering Mexico&#8217;s logistical competitiveness, said Tomás Allen, commercial vice president of </span><a href="https://www.fracttal.com/es/"><span dir="auto">Fracttal</span></a><span dir="auto"> , a company specializing in the digital maintenance of equipment and physical assets.</span></p>
<blockquote><p><span dir="auto">“The rail infrastructure of the future cannot be managed solely through periodic inspections and manual reports. As the complexity of networks increases, the ability to anticipate failures using artificial intelligence will be a requirement to guarantee service continuity and the safety of millions of users,” Allen said.</span></p></blockquote>
<p><span dir="auto">Predictive maintenance combines IoT-connected sensors, cloud platforms, and AI algorithms capable of continuously monitoring the condition of tracks, turnouts, brakes, electrical equipment, and other critical assets.</span></p>
<p><strong><span dir="auto">With this information, it is possible to identify wear patterns</span></strong><span dir="auto"> , prioritize interventions, and reduce unscheduled downtime before it evolves into major failures, the specialist pointed out.</span></p>
<p><span dir="auto">For the railway sector, </span><strong><span dir="auto">this technological evolution also represents a financial decision</span></strong><span dir="auto"> , as various international operators have incorporated predictive maintenance strategies to improve the availability of their assets, reduce repair costs and strengthen operational safety, relying on advanced analytics and AI to process information generated by sensors installed in the infrastructure in this transport.</span></p>
<p><span dir="auto">In Mexico, Tomás Allen pointed out, the challenge takes on a strategic dimension, since the federal government plans </span><strong><span dir="auto">to build at least 2,377 kilometers of new railway lines during the six-year term</span></strong><span dir="auto"> , in addition to strengthening the Interoceanic Train and other railway systems.</span></p>
<blockquote><p><span dir="auto">“ </span><strong><span dir="auto">In railway infrastructure, the cost of an unplanned failure is often several times the cost of a preventive intervention</span></strong><span dir="auto"> , considering operational disruptions, logistical impacts, asset repairs and safety risks,” Allen emphasized.</span></p></blockquote>
<p><span dir="auto">In addition to passenger transport, modernizing maintenance will be a key element in </span><strong><span dir="auto">strengthening the country&#8217;s logistical competitiveness</span></strong><span dir="auto"> , since, he stated, a more reliable infrastructure favors the continuity of freight transport, reduces downtime and improves the use of public and private investments in a context where the railway is regaining prominence within supply chains.</span></p>
<p><span dir="auto">Therefore, with the new generation of railway projects under development, he considered that </span><strong><span dir="auto">the digitization of maintenance will cease to be a complementary tool</span></strong><span dir="auto"> and become an essential component of the operation.</span></p>
<p><span dir="auto">Incorporating technologies, advanced analytics, and artificial intelligence from the early stages will protect long-term investments, strengthen operational security, and increase the resilience of an infrastructure that will be crucial for Mexico&#8217;s mobility and economic competitiveness.</span></p>
<p><span dir="auto">Comment and follow us on LinkedIn:  </span><a href="https://www.linkedin.com/company/t21-grupo-comunicai-n-y-medios/"><span dir="auto">@GrupoT21</span></a></p>
<p>El cargo <a href="https://t21.us/predictive-maintenance-will-boost-rail-safety-and-efficiency-fracttal/">Predictive maintenance will boost rail safety and efficiency: Fracttal</a> apareció primero en <a href="https://t21.us">T21</a>.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>Second phase of passenger train construction begins in Mexico</title>
		<link>https://t21.us/second-phase-of-passenger-train-construction-begins-in-mexico/</link>
		
		<dc:creator><![CDATA[T21 Media]]></dc:creator>
		<pubDate>Thu, 16 Jul 2026 23:56:53 +0000</pubDate>
				<category><![CDATA[FEATURED]]></category>
		<category><![CDATA[Railway]]></category>
		<category><![CDATA[ATTRAPI]]></category>
		<category><![CDATA[CONSTRUCTION]]></category>
		<category><![CDATA[MEXICAN ASSOCIATION OF HIGH ENGINEERING]]></category>
		<category><![CDATA[PASSENGER TRAINS]]></category>
		<category><![CDATA[RAILWAY PROJECTS]]></category>
		<guid isPermaLink="false">https://t21.us/?p=637075</guid>

					<description><![CDATA[<p>The Mexican government has started the second stage of passenger train construction, whose works and tenders will be in charge of the Ministry of National Defense (Defensa) and the Agency of Trains and Integrated Public Transport (ATTRAPI) . “We finished all the technical studies, basic engineering and demand studies and the Felipe Ángeles Engineering Group will execute the Irapuato-León, [&#8230;]</p>
<p>El cargo <a href="https://t21.us/second-phase-of-passenger-train-construction-begins-in-mexico/">Second phase of passenger train construction begins in Mexico</a> apareció primero en <a href="https://t21.us">T21</a>.</p>
]]></description>
										<content:encoded><![CDATA[<p><img decoding="async" src="https://t21.com.mx/wp-content/uploads/2026/07/Sin-titulo-10.jpg" /></p>
<p><span dir="auto">The Mexican government has started the second stage of passenger train construction, whose works and tenders will be in charge of the </span><a href="https://www.gob.mx/defensa/es/"><span dir="auto">Ministry of National Defense (Defensa)</span></a><span dir="auto"> and the </span><a href="https://www.gob.mx/attrapi/es"><span dir="auto">Agency of Trains and Integrated Public Transport (ATTRAPI)</span></a><span dir="auto"> .</span></p>
<blockquote><p><span dir="auto">“We finished all the technical studies, basic engineering and demand studies and the Felipe Ángeles Engineering Group will execute the Irapuato-León, León-Guadalajara and we have already launched the international public tender because we want more participation and more bids for the first section that goes from Querétaro to San Miguel de Allende, which is the Querétaro-San Luis Potosí,” said Efraín Deschamps Gutiérrez de Velasco, director of Works at ATTRAPI.</span></p></blockquote>
<figure id="attachment_678828" class="wp-caption aligncenter" aria-describedby="caption-attachment-678828"><img decoding="async" class="wp-image-678828 size-full" src="https://t21.com.mx/wp-content/uploads/2026/07/trenes-3.png" sizes="(max-width: 1047px) 100vw, 1047px" srcset="https://t21.com.mx/wp-content/uploads/2026/07/trenes-3.png 1047w, https://t21.com.mx/wp-content/uploads/2026/07/trenes-3-300x168.png 300w, https://t21.com.mx/wp-content/uploads/2026/07/trenes-3-1024x574.png 1024w, https://t21.com.mx/wp-content/uploads/2026/07/trenes-3-768x431.png 768w, https://t21.com.mx/wp-content/uploads/2026/07/trenes-3-600x336.png 600w, https://t21.com.mx/wp-content/uploads/2026/07/trenes-3-150x84.png 150w, https://t21.com.mx/wp-content/uploads/2026/07/trenes-3-750x420.png 750w" alt="" width="1047" height="587" data-pin-no-hover="true" /><figcaption id="caption-attachment-678828" class="wp-caption-text"><span dir="auto">Source: ATTRAPI.</span></figcaption></figure>
<p><span dir="auto">He announced that next Monday they will launch the bidding process for the San Luis Potosí to Saltillo section, while they continue with the demand and pre-investment studies and basic engineering for the Mazatlán-Los Mochis section, although he clarified that he does not yet have an authorized start date.</span></p>
<p><span dir="auto">During his participation in the </span><strong><span dir="auto">XXV National Meeting of Land Transportation</span></strong><span dir="auto"> , organized by the </span><a href="https://amivtac.org/"><span dir="auto">Mexican Association of Land Transportation Engineering (AMIVTAC)</span></a><span dir="auto"> which is taking place in Morelia, Michoacán, he reiterated that for these sections there will only be dedicated lanes, so &#8221; </span><strong><span dir="auto">there will be no interaction with freight lanes</span></strong><span dir="auto"> , nor level crossings; we have maximum speeds of 160 to 200 kilometers per hour.&#8221;</span></p>
<p><span dir="auto">He also mentioned that </span><strong><span dir="auto">the third phase, planned</span></strong><span dir="auto"> for approximately 1,100 kilometers, will cover the Pacific Corridor, specifically the Guadalajara-Tepic, Mazatlán-Los Mochis (currently under development with no start date for construction), Los Mochis-Guaymas, and Guaymas-Hermosillo sections. A potential fourth phase would include the Tepic-Mazatlán and Hermosillo-Nogales sections.</span></p>
<blockquote><p><span dir="auto">“ </span><strong><span dir="auto">We are building an integrated national rail network, connected </span></strong><strong><span dir="auto">to other modes of transport</span></strong><span dir="auto"> . Each of the stations we are building also includes an integrated space for urban public transport. We want to consolidate a modern rail system,” emphasized Efraín Deschamps Gutiérrez de Velasco.</span></p></blockquote>
<p><span dir="auto">Regarding the first stage, he recalled that two sections are being built by the Felipe Ángeles Engineering Group, the Mexico-AIFA and AIFA-Pachuca, and Mexico-Queretaro, while ATTRAPI, through tenders, is building the Queretaro-Irapuato and Saltillo-Nuevo Laredo sections.</span></p>
<figure id="attachment_678829" class="wp-caption aligncenter" aria-describedby="caption-attachment-678829"><img decoding="async" class="wp-image-678829 size-full" src="https://t21.com.mx/wp-content/uploads/2026/07/trenes-2.png" sizes="(max-width: 1040px) 100vw, 1040px" srcset="https://t21.com.mx/wp-content/uploads/2026/07/trenes-2.png 1040w, https://t21.com.mx/wp-content/uploads/2026/07/trenes-2-300x157.png 300w, https://t21.com.mx/wp-content/uploads/2026/07/trenes-2-1024x537.png 1024w, https://t21.com.mx/wp-content/uploads/2026/07/trenes-2-768x402.png 768w, https://t21.com.mx/wp-content/uploads/2026/07/trenes-2-600x314.png 600w, https://t21.com.mx/wp-content/uploads/2026/07/trenes-2-150x79.png 150w, https://t21.com.mx/wp-content/uploads/2026/07/trenes-2-750x393.png 750w" alt="" width="1040" height="545" data-pin-no-hover="true" /><figcaption id="caption-attachment-678829" class="wp-caption-text"><span dir="auto">Source: ATTRAPI.</span></figcaption></figure>
<p><span dir="auto">Regarding the Saltillo-Nuevo Laredo section, he said that it is the longest stretch that is already under construction and covers 396.34 kilometers from the Derramadero industrial zone to Nuevo Laredo.</span></p>
<figure id="attachment_678830" class="wp-caption aligncenter" aria-describedby="caption-attachment-678830"><img decoding="async" class="wp-image-678830 size-full" src="https://t21.com.mx/wp-content/uploads/2026/07/tren-Saltillo.png" sizes="(max-width: 1032px) 100vw, 1032px" srcset="https://t21.com.mx/wp-content/uploads/2026/07/tren-Saltillo.png 1032w, https://t21.com.mx/wp-content/uploads/2026/07/tren-Saltillo-300x163.png 300w, https://t21.com.mx/wp-content/uploads/2026/07/tren-Saltillo-1024x558.png 1024w, https://t21.com.mx/wp-content/uploads/2026/07/tren-Saltillo-768x418.png 768w, https://t21.com.mx/wp-content/uploads/2026/07/tren-Saltillo-600x327.png 600w, https://t21.com.mx/wp-content/uploads/2026/07/tren-Saltillo-150x82.png 150w, https://t21.com.mx/wp-content/uploads/2026/07/tren-Saltillo-750x408.png 750w" alt="" width="1032" height="562" data-pin-no-hover="true" /><figcaption id="caption-attachment-678830" class="wp-caption-text"><span dir="auto">Source: ATTRAPI.</span></figcaption></figure>
<p><span dir="auto">Comment and follow us on LinkedIn:  </span><a href="https://www.linkedin.com/in/evangelina-del-toro-31b8104b/"><span dir="auto">@Evangelina del Toro</span></a><span dir="auto">  /  </span><a href="https://www.linkedin.com/company/t21-grupo-comunicai-n-y-medios/"><span dir="auto">@GrupoT21</span></a></p>
<p>El cargo <a href="https://t21.us/second-phase-of-passenger-train-construction-begins-in-mexico/">Second phase of passenger train construction begins in Mexico</a> apareció primero en <a href="https://t21.us">T21</a>.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>A consortium led by Recal Estructuras will build a section of the Saltillo–Nuevo Laredo train</title>
		<link>https://t21.us/a-consortium-led-by-recal-estructuras-will-build-a-section-of-the-saltillo-nuevo-laredo-train/</link>
		
		<dc:creator><![CDATA[T21 Media]]></dc:creator>
		<pubDate>Fri, 24 Apr 2026 23:43:23 +0000</pubDate>
				<category><![CDATA[FEATURED]]></category>
		<category><![CDATA[Railway]]></category>
		<category><![CDATA[ATTRAPI]]></category>
		<category><![CDATA[PASSENGER TRAIN]]></category>
		<category><![CDATA[RAILWAY PROJECTS]]></category>
		<category><![CDATA[RECAL STRUCTURE]]></category>
		<category><![CDATA[SALTILLO-NUEVO LAREDO TRAIN]]></category>
		<guid isPermaLink="false">https://t21.us/?p=635364</guid>

					<description><![CDATA[<p>The consortium led by Recal Estructuras won the bid for the construction and design of 9.204 kilometers (km) of the Saltillo–Nuevo Laredo passenger train, segment 15 “A2”, Monterrey Metropolitan Area. Together with Constructora Moyeda, Construcciones Urales , Azvi, and Gami Ingeniería e Instalaciones, they were awarded a contract for 10 billion 438 million 249 thousand 060.02 pesos . According to the [&#8230;]</p>
<p>El cargo <a href="https://t21.us/a-consortium-led-by-recal-estructuras-will-build-a-section-of-the-saltillo-nuevo-laredo-train/">A consortium led by Recal Estructuras will build a section of the Saltillo–Nuevo Laredo train</a> apareció primero en <a href="https://t21.us">T21</a>.</p>
]]></description>
										<content:encoded><![CDATA[<p><img decoding="async" src="https://t21.com.mx/wp-content/uploads/2026/04/Sin-titulo-17.jpg" /></p>
<p><span dir="auto">The consortium led by </span><a href="https://recalglobal.com/"><span dir="auto">Recal Estructuras</span></a><span dir="auto"> won the bid for the construction and design of 9.204 kilometers (km) of the Saltillo–Nuevo Laredo passenger train, segment 15 “A2”, Monterrey Metropolitan Area.</span></p>
<p><span dir="auto">Together with Constructora Moyeda, </span><a href="https://construccionesurales.mx/"><span dir="auto">Construcciones Urales</span></a><span dir="auto"> , Azvi, and Gami Ingeniería e Instalaciones, they were awarded </span><strong><span dir="auto">a contract for 10 billion 438 million 249 thousand 060.02 pesos</span></strong><span dir="auto"> .</span></p>
<p><span dir="auto">According to the tender ruling, the consortia led by </span><strong><span dir="auto">Impulsora de Desarrollo Integral</span></strong><span dir="auto"> , as well as </span><strong><span dir="auto">Proveedora de Materiales del Norte</span></strong><span dir="auto"> , and Tordec were rejected for not meeting the required requirements.</span></p>
<p><span dir="auto">Meanwhile, along with Recal Estructuras, </span><a href="https://www.ica.com.mx/"><span dir="auto">ICA Constructora</span></a><span dir="auto"> and Constructora de Proyectos Viales de México complied with the requirements established by the </span><a href="https://www.gob.mx/attrapi/en"><span dir="auto">Agency for Trains and Integrated Public Transport (ATTRAPI)</span></a><span dir="auto"> .</span></p>
<p><span dir="auto">The agency specified that </span><strong><span dir="auto">the work will begin on May 1st</span></strong><span dir="auto"> and will have an execution period of 1,007 calendar days.</span></p>
<p><span dir="auto">The Saltillo–Nuevo Laredo train is expected to improve regional connectivity in the Bajío region. This 18.06 km rail line will connect the Monterrey Metropolitan Area, passing through urban and rural areas, as well as industrial sites.</span></p>
<p><span dir="auto">It is worth remembering that the overall </span><strong><span dir="auto"> Saltillo-Nuevo Laredo train project consists of the construction of a 396.3 kilometer (km) railway line </span></strong><span dir="auto"> that will have a double track section without electrification and will run at a maximum speed of 200 kilometers per hour (km/h).</span></p>
<figure id="attachment_673356" class="wp-caption aligncenter" aria-describedby="caption-attachment-673356"><img decoding="async" class="wp-image-673356 size-full" src="https://t21.com.mx/wp-content/uploads/2026/04/Captura-de-pantalla-2026-02-22-213315.png" sizes="(max-width: 950px) 100vw, 950px" srcset="https://t21.com.mx/wp-content/uploads/2026/04/Captura-de-pantalla-2026-02-22-213315.png 950w, https://t21.com.mx/wp-content/uploads/2026/04/Captura-de-pantalla-2026-02-22-213315-300x154.png 300w, https://t21.com.mx/wp-content/uploads/2026/04/Captura-de-pantalla-2026-02-22-213315-768x394.png 768w, https://t21.com.mx/wp-content/uploads/2026/04/Captura-de-pantalla-2026-02-22-213315-600x308.png 600w, https://t21.com.mx/wp-content/uploads/2026/04/Captura-de-pantalla-2026-02-22-213315-150x77.png 150w, https://t21.com.mx/wp-content/uploads/2026/04/Captura-de-pantalla-2026-02-22-213315-750x384.png 750w" alt="" width="950" height="487" data-pin-no-hover="true" /><figcaption id="caption-attachment-673356" class="wp-caption-text"><span dir="auto">Source: ATTRAPI.</span></figcaption></figure>
<p><span dir="auto">Comment and follow us on LinkedIn:  </span><a href="https://www.linkedin.com/in/evangelina-del-toro-31b8104b/"><span dir="auto">@Evangelina del Toro</span></a><span dir="auto">  /  </span><a id="menurj3" class="fui-Link ___1q1shib f2hkw1w f3rmtva f1ewtqcl fyind8e f1k6fduh f1w7gpdv fk6fouc fjoy568 figsok6 f1s184ao f1mk8lai fnbmjn9 f1o700av f13mvf36 f1cmlufx f9n3di6 f1ids18y f1tx3yz7 f1deo86v f1eh06m1 f1iescvh fhgqx19 f1olyrje f1p93eir f1nev41a f1h8hb77 f1lqvz6u f10aw75t fsle3fq f17ae5zn" title="https://www.linkedin.com/company/t21-grupo-comunicai-ny-medios/" href="https://www.linkedin.com/company/t21-grupo-comunicai-n-y-medios/" target="_blank" rel="noreferrer noopener" aria-label="Link @GrupoT21"><span dir="auto">@GrupoT21</span></a></p>
<p>El cargo <a href="https://t21.us/a-consortium-led-by-recal-estructuras-will-build-a-section-of-the-saltillo-nuevo-laredo-train/">A consortium led by Recal Estructuras will build a section of the Saltillo–Nuevo Laredo train</a> apareció primero en <a href="https://t21.us">T21</a>.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>Mexican government takes control of the Suburban Train; buys shares from CAF and Omnitren</title>
		<link>https://t21.us/mexican-government-takes-control-of-the-suburban-train-buys-shares-from-caf-and-omnitren/</link>
		
		<dc:creator><![CDATA[T21 Media]]></dc:creator>
		<pubDate>Thu, 23 Apr 2026 22:04:55 +0000</pubDate>
				<category><![CDATA[Railway]]></category>
		<category><![CDATA[Banobras]]></category>
		<category><![CDATA[CAF]]></category>
		<category><![CDATA[Fonadin]]></category>
		<category><![CDATA[OMITREN]]></category>
		<category><![CDATA[PASSENGER TRAINS]]></category>
		<category><![CDATA[RAILWAY PROJECTS]]></category>
		<category><![CDATA[SUBURBAN TRAIN]]></category>
		<guid isPermaLink="false">https://t21.us/?p=635347</guid>

					<description><![CDATA[<p>The Suburban Train that currently runs from Buenavista to Cuautitlán, and which will reach the Felipe Ángeles International Airport (AIFA) starting next Sunday , will be operated 100% by the Mexican government, after the purchase of shares from the concessionaire Construcciones y Auxiliar de Ferrocarriles (CAF) , of Spanish origin; and Omnitren, of Mexico, for five billion 999.23 million pesos [&#8230;]</p>
<p>El cargo <a href="https://t21.us/mexican-government-takes-control-of-the-suburban-train-buys-shares-from-caf-and-omnitren/">Mexican government takes control of the Suburban Train; buys shares from CAF and Omnitren</a> apareció primero en <a href="https://t21.us">T21</a>.</p>
]]></description>
										<content:encoded><![CDATA[<p><img decoding="async" src="https://t21.com.mx/wp-content/uploads/2026/04/Sin-titulo-16.jpg" /></p>
<p><a href="https://aifa.aero/"><span dir="auto">The Suburban Train that currently runs from Buenavista to Cuautitlán, and which will reach the Felipe Ángeles International Airport (AIFA)</span></a><span dir="auto"> starting next Sunday , will be operated 100% by the Mexican government, after the purchase of shares from the concessionaire </span><a href="https://www.cafmobility.com/mx/"><span dir="auto">Construcciones y Auxiliar de Ferrocarriles (CAF)</span></a><span dir="auto"> , of Spanish origin; and Omnitren, of Mexico, </span><strong><span dir="auto">for five billion 999.23 million pesos (mdp)</span></strong><span dir="auto"> .</span></p>
<p><span dir="auto">Jorge Mendoza Sánchez, general director of the </span><a href="https://www.gob.mx/banobras/es/"><span dir="auto">National Bank of Public Works and Services (Banobras)</span></a><span dir="auto"> , specified that </span><strong><span dir="auto">CAF had a shareholding of 43.4% and Omnitren of 7.6%</span></strong><span dir="auto"> of said transport system.</span></p>
<blockquote><p><span dir="auto">“With this, the Mexican State now has 100% of the shareholding in this train, that is, it passes from private hands to the hands of the people of Mexico,” he said during his participation in the morning conference this Thursday.</span></p></blockquote>
<p><span dir="auto">He stated that this train has become relevant for the current federal administration because it will connect the different passenger rail projects to the AIFA, as well as the AIFA-Pachuca and those in the north of the country that will pass through Querétaro.</span></p>
<p><span dir="auto">He explained that the amount derives from the concession granted to both companies, as well as the evaluation carried out through the </span><a href="https://www.gob.mx/indaabin/es/"><span dir="auto">Institute of Administration and Appraisals of National Assets (Indaabin)</span></a><span dir="auto"> , so the Suburban Train will also be a majority state-owned company.</span></p>
<figure id="attachment_673281" class="wp-caption aligncenter" aria-describedby="caption-attachment-673281"><img decoding="async" class="wp-image-673281 size-full" src="https://t21.com.mx/wp-content/uploads/2026/04/tren-1.png" sizes="(max-width: 1118px) 100vw, 1118px" srcset="https://t21.com.mx/wp-content/uploads/2026/04/tren-1.png 1118w, https://t21.com.mx/wp-content/uploads/2026/04/tren-1-300x169.png 300w, https://t21.com.mx/wp-content/uploads/2026/04/tren-1-1024x577.png 1024w, https://t21.com.mx/wp-content/uploads/2026/04/tren-1-768x433.png 768w, https://t21.com.mx/wp-content/uploads/2026/04/tren-1-600x338.png 600w, https://t21.com.mx/wp-content/uploads/2026/04/tren-1-150x85.png 150w, https://t21.com.mx/wp-content/uploads/2026/04/tren-1-750x423.png 750w" alt="" width="1118" height="630" data-pin-no-hover="true" /><figcaption id="caption-attachment-673281" class="wp-caption-text"><span dir="auto">Source: Banobras.</span></figcaption></figure>
<p><span dir="auto">Mendoza recalled that the Suburban Train began operations in 2008 and has seven stations running from Buenavista in Mexico City to Cuautitlán in the State of Mexico. Through the <a href="https://www.fonadin.gob.mx/fni2/"><span class="gs_tkn">National  </span></a><a href="https://www.fonadin.gob.mx/fni2/"><span class="gs_tkn">Infrastructure  </span></a></span><a href="https://www.fonadin.gob.mx/fni2/"><span class="gs_tkn"><span dir="auto">Fund  </span></span><span dir="auto"><span class="gs_tkn">(</span> Fonadin)</span></a><span dir="auto"> , which held 49% of the shares before the agreement, </span><strong><span dir="auto">resources totaling 11.201 billion pesos were allocated, along with financing from Banobras for 2.5 billion pesos (from 2005 to the present)</span></strong><span dir="auto"> .</span></p>
<blockquote><p><span dir="auto">“It was very important to reach an agreement with the companies so that the Mexican government could take control of the asset; we are going to ensure that this train is managed in the most efficient way,” Mendoza Sánchez said.</span></p></blockquote>
<figure id="attachment_673282" class="wp-caption aligncenter" aria-describedby="caption-attachment-673282"><img decoding="async" class="wp-image-673282 size-full" src="https://t21.com.mx/wp-content/uploads/2026/04/WhatsApp-Image-2026-04-23-at-08.23.03.jpeg" sizes="(max-width: 1023px) 100vw, 1023px" srcset="https://t21.com.mx/wp-content/uploads/2026/04/WhatsApp-Image-2026-04-23-at-08.23.03.jpeg 1023w, https://t21.com.mx/wp-content/uploads/2026/04/WhatsApp-Image-2026-04-23-at-08.23.03-300x239.jpeg 300w, https://t21.com.mx/wp-content/uploads/2026/04/WhatsApp-Image-2026-04-23-at-08.23.03-768x611.jpeg 768w, https://t21.com.mx/wp-content/uploads/2026/04/WhatsApp-Image-2026-04-23-at-08.23.03-600x477.jpeg 600w, https://t21.com.mx/wp-content/uploads/2026/04/WhatsApp-Image-2026-04-23-at-08.23.03-150x119.jpeg 150w, https://t21.com.mx/wp-content/uploads/2026/04/WhatsApp-Image-2026-04-23-at-08.23.03-750x597.jpeg 750w" alt="" width="1023" height="814" data-pin-no-hover="true" /><figcaption id="caption-attachment-673282" class="wp-caption-text"><span dir="auto">Jorge Mendoza Sánchez, general director of Banobras.</span></figcaption></figure>
<p><span dir="auto">He specified that </span><strong><span dir="auto">the train will be operated by Fonadin</span></strong><span dir="auto"> , which is also in charge of the El Insurgente train, which runs from Observatorio to Toluca. “We are creating a company that could take more control of these trains,” he noted.</span></p>
<p><span dir="auto">Similarly, he announced that </span><strong><span dir="auto">they will seek to make access to the system through the Integrated Mobility card</span></strong><span dir="auto"> , and that the fares will remain the same: short trip for 11.50 pesos and long trip for 26.50 pesos.</span></p>
<p><span dir="auto">Meanwhile, for the expansion to AIFA, </span><strong><span dir="auto">during its first month of operation it will have a promotional rate of 11.50 pesos and the full rate for 45 pesos</span></strong><span dir="auto"> , although it was estimated that it will be lower than other transports.</span></p>
<p><span dir="auto">Claudia Sheinbaum, president of Mexico, explained that to avoid problems in the operation of the new trains, the decision was made to purchase the Suburban Train, </span><strong><span dir="auto">which will be called &#8220;Felipe Ángeles</span></strong><span dir="auto"> ,&#8221; so that the network can be operated publicly.</span></p>
<p><span dir="auto">Comment and follow us on LinkedIn:  </span><a href="https://www.linkedin.com/in/evangelina-del-toro-31b8104b/"><span dir="auto">@Evangelina del Toro</span></a><span dir="auto">  /  </span><a href="https://www.linkedin.com/company/t21-grupo-comunicai-n-y-medios/"><span dir="auto">@GrupoT21</span></a></p>
<div class="jeg_ad jeg_ad_article jnews_content_inline_2_ads  ">
<div class="ads-wrapper align-center "></div>
</div>
<p>El cargo <a href="https://t21.us/mexican-government-takes-control-of-the-suburban-train-buys-shares-from-caf-and-omnitren/">Mexican government takes control of the Suburban Train; buys shares from CAF and Omnitren</a> apareció primero en <a href="https://t21.us">T21</a>.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>This consortium will build 4 stations on the Saltillo-Nuevo Laredo train line</title>
		<link>https://t21.us/this-consortium-will-build-4-stations-on-the-saltillo-nuevo-laredo-train-line/</link>
		
		<dc:creator><![CDATA[T21 Media]]></dc:creator>
		<pubDate>Tue, 21 Apr 2026 00:22:47 +0000</pubDate>
				<category><![CDATA[Railway]]></category>
		<category><![CDATA[ATTRAPI]]></category>
		<category><![CDATA[COMSA INFRASTRUCTURE]]></category>
		<category><![CDATA[PASSENGER TRAIN]]></category>
		<category><![CDATA[RAILWAY PROJECTS]]></category>
		<category><![CDATA[SALTILLO-NUEVO LAREDO TRAIN]]></category>
		<category><![CDATA[STATION CONSTRUCTION]]></category>
		<guid isPermaLink="false">https://t21.us/?p=635269</guid>

					<description><![CDATA[<p>The federal government awarded the consortium headed by Comsa Infraestructuras  a contract for 2,890,971,095.04 pesos for the construction and design of four stations of the  Saltillo-Nuevo Laredo passenger train . According to the tender award document, of the five proposals received by the Agency for Trains and Integrated Public Transport (ATTRAPI) , the winning bid was the only one that was solvent and [&#8230;]</p>
<p>El cargo <a href="https://t21.us/this-consortium-will-build-4-stations-on-the-saltillo-nuevo-laredo-train-line/">This consortium will build 4 stations on the Saltillo-Nuevo Laredo train line</a> apareció primero en <a href="https://t21.us">T21</a>.</p>
]]></description>
										<content:encoded><![CDATA[<p><img decoding="async" src="https://t21.com.mx/wp-content/uploads/2026/04/Sin-titulo-11.jpg" /></p>
<p><span dir="auto">The federal government awarded the consortium headed by </span><a href="https://www.comsa.com/"><span dir="auto">Comsa Infraestructuras</span></a><span dir="auto">  a contract for </span><strong><span dir="auto">2,890,971,095.04 pesos</span></strong><span dir="auto"> for the construction and design of four stations of the  </span><strong><span dir="auto">Saltillo-Nuevo Laredo passenger train</span></strong><span dir="auto"> .</span></p>
<p><span dir="auto">According to the tender award document, of the five proposals received by the </span><a href="https://www.gob.mx/attrapi"><span dir="auto">Agency for Trains and Integrated Public Transport (ATTRAPI)</span></a><span dir="auto"> , the winning bid was the only one that was solvent and met all the requested requirements.</span></p>
<p><span dir="auto">Comsa Infraestructura formed the consortium with Regiomontana de Construcción y Servicios, Comsa, and Vise. </span><strong><span dir="auto">Work will begin on April 27th</span></strong><span dir="auto"> , with a completion timeframe of 749 calendar days.</span></p>
<p><span dir="auto">The agency highlighted that the 2026 allocation for this project amounts to 1,116 million 688 thousand 100.40 pesos.</span></p>
<p><span dir="auto">The works encompass the construction and design of the  </span><strong><span dir="auto">Derramadero, Saltillo, Ramos Arizpe and García</span></strong><span dir="auto"> stations .</span></p>
<p><span dir="auto">Last February, ATTRAPI declared the bidding process for this project void, as it considered that none of the offers it received met all the requested technical and economic requirements.</span></p>
<p><strong><span dir="auto">The Saltillo-Nuevo Laredo train project involves the construction of a 396.3-kilometer (km) railway line,</span></strong><span dir="auto"> which will include a section of double track that is not electrified and will operate at a maximum speed of 200 kilometers per hour (km/h). It also includes the following stations and stops: Derramadero, Saltillo Centro, Ramos Arizpe, García, Las Torres, Salinas Victoria, Bustamante, Lampazos, Anáhuac, and Nuevo Laredo.</span></p>
<p><span dir="auto">It is worth remembering that </span><a href="https://recalglobal.com/"><span dir="auto">Recal Estructuras</span></a><span dir="auto"> , </span><a href="https://construccionesurales.mx/"><span dir="auto">Construcciones Urales</span></a><span dir="auto"> , Gami Ingeniería e Instalaciones, Azvi and Constructora Moyeda were the companies that won the construction and design of 8.854 km of this same project in segment 15 “A1”, Monterrey Metropolitan Area.</span></p>
<blockquote><p><span dir="auto">ATTRAPI also launched tenders for this project for the construction and design of the General Escobedo, Salinas Victoria, Villaldama, Lampazos de Naranjo, Anáhuac and Nuevo Laredo stations; the deadline for submitting proposals is May 12.</span></p></blockquote>
<p><span dir="auto">Also, on April 29th, the decision will be made for the tender for the construction and design of the Zica Derramadero railway auxiliary buildings, García Workshops and Garages, Las Torres inspection zone, Salinas Victoria maintenance base and Zica Nuevo Laredo.</span></p>
<p><span dir="auto">Meanwhile, the next April 24th will be for the construction and design of the railway systems, and the 21st of the same month for the construction and design of 9,204 km, segment 15 “A2”, Monterrey Metropolitan Area.</span></p>
<p><span dir="auto">Comment and follow us on LinkedIn:  </span><a href="https://www.linkedin.com/in/evangelina-del-toro-31b8104b/"><span dir="auto">@Evangelina del Toro</span></a><span dir="auto">  /  </span><a href="https://www.linkedin.com/company/t21-grupo-comunicai-n-y-medios/"><span dir="auto">@GrupoT21</span></a></p>
<div class="jeg_ad jeg_ad_article jnews_content_inline_2_ads  ">
<div class="ads-wrapper align-center "></div>
</div>
<p>El cargo <a href="https://t21.us/this-consortium-will-build-4-stations-on-the-saltillo-nuevo-laredo-train-line/">This consortium will build 4 stations on the Saltillo-Nuevo Laredo train line</a> apareció primero en <a href="https://t21.us">T21</a>.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>ATTRAPI receives proposals for section of the Saltillo–Nuevo Laredo train</title>
		<link>https://t21.us/attrapi-receives-proposals-for-section-of-the-saltillo-nuevo-laredo-train/</link>
		
		<dc:creator><![CDATA[T21 Media]]></dc:creator>
		<pubDate>Wed, 08 Apr 2026 22:21:04 +0000</pubDate>
				<category><![CDATA[Railway]]></category>
		<category><![CDATA[ATTRAPI]]></category>
		<category><![CDATA[PASSENGER TRAIN]]></category>
		<category><![CDATA[RAILWAY PROJECTS]]></category>
		<category><![CDATA[SALTILLO-NUEVO LAREDO TRIAN]]></category>
		<category><![CDATA[TENDER]]></category>
		<guid isPermaLink="false">https://t21.us/?p=635027</guid>

					<description><![CDATA[<p>The Agency for Trains and Integrated Public Transportation (ATTRAPI)  received six bids as part of the construction and design of 9.204 kilometers (km) of the Saltillo–Nuevo Laredo passenger train, segment 15 “A2”, Monterrey Metropolitan Area. According to the document, the consortium made up of Impulsora de Desarrollo Integral , Jaguar Ingenieros Constructores , Cargo Energía, Ingeniería y Construcción, Proacon México, China [&#8230;]</p>
<p>El cargo <a href="https://t21.us/attrapi-receives-proposals-for-section-of-the-saltillo-nuevo-laredo-train/">ATTRAPI receives proposals for section of the Saltillo–Nuevo Laredo train</a> apareció primero en <a href="https://t21.us">T21</a>.</p>
]]></description>
										<content:encoded><![CDATA[<p><img decoding="async" src="https://t21.com.mx/wp-content/uploads/2026/04/Sin-titulo1.jpg" /></p>
<p><span dir="auto">The </span><a href="https://www.gob.mx/attrapi"><span dir="auto">Agency for Trains and Integrated Public Transportation (ATTRAPI)</span></a><span dir="auto">  received six bids as part of the construction and design of 9.204 kilometers (km) of the Saltillo–Nuevo Laredo passenger train, segment 15 “A2”, Monterrey Metropolitan Area.</span></p>
<p><span dir="auto">According to the document, the consortium made up of </span><a href="https://grupoidinsa.com/"><span dir="auto">Impulsora de Desarrollo Integral</span></a><span dir="auto"> , </span><a href="https://jaguaringenieros.mx/"><span dir="auto">Jaguar Ingenieros Constructores</span></a><span dir="auto"> , Cargo Energía, Ingeniería y Construcción, Proacon México, China Civil Engineering Construction Corporation and </span><a href="http://aldesa.com.mx/"><span dir="auto">Construcciones Aldesem</span></a><span dir="auto"> , submitted the lowest offer with </span><strong><span dir="auto">nine billion 278 million 429 thousand 324.98 pesos</span></strong><span dir="auto"> .</span></p>
<p><span dir="auto">The consortium made up of </span><a href="https://tordec.com/"><span dir="auto">Tordec</span></a><span dir="auto"> , Proyectos y Desarrollos Salve, ZITUM Desarrolladores, and Proyectos y Estudios Ferroviarios, offered </span><strong><span dir="auto">the highest bid at 11 billion 89 million 475 thousand 533.02 pesos</span></strong><span dir="auto"> .</span></p>
<p><span dir="auto">Constructora de Proyectos Viales de México, </span><a href="https://www.grupocaabsa.com/"><span dir="auto">Caabsa Constructora</span></a><span dir="auto"> and Obrascon Huarte Lain (OHL) proposed 11 billion 13 million 703 thousand 496.79 pesos.</span></p>
<p><span dir="auto">The consortium made up of </span><a href="https://ica.com.mx/"><span dir="auto">ICA Constructora</span></a><span dir="auto"> , Desarrolladora de Infraestructura Puerto Escondido; Controladora de Operaciones de Infraestructura, </span><strong><span dir="auto">Compañía Hidroeléctrica La Yesca</span></strong><span dir="auto"> , ICA Edificio Satélite, Constructora El Cajón, Entia de México, Desarrollo y Construcciones Urbanas, Constructora Garza Ponce, Construcciones y Trituraciones and ICA Constructora de Infraestructura, submitted a proposal of 10 billion 700 million 291 thousand 890.35 pesos.</span></p>
<p><span dir="auto">Meanwhile, Proveedora de Materiales del Norte, </span><a href="https://www.rubau.com/project/mexico/"><span dir="auto">Rubau México</span></a><span dir="auto"> , González Soto y Asociados, ASCH, Construcciones y Maquinaria SEF, ASCH Infraestructuras y Servicios and ASCH Infraestructuras y Servicios, Agencia en Chile, submitted a bid of nine billion 917 million 991 thousand 547.57 pesos.</span></p>
<p><span dir="auto">Finally, </span><a href="https://recalglobal.com/"><span dir="auto">Recal Estructuras</span></a><span dir="auto"> , Constructora Moyeda, Construcciones Urales, AZVI, and Gami Ingeniería e Instalaciones, proposed 10 billion 438 million 249 thousand 060.02 pesos.</span></p>
<p><span dir="auto">ATTRAPI detailed that </span><strong><span dir="auto"> the project includes the construction of a double railway track</span></strong><span dir="auto"> , the elevated stations of González Garza and Monterrey Centro, as well as the studies necessary for the correct preparation and authorization of the executive project, among other works.</span></p>
<p><span dir="auto">The agency has set </span><strong><span dir="auto"> May 1st as the start date for the work</span></strong><span dir="auto"> , with a completion timeframe of 1,007 calendar days. It specified that </span><strong><span dir="auto"> it has allocated 1,701,168,857.41 pesos</span></strong><span dir="auto">  for this project this year.</span></p>
<p><span dir="auto">The agency will announce the winner of this contest on April 17th.</span></p>
<p><span dir="auto">Comment and follow us on LinkedIn:  </span><a href="https://www.linkedin.com/in/evangelina-del-toro-31b8104b/"><span dir="auto">@Evangelina del Toro</span></a><span dir="auto">  /  </span><a href="https://www.linkedin.com/company/t21-grupo-comunicai-n-y-medios/"><span dir="auto">@GrupoT21</span></a></p>
<p>El cargo <a href="https://t21.us/attrapi-receives-proposals-for-section-of-the-saltillo-nuevo-laredo-train/">ATTRAPI receives proposals for section of the Saltillo–Nuevo Laredo train</a> apareció primero en <a href="https://t21.us">T21</a>.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>ATTRAPI launches competition to build 6 stations for the Saltillo–Nuevo Laredo train</title>
		<link>https://t21.us/attrapi-launches-competition-to-build-6-stations-for-the-saltillo-nuevo-laredo-train/</link>
		
		<dc:creator><![CDATA[T21 Media]]></dc:creator>
		<pubDate>Tue, 07 Apr 2026 01:45:43 +0000</pubDate>
				<category><![CDATA[Railway]]></category>
		<category><![CDATA[ATTRAPI]]></category>
		<category><![CDATA[INAH]]></category>
		<category><![CDATA[PASSENGER TRAIN]]></category>
		<category><![CDATA[RAILWAY PROJECTS]]></category>
		<category><![CDATA[RAILWAY STATIONS]]></category>
		<category><![CDATA[SALTILLO-NUEVO LAREDO TRAIN]]></category>
		<guid isPermaLink="false">https://t21.us/?p=634973</guid>

					<description><![CDATA[<p>The  Agency for Trains and Integrated Public Transportation (ATTRAPI) launched the call for bids for the construction and design of six railway stations for the Saltillo–Nuevo Laredo passenger train. According to the document, these are the stations General Escobedo, Salinas Victoria, Villaldama, Lampazos de Naranjo, Anáhuac and Nuevo Laredo . “The work will be carried out under a continuous management scheme [&#8230;]</p>
<p>El cargo <a href="https://t21.us/attrapi-launches-competition-to-build-6-stations-for-the-saltillo-nuevo-laredo-train/">ATTRAPI launches competition to build 6 stations for the Saltillo–Nuevo Laredo train</a> apareció primero en <a href="https://t21.us">T21</a>.</p>
]]></description>
										<content:encoded><![CDATA[<p><img decoding="async" src="https://t21.com.mx/wp-content/uploads/2026/04/Sin-titulo-1.jpg" /></p>
<p><span dir="auto">The  </span><a href="https://www.gob.mx/attrapi"><span dir="auto">Agency for Trains and Integrated Public Transportation (ATTRAPI)</span></a><span dir="auto"> launched the call for bids for the </span><strong><span dir="auto">construction and design of six railway stations</span></strong><span dir="auto"> for the Saltillo–Nuevo Laredo passenger train.</span></p>
<p><span dir="auto">According to the document, these are the stations </span><strong><span dir="auto">General Escobedo, Salinas Victoria, Villaldama, Lampazos de Naranjo, Anáhuac and Nuevo Laredo</span></strong><span dir="auto"> .</span></p>
<blockquote><p><span dir="auto">“The work will be carried out under a continuous management scheme ( </span><em><span dir="auto">fast track</span></em><span dir="auto"> ), starting construction in stages as portions of the executive project are completed, without waiting to have the project completed in its entirety, which implies that work can begin as long as the construction elements of the work to be carried out do have the corresponding executive project,” the agency specified.</span></p></blockquote>
<p><span dir="auto">ATTRAPI highlighted that </span><strong><span dir="auto">Salinas Victoria, Villaldama and Lampazos de Naranjo are old stations with historical value</span></strong><span dir="auto">  cataloged by the </span><a href="https://www.inah.gob.mx/"><span dir="auto">National Institute of Anthropology and History (INAH)</span></a><span dir="auto"> , so the winner must consider the materials, specialized personnel, tools, equipment, temporary installations and other elements required for their correct execution, in accordance with the guidelines and authorizations issued by this institute.</span></p>
<blockquote><p><span dir="auto">“The winning bidder will be responsible for coordinating with the competent authorities for the initiation, management, monitoring and conclusion of all necessary procedures, the preparation of studies, reports, executive project and the execution of rescue and salvage actions, as well as for carrying out the corresponding works, within the deadlines established by the agency,” he explained.</span></p></blockquote>
<p><span dir="auto">The agency specified that the presentation and opening of proposals for this project </span><strong><span dir="auto">will be on April 21, and that day the date on which the decision will be made will be announced</span></strong><span dir="auto"> .</span></p>
<p><span dir="auto">Similarly, he indicated that the start date for the work will be </span><strong><span dir="auto">May 21, 2026, with a deadline for the execution of the work of 558 calendar days</span></strong><span dir="auto"> .</span></p>
<p><span dir="auto">Comment and follow us on LinkedIn:  </span><a href="https://www.linkedin.com/in/evangelina-del-toro-31b8104b/"><span dir="auto">@Evangelina del Toro</span></a><span dir="auto">  /  </span><a href="https://www.linkedin.com/company/t21-grupo-comunicai-n-y-medios/"><span dir="auto">@GrupoT21</span></a></p>
<p>El cargo <a href="https://t21.us/attrapi-launches-competition-to-build-6-stations-for-the-saltillo-nuevo-laredo-train/">ATTRAPI launches competition to build 6 stations for the Saltillo–Nuevo Laredo train</a> apareció primero en <a href="https://t21.us">T21</a>.</p>
]]></content:encoded>
					
		
		
			</item>
	</channel>
</rss>
