<?xml version="1.0" encoding="UTF-8"?><rss version="2.0"
	xmlns:content="http://purl.org/rss/1.0/modules/content/"
	xmlns:wfw="http://wellformedweb.org/CommentAPI/"
	xmlns:dc="http://purl.org/dc/elements/1.1/"
	xmlns:atom="http://www.w3.org/2005/Atom"
	xmlns:sy="http://purl.org/rss/1.0/modules/syndication/"
	xmlns:slash="http://purl.org/rss/1.0/modules/slash/"
	>

<channel>
	<title>QUERETARO-SALTILLO archivos - T21</title>
	<atom:link href="https://t21.us/tag/queretaro-saltillo/feed/" rel="self" type="application/rss+xml" />
	<link>https://t21.us/tag/queretaro-saltillo/</link>
	<description>The leading provider of news in the Transportation and Logistics Sector, including Air, Maritime, Land, and Railway, in Mexico and Latin America.</description>
	<lastBuildDate>Mon, 24 Aug 2026 23:07:55 +0000</lastBuildDate>
	<language>en-US</language>
	<sy:updatePeriod>
	hourly	</sy:updatePeriod>
	<sy:updateFrequency>
	1	</sy:updateFrequency>
	<generator>https://wordpress.org/?v=7.0.4</generator>

<image>
	<url>https://t21.us/wp-content/uploads/2024/04/cropped-t21-favicon-200-32x32-1.png</url>
	<title>QUERETARO-SALTILLO archivos - T21</title>
	<link>https://t21.us/tag/queretaro-saltillo/</link>
	<width>32</width>
	<height>32</height>
</image> 
	<item>
		<title>These companies show interest in section I of the Querétaro-Saltillo train</title>
		<link>https://t21.us/these-companies-show-interest-in-section-i-of-the-queretaro-saltillo-train/</link>
		
		<dc:creator><![CDATA[T21 Media]]></dc:creator>
		<pubDate>Mon, 24 Aug 2026 23:06:40 +0000</pubDate>
				<category><![CDATA[Railway]]></category>
		<category><![CDATA[ATTRAPI]]></category>
		<category><![CDATA[COMSA INFRASTRUCTURE]]></category>
		<category><![CDATA[MOTA-ENGIL MEXICO]]></category>
		<category><![CDATA[PASSENGER TRAIN]]></category>
		<category><![CDATA[QUERETARO-SALTILLO]]></category>
		<guid isPermaLink="false">https://t21.us/?p=637918</guid>

					<description><![CDATA[<p>The Agency for Trains and Integrated Public Transportation (ATTRAPI) reported that 10 companies have shown interest in the construction and design of 68 kilometers (km) of section I of the Querétaro-Saltillo passenger train, Querétaro-San Luis Potosí section, Querétaro-San Miguel de Allende subsection, chainage from km 0+000 to km 68+000. He also specified that the tender includes the [&#8230;]</p>
<p>El cargo <a href="https://t21.us/these-companies-show-interest-in-section-i-of-the-queretaro-saltillo-train/">These companies show interest in section I of the Querétaro-Saltillo train</a> apareció primero en <a href="https://t21.us">T21</a>.</p>
]]></description>
										<content:encoded><![CDATA[<p><img decoding="async" src="https://t21.com.mx/wp-content/uploads/2026/08/TREN-2.jpeg" /></p>
<p><span dir="auto">The </span><a href="https://www.gob.mx/attrapi/es"><span dir="auto">Agency for Trains and Integrated Public Transportation (ATTRAPI)</span></a><span dir="auto"> reported that 10 companies have shown interest in the construction and design of 68 kilometers (km) of section I of the Querétaro-Saltillo passenger train, Querétaro-San Luis Potosí section, Querétaro-San Miguel de Allende subsection, chainage from km 0+000 to km 68+000.</span></p>
<p><span dir="auto">He also specified that the tender includes the construction of viaducts, stations, tunnels, bridges, railway underpasses, railway overpasses, and pedestrian bridges.</span></p>
<p><span dir="auto">According to the documents, the representatives of </span><a href="https://www.grupo-gsa.com/"><span dir="auto">González Soto y Asociados</span></a><span dir="auto"> , </span><a href="https://www.comsa.com/"><span dir="auto">Comsa Infraestructura</span></a><span dir="auto"> , </span><a href="https://www.mota-engil.com/es/"><span dir="auto">Mota-Engil México</span></a><span dir="auto"> , </span><strong><span dir="auto">Omega Construcciones Industriales</span></strong><span dir="auto"> , </span><a href="https://grupoidinsa.com/"><span dir="auto">Impulsora de Desarrollo Integral</span></a><span dir="auto"> , </span><a href="https://www.ica.com.mx/"><span dir="auto">ICA Constructora</span></a><span dir="auto"> , </span><a href="https://daniferrotools.com/"><span dir="auto">DANIFERROTOOLS</span></a><span dir="auto"> , </span><strong><span dir="auto">Constructora Gallo Meda</span></strong><span dir="auto"> , </span><strong><span dir="auto">Calzada Construcciones</span></strong><span dir="auto"> and </span><a href="https://www.crecg.com/crecien/index/"><span dir="auto">China Railway International Group Co.</span></a><span dir="auto"> were present at the first clarification meeting .</span></p>
<p><span dir="auto">According to ATTRAPI, the tender includes the construction of a railway line, which </span><strong><span dir="auto">includes the necessary studies for the preparation and authorization of the executive project</span></strong><span dir="auto"> , and subsequently the development of the construction work will be carried out.</span></p>
<blockquote><p><span dir="auto">“The project is designed to operate at speeds of up to 177 kilometers per hour (km/h). Furthermore, its route has been carefully planned to minimize environmental and social impacts, making extensive use of existing rights-of-way and complying with the urban development regulations of each municipality,” he explained.</span></p></blockquote>
<p><strong><span dir="auto">The rail connection between Querétaro and San Luis Potosí will promote the attraction of investments</span></strong><span dir="auto"> in the commercial, industrial and social sectors, in addition to contributing to the reduction of travel times and the mitigation of polluting emissions.</span></p>
<p><span dir="auto">The agency specified that the estimated </span><strong><span dir="auto">start date for the work will be September 24th</span></strong><span dir="auto"> , with an execution period of 851 calendar days.</span></p>
<p><span dir="auto">It is worth remembering that ATTRAPI also launched the call for bids for the construction and design of 82 km of section II of the Querétaro-Saltillo train, Querétaro-San Luis Potosí section, San Miguel de Allende-Villa de Reyes subsection, chainage from km 68+000 to km 150+000.</span></p>
<p><span dir="auto">Comment and follow us on LinkedIn:  </span><a id="menurjdo" class="fui-Link ___1q1shib f2hkw1w f3rmtva f1ewtqcl fyind8e f1k6fduh f1w7gpdv fk6fouc fjoy568 figsok6 f1s184ao f1mk8lai fnbmjn9 f1o700av f13mvf36 f1cmlufx f9n3di6 f1ids18y f1tx3yz7 f1deo86v f1eh06m1 f1iescvh fhgqx19 f1olyrje f1p93eir f1nev41a f1h8hb77 f1lqvz6u f10aw75t fsle3fq f17ae5zn" title="https://www.linkedin.com/in/evangelina-del-toro-31b8104b/" href="https://www.linkedin.com/in/evangelina-del-toro-31b8104b/" target="_blank" rel="noreferrer noopener" aria-label="Link @Evangelina del Toro"><span dir="auto">@Evangelina del Toro</span></a><span dir="auto">  /  </span><a id="menurjdq" class="fui-Link ___1q1shib f2hkw1w f3rmtva f1ewtqcl fyind8e f1k6fduh f1w7gpdv fk6fouc fjoy568 figsok6 f1s184ao f1mk8lai fnbmjn9 f1o700av f13mvf36 f1cmlufx f9n3di6 f1ids18y f1tx3yz7 f1deo86v f1eh06m1 f1iescvh fhgqx19 f1olyrje f1p93eir f1nev41a f1h8hb77 f1lqvz6u f10aw75t fsle3fq f17ae5zn" title="https://www.linkedin.com/company/t21-grupo-comunicai-ny-medios/" href="https://www.linkedin.com/company/t21-grupo-comunicai-n-y-medios/" target="_blank" rel="noreferrer noopener" aria-label="Link @GrupoT21"><span dir="auto">@GrupoT21</span></a></p>
<p>El cargo <a href="https://t21.us/these-companies-show-interest-in-section-i-of-the-queretaro-saltillo-train/">These companies show interest in section I of the Querétaro-Saltillo train</a> apareció primero en <a href="https://t21.us">T21</a>.</p>
]]></content:encoded>
					
		
		
			</item>
	</channel>
</rss>
