<?xml version="1.0" encoding="UTF-8"?><rss version="2.0"
	xmlns:content="http://purl.org/rss/1.0/modules/content/"
	xmlns:wfw="http://wellformedweb.org/CommentAPI/"
	xmlns:dc="http://purl.org/dc/elements/1.1/"
	xmlns:atom="http://www.w3.org/2005/Atom"
	xmlns:sy="http://purl.org/rss/1.0/modules/syndication/"
	xmlns:slash="http://purl.org/rss/1.0/modules/slash/"
	>

<channel>
	<title>PRIORITY PROJECTS archivos - T21</title>
	<atom:link href="https://t21.us/tag/priority-projects/feed/" rel="self" type="application/rss+xml" />
	<link>https://t21.us/tag/priority-projects/</link>
	<description>The leading provider of news in the Transportation and Logistics Sector, including Air, Maritime, Land, and Railway, in Mexico and Latin America.</description>
	<lastBuildDate>Tue, 09 Sep 2025 19:04:56 +0000</lastBuildDate>
	<language>en-US</language>
	<sy:updatePeriod>
	hourly	</sy:updatePeriod>
	<sy:updateFrequency>
	1	</sy:updateFrequency>
	<generator>https://wordpress.org/?v=7.0</generator>

<image>
	<url>https://t21.us/wp-content/uploads/2024/04/cropped-t21-favicon-200-32x32-1.png</url>
	<title>PRIORITY PROJECTS archivos - T21</title>
	<link>https://t21.us/tag/priority-projects/</link>
	<width>32</width>
	<height>32</height>
</image> 
	<item>
		<title>Economic Package 2026: How much will the budget for railway projects be?</title>
		<link>https://t21.us/economic-package-2026-how-much-will-the-budget-for-railway-projects-be/</link>
		
		<dc:creator><![CDATA[T21 Media]]></dc:creator>
		<pubDate>Tue, 09 Sep 2025 19:04:56 +0000</pubDate>
				<category><![CDATA[FEATURED]]></category>
		<category><![CDATA[Railway]]></category>
		<category><![CDATA[ECONOMIC PACKAGE 2026]]></category>
		<category><![CDATA[investments]]></category>
		<category><![CDATA[MAYA TRAIN]]></category>
		<category><![CDATA[PRIORITY PROJECTS]]></category>
		<category><![CDATA[RAILWAY WORKS]]></category>
		<guid isPermaLink="false">https://t21.us/?p=630354</guid>

					<description><![CDATA[<p>According to the 2026 Federal Expenditure Budget Project (PPEF), 104.576 billion pesos (mdp) would be allocated for new trains in Mexico, if the Economic Package for next year is approved. According to the document, the Mexico-Querétaro train would have an investment of 10.492 billion pesos, while the AIFA-Pachuca train would have an investment of 3.108 billion pesos. [&#8230;]</p>
<p>El cargo <a href="https://t21.us/economic-package-2026-how-much-will-the-budget-for-railway-projects-be/">Economic Package 2026: How much will the budget for railway projects be?</a> apareció primero en <a href="https://t21.us">T21</a>.</p>
]]></description>
										<content:encoded><![CDATA[<p><img decoding="async" src="https://t21.com.mx/wp-content/uploads/2025/09/WhatsApp-Image-2025-09-09-at-08.30.08-1.jpeg" /></p>
<p><span dir="auto">According to the 2026 Federal Expenditure Budget Project (PPEF), </span><strong><span dir="auto">104.576 billion pesos (mdp)</span></strong><span dir="auto"> would be allocated for new trains in Mexico, if the Economic Package for next year is approved.</span></p>
<p><span dir="auto">According to the document, the Mexico-Querétaro train would have an investment of 10.492 billion pesos, while the AIFA-Pachuca train would have an investment of 3.108 billion pesos.</span></p>
<blockquote><p><span dir="auto">The passenger train connecting the AIFA with Pachuca is 57.1 kilometers (km) long, with two passenger train tracks and three stations. The project will largely utilize the existing right-of-way of the H, HA, and HC tracks of the Mexican Railway System, and will use new right-of-way at certain points</span><br />
<span dir="auto">required to achieve an optimized layout.</span></p></blockquote>
<p><span dir="auto">The text indicated that a disbursement of 14.386 billion pesos would be made for the Saltillo-Nuevo Laredo train.</span></p>
<div class="jeg_ad jeg_ad_article jnews_content_inline_3_ads  ">
<div class="ads-wrapper align-center "></div>
</div>
<blockquote><p><span dir="auto">The project will have a length of 363.1 km, and the train is expected to have five stops: two terminals, located at the ends of the route in Saltillo and Nuevo Laredo, and three intermediate stations located in Santa Catarina, Monterrey Centro, and Monterrey Norte.</span></p></blockquote>
<p><span dir="auto">While for Querétaro-Irapuato it would be nine thousand 344 million pesos.</span></p>
<blockquote><p><span dir="auto">The project will be 107.5 km long, and the train is expected to have five stops: two terminals, located at the ends of the route in Querétaro and Irapuato, and three intermediate stations</span><br />
<span dir="auto">located in the municipalities of Celaya, Villagrán, and Salamanca.</span></p></blockquote>
<p><span dir="auto">These projects are classified as </span><strong><span dir="auto">priority investment projects</span></strong><span dir="auto"> , making them among the flagship projects of the current administration, led by Mexican President Claudia Sheinbaum.</span></p>
<p><img fetchpriority="high" decoding="async" class="alignnone wp-image-655731 size-full" src="https://t21.com.mx/wp-content/uploads/2025/09/NT.jpg" sizes="(max-width: 751px) 100vw, 751px" srcset="https://t21.com.mx/wp-content/uploads/2025/09/NT.jpg 751w, https://t21.com.mx/wp-content/uploads/2025/09/NT-300x236.jpg 300w, https://t21.com.mx/wp-content/uploads/2025/09/NT-600x473.jpg 600w, https://t21.com.mx/wp-content/uploads/2025/09/NT-150x118.jpg 150w" alt="" width="751" height="592" data-pin-no-hover="true" /><span dir="auto">According to the document, investments in </span><strong><span dir="auto">rolling stock</span></strong><span dir="auto"> would amount to 14.879 billion pesos; for </span><strong><span dir="auto">right-of-way,</span></strong><span dir="auto"> 21.432 billion pesos.</span></p>
<p><span dir="auto">Other railway projects include the Querétaro-San Luis Potosí train, which would have a budget of 9.076 billion pesos; the Irapuato-Guadalajara train, with 12.506 billion pesos; and the San Luis Potosí-Saltillo train, with 9.353 billion pesos.</span></p>
<p><span dir="auto">For the </span><strong><span dir="auto">Maya Train (trains, maintenance, and the Campeche train)</span></strong><span dir="auto"> , the federal government has proposed a budget of 30 billion pesos, making it the largest expenditure for railway projects in Mexico.</span></p>
<p><span dir="auto">Other railway construction projects contemplated in the 2026 Economic Package include the </span><a href="https://aifa.aero/"><span dir="auto">Felipe Ángeles International Airport</span></a><span dir="auto"> Interconnection (Lechería train) with 600 million pesos. Additionally, the Mexico-Toluca train with 7.408 billion pesos.</span></p>
<p><span dir="auto">Comment and follow us on X:  </span><a href="https://twitter.com/GrupoT21"><span dir="auto">@GrupoT21</span></a></p>
<p>El cargo <a href="https://t21.us/economic-package-2026-how-much-will-the-budget-for-railway-projects-be/">Economic Package 2026: How much will the budget for railway projects be?</a> apareció primero en <a href="https://t21.us">T21</a>.</p>
]]></content:encoded>
					
		
		
			</item>
	</channel>
</rss>
