<?xml version="1.0" encoding="UTF-8"?><rss version="2.0"
	xmlns:content="http://purl.org/rss/1.0/modules/content/"
	xmlns:wfw="http://wellformedweb.org/CommentAPI/"
	xmlns:dc="http://purl.org/dc/elements/1.1/"
	xmlns:atom="http://www.w3.org/2005/Atom"
	xmlns:sy="http://purl.org/rss/1.0/modules/syndication/"
	xmlns:slash="http://purl.org/rss/1.0/modules/slash/"
	>

<channel>
	<title>ORGANIZATIONAL DIMENSION archivos - T21</title>
	<atom:link href="https://t21.us/tag/organizational-dimension/feed/" rel="self" type="application/rss+xml" />
	<link>https://t21.us/tag/organizational-dimension/</link>
	<description>The leading provider of news in the Transportation and Logistics Sector, including Air, Maritime, Land, and Railway, in Mexico and Latin America.</description>
	<lastBuildDate>Fri, 14 Aug 2026 22:01:19 +0000</lastBuildDate>
	<language>en-US</language>
	<sy:updatePeriod>
	hourly	</sy:updatePeriod>
	<sy:updateFrequency>
	1	</sy:updateFrequency>
	<generator>https://wordpress.org/?v=7.0.4</generator>

<image>
	<url>https://t21.us/wp-content/uploads/2024/04/cropped-t21-favicon-200-32x32-1.png</url>
	<title>ORGANIZATIONAL DIMENSION archivos - T21</title>
	<link>https://t21.us/tag/organizational-dimension/</link>
	<width>32</width>
	<height>32</height>
</image> 
	<item>
		<title>Logistics faces the challenge of knowing when an investment no longer makes sense.</title>
		<link>https://t21.us/logistics-faces-the-challenge-of-knowing-when-an-investment-no-longer-makes-sense/</link>
		
		<dc:creator><![CDATA[T21 Media]]></dc:creator>
		<pubDate>Fri, 14 Aug 2026 22:01:19 +0000</pubDate>
				<category><![CDATA[Logistics]]></category>
		<category><![CDATA[AMERICO PINTO]]></category>
		<category><![CDATA[artificial intelligence]]></category>
		<category><![CDATA[ORGANIZATIONAL DIMENSION]]></category>
		<category><![CDATA[PMI LATAM CONFERENCE 2026]]></category>
		<category><![CDATA[PROJECT MANAGMENT INSITUTE]]></category>
		<category><![CDATA[TRANSPORT]]></category>
		<guid isPermaLink="false">https://t21.us/?p=637726</guid>

					<description><![CDATA[<p>LIMA, PERU – The transportation and logistics industry is accustomed to measuring virtually everything: times, costs, productivity, equipment availability, service levels, and operational performance. However, this culture of metrics doesn&#8217;t always reach the same depth in projects that will determine companies&#8217; future capacity, even when they involve investments of millions of dollars. This gap becomes [&#8230;]</p>
<p>El cargo <a href="https://t21.us/logistics-faces-the-challenge-of-knowing-when-an-investment-no-longer-makes-sense/">Logistics faces the challenge of knowing when an investment no longer makes sense.</a> apareció primero en <a href="https://t21.us">T21</a>.</p>
]]></description>
										<content:encoded><![CDATA[<p><img decoding="async" src="https://t21.com.mx/wp-content/uploads/2026/08/Americo-Pinto-PMI-edr.jpg" /></p>
<p><span dir="auto">LIMA, PERU – The transportation and logistics industry is accustomed to measuring virtually everything: times, costs, productivity, equipment availability, service levels, and operational performance. However, this culture of metrics doesn&#8217;t always reach the same depth in projects that will determine companies&#8217; future capacity, even when they involve investments of millions of dollars.</span></p>
<p><span dir="auto">This gap becomes relevant as transport companies </span><strong><span dir="auto">, logistics operators and infrastructure developers</span></strong><span dir="auto"> allocate capital to new roads, railways, terminals, distribution centers, automation and technological transformation, projects that can take years to become operational and whose economic environment can change before they begin to generate results.</span></p>
<p><span dir="auto">Américo Pinto, Managing Director of PMO Global Alliance at </span><a href="https://www.pmi.org/"><span dir="auto">Project Management Institute (PMI)</span></a><span dir="auto"> , warns against </span><strong><span dir="auto">transferring to projects the rigor with which these industries traditionally manage their operations</span></strong><span dir="auto"> .</span></p>
<blockquote><p><span dir="auto">“Even though there is a tradition, an awareness of the importance of indicators for operations, it is very common that for projects this does not happen in the same way,” he noted in an interview with T21 during the </span><a href="https://pmi.org.pe/calendar?eventId=46775"><span dir="auto">PMI LATAM Conference 2026</span></a><span dir="auto"> , held in Lima, Peru.</span></p></blockquote>
<p><strong><span dir="auto">This point is particularly sensitive for transportation and logistics</span></strong><span dir="auto"> . A company may have extensive experience managing its daily operations, but that doesn&#8217;t necessarily mean it has the same capabilities to execute complex investments.</span></p>
<blockquote><p><span dir="auto">“The business is based on operations, on processes, not on projects, but projects are very important because they are very high investments. So, your work is not yet project-based, but projects are essential for success,” Pinto explained.</span></p></blockquote>
<p><span dir="auto">The difference also forces us to separate two concepts that frequently end up getting mixed up: </span><strong><span dir="auto">delivering a project and obtaining the expected results from that investment</span></strong><span dir="auto"> .</span></p>
<p><span dir="auto">A highway can become operational, a terminal can be inaugurated, or a technology platform can be implemented as planned. That&#8217;s the delivery. The real result appears later, when it can be determined whether that infrastructure increased capacity, reduced costs, raised productivity, or produced the benefits that originally justified the expenditure.</span></p>
<p><span dir="auto">Therefore, Pinto believes that the results and the way to measure them should be established from the construction of the </span><em><span dir="auto">business case</span></em><span dir="auto"> , even when they can only be verified months after the project is completed.</span></p>
<p><strong><span dir="auto">The challenge is even greater in Latin America, where large infrastructure projects often face delays</span></strong><span dir="auto"> , scope changes, and cost overruns. From the expert&#8217;s perspective, three elements are particularly relevant for addressing these complexities: specialized talent, governance, and risk management.</span></p>
<p><span dir="auto">Regarding the first point, </span><strong><span dir="auto">he warned that a company&#8217;s operational experience does not necessarily translate into the ability</span></strong><span dir="auto"> to manage projects.</span></p>
<blockquote><p><span dir="auto">“There’s no doubt that there may be great </span><em><span dir="auto">expertise</span></em><span dir="auto"> in terms of operations, but perhaps not in the area of ​​projects. And this is something that comes at a very high price,” he stated.</span></p></blockquote>
<p><span dir="auto">Added to this gap is the need to establish governance mechanisms capable of keeping investments under review throughout their execution, something especially relevant for logistics projects that can extend over several years.</span></p>
<p><span dir="auto">During that period, governments, regulations, tax conditions, markets, technologies, or geopolitical scenarios can change. An investment that made sense when it was approved may encounter a completely different scenario before it is completed.</span></p>
<p><span dir="auto">For Pinto, managing these risks does not necessarily mean avoiding events that are beyond the control of organizations, but rather developing the capacity to react when they occur.</span></p>
<p><span dir="auto">This can even lead to one of the most difficult decisions within a company: stopping a project that technically meets its schedule and budget because the conditions that justified the investment have disappeared.</span></p>
<blockquote><p><span dir="auto">Due to “a major change in rules, for example, tax rules, you can now assess that this project no longer makes sense, but it is on time, it is on budget, technically perfect, but no, it no longer makes sense, let&#8217;s stop it,” he exemplified.</span></p></blockquote>
<p><span dir="auto">The problem is that organizations often resist abandoning investments after having already committed resources to them. The so-called </span><em><span dir="auto">sunk</span></em><span dir="auto"> cost can lead to continued capital expenditures simply because too much has already been invested to accept halting the project.</span></p>
<blockquote><p><span dir="auto">Pinto sums it up with an analogy: “You don’t need to keep digging to discover you’re in a hole. Basically, I’m in the hole, I have no way out of here, so why would I keep digging deeper?”</span></p></blockquote>
<p><span dir="auto">The decision also has an </span><strong><span dir="auto">organizational dimension</span></strong><span dir="auto"> . Canceling an investment can be interpreted as admitting a mistake by those who approved it, when proper governance should distinguish between a bad decision and a scenario that changed during implementation.</span></p>
<p><strong><span dir="auto">For supply chains, this capacity becomes even more critical in an environment marked by regulatory changes</span></strong><span dir="auto"> , trade tensions, geopolitical conflicts, and technological transformations. Projects need to be monitored not only in terms of their physical and financial progress, but also against the </span><em><span dir="auto">business case</span></em><span dir="auto"> that originally justified them.</span></p>
<p><span dir="auto">Artificial intelligence (AI) is beginning to be incorporated into this equation.</span></p>
<p><span dir="auto">Pinto believes that its greatest potential in capital-intensive projects could be found less in automating administrative tasks and more in using large amounts of historical information to improve decisions and anticipate scenarios.</span></p>
<p><span dir="auto">For this to happen, there is one condition: organizations need structured processes, governance, and, above all, reliable and transparent information about their projects.</span></p>
<blockquote><p><span dir="auto">“Data is essential to enable future predictions with a much greater capacity than we have today,” he explained.</span></p></blockquote>
<p><span dir="auto">This opens up the possibility of </span><strong><span dir="auto">using AI to identify patterns associated with delays, cost overruns, deviations, and risks</span></strong><span dir="auto"> before they materialize, but also to provide information that allows us to determine whether an investment continues to be worthwhile.</span></p>
<blockquote><p><span dir="auto">“If you allow a wrong decision to go unmade, that can mean millions of dollars,” Pinto said.</span></p></blockquote>
<p><span dir="auto">In an industry where increasing capacity requires investments that can take years to mature, the discussion goes beyond project management methodologies. For transportation, logistics, and supply chains, professionalizing their execution also means developing the capacity to measure whether they are truly generating the promised results, adapting them when the environment changes, and, when necessary, recognizing in time when continuing to invest may be more costly than stopping.</span></p>
<p><span dir="auto">Comment and follow us on LinkedIn:  </span><a href="https://www.linkedin.com/in/enrique-duarte-rionda-a0714647/"><span dir="auto">@Enrique Duarte Rionda</span></a><span dir="auto">  /  </span><a id="menurj3" class="fui-Link ___1q1shib f2hkw1w f3rmtva f1ewtqcl fyind8e f1k6fduh f1w7gpdv fk6fouc fjoy568 figsok6 f1s184ao f1mk8lai fnbmjn9 f1o700av f13mvf36 f1cmlufx f9n3di6 f1ids18y f1tx3yz7 f1deo86v f1eh06m1 f1iescvh fhgqx19 f1olyrje f1p93eir f1nev41a f1h8hb77 f1lqvz6u f10aw75t fsle3fq f17ae5zn" title="https://www.linkedin.com/company/t21-grupo-comunicai-ny-medios/" href="https://www.linkedin.com/company/t21-grupo-comunicai-n-y-medios/" target="_blank" rel="noreferrer noopener" aria-label="Link @GrupoT21"><span dir="auto">@GrupoT21</span></a></p>
<p>El cargo <a href="https://t21.us/logistics-faces-the-challenge-of-knowing-when-an-investment-no-longer-makes-sense/">Logistics faces the challenge of knowing when an investment no longer makes sense.</a> apareció primero en <a href="https://t21.us">T21</a>.</p>
]]></content:encoded>
					
		
		
			</item>
	</channel>
</rss>
