<?xml version="1.0" encoding="UTF-8"?><rss version="2.0"
	xmlns:content="http://purl.org/rss/1.0/modules/content/"
	xmlns:wfw="http://wellformedweb.org/CommentAPI/"
	xmlns:dc="http://purl.org/dc/elements/1.1/"
	xmlns:atom="http://www.w3.org/2005/Atom"
	xmlns:sy="http://purl.org/rss/1.0/modules/syndication/"
	xmlns:slash="http://purl.org/rss/1.0/modules/slash/"
	>

<channel>
	<title>NEW EQUIPMENT archivos - T21</title>
	<atom:link href="https://t21.us/tag/new-equipment/feed/" rel="self" type="application/rss+xml" />
	<link>https://t21.us/tag/new-equipment/</link>
	<description>The leading provider of news in the Transportation and Logistics Sector, including Air, Maritime, Land, and Railway, in Mexico and Latin America.</description>
	<lastBuildDate>Fri, 23 Jan 2026 20:58:19 +0000</lastBuildDate>
	<language>en-US</language>
	<sy:updatePeriod>
	hourly	</sy:updatePeriod>
	<sy:updateFrequency>
	1	</sy:updateFrequency>
	<generator>https://wordpress.org/?v=7.0</generator>

<image>
	<url>https://t21.us/wp-content/uploads/2024/04/cropped-t21-favicon-200-32x32-1.png</url>
	<title>NEW EQUIPMENT archivos - T21</title>
	<link>https://t21.us/tag/new-equipment/</link>
	<width>32</width>
	<height>32</height>
</image> 
	<item>
		<title>CICE strengthens Veracruz with new equipment and accelerates the expansion of Bahía Norte</title>
		<link>https://t21.us/cice-strengthens-veracruz-with-new-equipment-and-accelerates-the-expansion-of-bahia-norte/</link>
		
		<dc:creator><![CDATA[T21 Media]]></dc:creator>
		<pubDate>Fri, 23 Jan 2026 20:58:19 +0000</pubDate>
				<category><![CDATA[Maritime]]></category>
		<category><![CDATA[CICE]]></category>
		<category><![CDATA[CICE GROUP]]></category>
		<category><![CDATA[NEW EQUIPMENT]]></category>
		<category><![CDATA[PORT OG VERACRUZ]]></category>
		<guid isPermaLink="false">https://t21.us/?p=633194</guid>

					<description><![CDATA[<p>In a move that reinforces its commitment to modernizing the Mexican port system, Grupo CICE added two multipurpose rail cranes to the equipment of its Semi-Specialized Container and Project Cargo Terminal in the North Bay of the port of Veracruz, consolidating an additional phase of expansion that responds to the growing logistical demands of foreign trade. Last Monday, [&#8230;]</p>
<p>El cargo <a href="https://t21.us/cice-strengthens-veracruz-with-new-equipment-and-accelerates-the-expansion-of-bahia-norte/">CICE strengthens Veracruz with new equipment and accelerates the expansion of Bahía Norte</a> apareció primero en <a href="https://t21.us">T21</a>.</p>
]]></description>
										<content:encoded><![CDATA[<p><img decoding="async" src="https://t21.com.mx/wp-content/uploads/2026/01/Grupo-CICE-nuevas-gruas-cc.jpg" /></p>
<p><span dir="auto">In a move that reinforces its commitment to modernizing the Mexican port system, </span><strong><a href="https://home.grupocice.com/"><span dir="auto">Grupo CICE</span></a><span dir="auto"> added two multipurpose rail cranes</span></strong><span dir="auto"> to the equipment of its Semi-Specialized Container and Project Cargo Terminal in the North Bay of the port of Veracruz, consolidating an additional phase of expansion that responds to the growing logistical demands of foreign trade.</span></p>
<p><span dir="auto">Last Monday, January 19, the vessel UHL FELICITY arrived at the port terminal carrying the components for the </span><strong><span dir="auto">new Liebherr P180 LS cranes</span></strong><span dir="auto"> , whose assembly is scheduled to be completed during the first quarter of this year. Subsequently, the units will enter their operational testing and performance evaluation phase before being formally integrated into the vessel handling system before the end of the second quarter.</span></p>
<blockquote><p><span dir="auto">These cranes represent a significant advancement for the terminal: they have a safe lifting capacity of 65 tons, can operate up to 80 tons in Twin Lift mode or even 100 tons in Tandem configuration, and can handle up to 20 rows of containers, enabling them to service large-scale container ships. Furthermore, </span><strong><span dir="auto">they incorporate remote operating systems (ROS) and energy recovery technology (Active Front End)</span></strong><span dir="auto"> , elements that pave the way for more efficient and competitive operations.</span></p></blockquote>
<div class="jeg_preview_slider gallery_1" data-selector="gallery_1">
<div class="jeg_preview_holder">
<div class="jeg_preview_media">
<div class="jeg_preview_media_holder">
<h3></h3>
<div class="jeg_preview_media_content">
<div class="jeg_preview_media_content_holder_padding">
<div class="jeg_preview_media_content_holder"><img decoding="async" class="jeg_preview_hide" src="https://t21.com.mx/wp-content/uploads/2026/01/1-IMG_0087-scaled.jpg" /></div>
<div><img decoding="async" src="https://t21.com.mx/wp-content/uploads/2026/01/vlcsnap-2026-01-21-10h49m15s053-copia.jpg" /></div>
</div>
<div class="jeg_preview_media_content_navigation">
<div class="next"><span dir="auto">The integration of this equipment &#8211; which will coexist with the already operational multipurpose rubber-tired cranes from manufacturers such as Liebherr and Konecranes-Gottwald &#8211; is part of an </span><strong><span dir="auto">operational flexibility</span></strong><span dir="auto"> strategy that seeks to optimize the maneuvering of ships and the provision of port services, both for containerized cargo and for project cargo.</span></div>
</div>
</div>
</div>
</div>
</div>
</div>
<p><span dir="auto">This development takes place within the framework of the second stage of the </span><strong><span dir="auto">Semi-Specialized Container and Cargo Terminal Project</span></strong><span dir="auto"> , whose commissioning was announced in December 2025 and involved the enabling of an eight thousand square meter (m²) CFS warehouse, 350 connections for refrigerated containers and 570 additional positions for storage, aimed at streamlining cargo flows both LCL and FCL and improving entry and exit times under customs standards.</span></p>
<blockquote><p><span dir="auto">The terminal, which covers an area of ​​more than 22 hectares with 550 linear meters of dock and dynamic capacity to handle hundreds of thousands of 20-foot containers (TEU), has been conceived from its origin as a key component to </span><strong><span dir="auto">strengthen the competitiveness of the port of Veracruz</span></strong><span dir="auto"> , one of the most important logistics hubs in Mexico due to its connectivity with markets in Europe, South America and the east coast of the United States.</span></p></blockquote>
<p><span dir="auto">This momentum is also anchored in the broader context of the logistics sector, where </span><strong><span dir="auto">Veracruz seeks to consolidate its position as a modern hub for port services</span></strong><span dir="auto"> in response to structural pressures such as </span><em><span dir="auto">nearshoring</span></em><span dir="auto"> and the demand for more resilient and efficient supply chains. Within this framework, the expansion of Bahía Norte is seen not only as a physical expansion, but also as a strategic reconfiguration of the port space that enables greater operational capacity without compromising safety standards or service times.</span></p>
<p><span dir="auto">The arrival of the new cranes is part of a series of investments and expansions by Grupo CICE that began with the commissioning of the first phase in April 2025. This next phase positions the Bahía Norte terminal as a leading player in national port competitiveness. In an environment where operational efficiency is increasingly demanded by global supply chains, </span><strong><span dir="auto">the modernization of infrastructure and equipment—such as that promoted by Grupo CICE—translates into a tangible improvement in the port&#8217;s capacity to respond to growing volumes of international trade</span></strong><span dir="auto"> .</span></p>
<p><span dir="auto">Comment and follow us on X:  </span><a href="https://twitter.com/GrupoT21"><span dir="auto">@GrupoT21</span></a></p>
<p>El cargo <a href="https://t21.us/cice-strengthens-veracruz-with-new-equipment-and-accelerates-the-expansion-of-bahia-norte/">CICE strengthens Veracruz with new equipment and accelerates the expansion of Bahía Norte</a> apareció primero en <a href="https://t21.us">T21</a>.</p>
]]></content:encoded>
					
		
		
			</item>
	</channel>
</rss>
