<?xml version="1.0" encoding="UTF-8"?><rss version="2.0"
	xmlns:content="http://purl.org/rss/1.0/modules/content/"
	xmlns:wfw="http://wellformedweb.org/CommentAPI/"
	xmlns:dc="http://purl.org/dc/elements/1.1/"
	xmlns:atom="http://www.w3.org/2005/Atom"
	xmlns:sy="http://purl.org/rss/1.0/modules/syndication/"
	xmlns:slash="http://purl.org/rss/1.0/modules/slash/"
	>

<channel>
	<title>MEXICAN ASSOCIATION OF HIGH ENGINEERING archivos - T21</title>
	<atom:link href="https://t21.us/tag/mexican-association-of-high-engineering/feed/" rel="self" type="application/rss+xml" />
	<link>https://t21.us/tag/mexican-association-of-high-engineering/</link>
	<description>The leading provider of news in the Transportation and Logistics Sector, including Air, Maritime, Land, and Railway, in Mexico and Latin America.</description>
	<lastBuildDate>Thu, 16 Jul 2026 23:56:53 +0000</lastBuildDate>
	<language>en-US</language>
	<sy:updatePeriod>
	hourly	</sy:updatePeriod>
	<sy:updateFrequency>
	1	</sy:updateFrequency>
	<generator>https://wordpress.org/?v=7.0.1</generator>

<image>
	<url>https://t21.us/wp-content/uploads/2024/04/cropped-t21-favicon-200-32x32-1.png</url>
	<title>MEXICAN ASSOCIATION OF HIGH ENGINEERING archivos - T21</title>
	<link>https://t21.us/tag/mexican-association-of-high-engineering/</link>
	<width>32</width>
	<height>32</height>
</image> 
	<item>
		<title>Second phase of passenger train construction begins in Mexico</title>
		<link>https://t21.us/second-phase-of-passenger-train-construction-begins-in-mexico/</link>
		
		<dc:creator><![CDATA[T21 Media]]></dc:creator>
		<pubDate>Thu, 16 Jul 2026 23:56:53 +0000</pubDate>
				<category><![CDATA[FEATURED]]></category>
		<category><![CDATA[Railway]]></category>
		<category><![CDATA[ATTRAPI]]></category>
		<category><![CDATA[CONSTRUCTION]]></category>
		<category><![CDATA[MEXICAN ASSOCIATION OF HIGH ENGINEERING]]></category>
		<category><![CDATA[PASSENGER TRAINS]]></category>
		<category><![CDATA[RAILWAY PROJECTS]]></category>
		<guid isPermaLink="false">https://t21.us/?p=637075</guid>

					<description><![CDATA[<p>The Mexican government has started the second stage of passenger train construction, whose works and tenders will be in charge of the Ministry of National Defense (Defensa) and the Agency of Trains and Integrated Public Transport (ATTRAPI) . “We finished all the technical studies, basic engineering and demand studies and the Felipe Ángeles Engineering Group will execute the Irapuato-León, [&#8230;]</p>
<p>El cargo <a href="https://t21.us/second-phase-of-passenger-train-construction-begins-in-mexico/">Second phase of passenger train construction begins in Mexico</a> apareció primero en <a href="https://t21.us">T21</a>.</p>
]]></description>
										<content:encoded><![CDATA[<p><img decoding="async" src="https://t21.com.mx/wp-content/uploads/2026/07/Sin-titulo-10.jpg" /></p>
<p><span dir="auto">The Mexican government has started the second stage of passenger train construction, whose works and tenders will be in charge of the </span><a href="https://www.gob.mx/defensa/es/"><span dir="auto">Ministry of National Defense (Defensa)</span></a><span dir="auto"> and the </span><a href="https://www.gob.mx/attrapi/es"><span dir="auto">Agency of Trains and Integrated Public Transport (ATTRAPI)</span></a><span dir="auto"> .</span></p>
<blockquote><p><span dir="auto">“We finished all the technical studies, basic engineering and demand studies and the Felipe Ángeles Engineering Group will execute the Irapuato-León, León-Guadalajara and we have already launched the international public tender because we want more participation and more bids for the first section that goes from Querétaro to San Miguel de Allende, which is the Querétaro-San Luis Potosí,” said Efraín Deschamps Gutiérrez de Velasco, director of Works at ATTRAPI.</span></p></blockquote>
<figure id="attachment_678828" class="wp-caption aligncenter" aria-describedby="caption-attachment-678828"><img fetchpriority="high" decoding="async" class="wp-image-678828 size-full" src="https://t21.com.mx/wp-content/uploads/2026/07/trenes-3.png" sizes="(max-width: 1047px) 100vw, 1047px" srcset="https://t21.com.mx/wp-content/uploads/2026/07/trenes-3.png 1047w, https://t21.com.mx/wp-content/uploads/2026/07/trenes-3-300x168.png 300w, https://t21.com.mx/wp-content/uploads/2026/07/trenes-3-1024x574.png 1024w, https://t21.com.mx/wp-content/uploads/2026/07/trenes-3-768x431.png 768w, https://t21.com.mx/wp-content/uploads/2026/07/trenes-3-600x336.png 600w, https://t21.com.mx/wp-content/uploads/2026/07/trenes-3-150x84.png 150w, https://t21.com.mx/wp-content/uploads/2026/07/trenes-3-750x420.png 750w" alt="" width="1047" height="587" data-pin-no-hover="true" /><figcaption id="caption-attachment-678828" class="wp-caption-text"><span dir="auto">Source: ATTRAPI.</span></figcaption></figure>
<p><span dir="auto">He announced that next Monday they will launch the bidding process for the San Luis Potosí to Saltillo section, while they continue with the demand and pre-investment studies and basic engineering for the Mazatlán-Los Mochis section, although he clarified that he does not yet have an authorized start date.</span></p>
<p><span dir="auto">During his participation in the </span><strong><span dir="auto">XXV National Meeting of Land Transportation</span></strong><span dir="auto"> , organized by the </span><a href="https://amivtac.org/"><span dir="auto">Mexican Association of Land Transportation Engineering (AMIVTAC)</span></a><span dir="auto"> which is taking place in Morelia, Michoacán, he reiterated that for these sections there will only be dedicated lanes, so &#8221; </span><strong><span dir="auto">there will be no interaction with freight lanes</span></strong><span dir="auto"> , nor level crossings; we have maximum speeds of 160 to 200 kilometers per hour.&#8221;</span></p>
<p><span dir="auto">He also mentioned that </span><strong><span dir="auto">the third phase, planned</span></strong><span dir="auto"> for approximately 1,100 kilometers, will cover the Pacific Corridor, specifically the Guadalajara-Tepic, Mazatlán-Los Mochis (currently under development with no start date for construction), Los Mochis-Guaymas, and Guaymas-Hermosillo sections. A potential fourth phase would include the Tepic-Mazatlán and Hermosillo-Nogales sections.</span></p>
<blockquote><p><span dir="auto">“ </span><strong><span dir="auto">We are building an integrated national rail network, connected </span></strong><strong><span dir="auto">to other modes of transport</span></strong><span dir="auto"> . Each of the stations we are building also includes an integrated space for urban public transport. We want to consolidate a modern rail system,” emphasized Efraín Deschamps Gutiérrez de Velasco.</span></p></blockquote>
<p><span dir="auto">Regarding the first stage, he recalled that two sections are being built by the Felipe Ángeles Engineering Group, the Mexico-AIFA and AIFA-Pachuca, and Mexico-Queretaro, while ATTRAPI, through tenders, is building the Queretaro-Irapuato and Saltillo-Nuevo Laredo sections.</span></p>
<figure id="attachment_678829" class="wp-caption aligncenter" aria-describedby="caption-attachment-678829"><img decoding="async" class="wp-image-678829 size-full" src="https://t21.com.mx/wp-content/uploads/2026/07/trenes-2.png" sizes="(max-width: 1040px) 100vw, 1040px" srcset="https://t21.com.mx/wp-content/uploads/2026/07/trenes-2.png 1040w, https://t21.com.mx/wp-content/uploads/2026/07/trenes-2-300x157.png 300w, https://t21.com.mx/wp-content/uploads/2026/07/trenes-2-1024x537.png 1024w, https://t21.com.mx/wp-content/uploads/2026/07/trenes-2-768x402.png 768w, https://t21.com.mx/wp-content/uploads/2026/07/trenes-2-600x314.png 600w, https://t21.com.mx/wp-content/uploads/2026/07/trenes-2-150x79.png 150w, https://t21.com.mx/wp-content/uploads/2026/07/trenes-2-750x393.png 750w" alt="" width="1040" height="545" data-pin-no-hover="true" /><figcaption id="caption-attachment-678829" class="wp-caption-text"><span dir="auto">Source: ATTRAPI.</span></figcaption></figure>
<p><span dir="auto">Regarding the Saltillo-Nuevo Laredo section, he said that it is the longest stretch that is already under construction and covers 396.34 kilometers from the Derramadero industrial zone to Nuevo Laredo.</span></p>
<figure id="attachment_678830" class="wp-caption aligncenter" aria-describedby="caption-attachment-678830"><img decoding="async" class="wp-image-678830 size-full" src="https://t21.com.mx/wp-content/uploads/2026/07/tren-Saltillo.png" sizes="(max-width: 1032px) 100vw, 1032px" srcset="https://t21.com.mx/wp-content/uploads/2026/07/tren-Saltillo.png 1032w, https://t21.com.mx/wp-content/uploads/2026/07/tren-Saltillo-300x163.png 300w, https://t21.com.mx/wp-content/uploads/2026/07/tren-Saltillo-1024x558.png 1024w, https://t21.com.mx/wp-content/uploads/2026/07/tren-Saltillo-768x418.png 768w, https://t21.com.mx/wp-content/uploads/2026/07/tren-Saltillo-600x327.png 600w, https://t21.com.mx/wp-content/uploads/2026/07/tren-Saltillo-150x82.png 150w, https://t21.com.mx/wp-content/uploads/2026/07/tren-Saltillo-750x408.png 750w" alt="" width="1032" height="562" data-pin-no-hover="true" /><figcaption id="caption-attachment-678830" class="wp-caption-text"><span dir="auto">Source: ATTRAPI.</span></figcaption></figure>
<p><span dir="auto">Comment and follow us on LinkedIn:  </span><a href="https://www.linkedin.com/in/evangelina-del-toro-31b8104b/"><span dir="auto">@Evangelina del Toro</span></a><span dir="auto">  /  </span><a href="https://www.linkedin.com/company/t21-grupo-comunicai-n-y-medios/"><span dir="auto">@GrupoT21</span></a></p>
<p>El cargo <a href="https://t21.us/second-phase-of-passenger-train-construction-begins-in-mexico/">Second phase of passenger train construction begins in Mexico</a> apareció primero en <a href="https://t21.us">T21</a>.</p>
]]></content:encoded>
					
		
		
			</item>
	</channel>
</rss>
