<?xml version="1.0" encoding="UTF-8"?><rss version="2.0"
	xmlns:content="http://purl.org/rss/1.0/modules/content/"
	xmlns:wfw="http://wellformedweb.org/CommentAPI/"
	xmlns:dc="http://purl.org/dc/elements/1.1/"
	xmlns:atom="http://www.w3.org/2005/Atom"
	xmlns:sy="http://purl.org/rss/1.0/modules/syndication/"
	xmlns:slash="http://purl.org/rss/1.0/modules/slash/"
	>

<channel>
	<title>MAZATLÁN MARITIME TERMINAL archivos - T21</title>
	<atom:link href="https://t21.us/tag/mazatlan-maritime-terminal/feed/" rel="self" type="application/rss+xml" />
	<link>https://t21.us/tag/mazatlan-maritime-terminal/</link>
	<description>The leading provider of news in the Transportation and Logistics Sector, including Air, Maritime, Land, and Railway, in Mexico and Latin America.</description>
	<lastBuildDate>Wed, 06 Aug 2025 23:19:53 +0000</lastBuildDate>
	<language>en-US</language>
	<sy:updatePeriod>
	hourly	</sy:updatePeriod>
	<sy:updateFrequency>
	1	</sy:updateFrequency>
	<generator>https://wordpress.org/?v=7.0</generator>

<image>
	<url>https://t21.us/wp-content/uploads/2024/04/cropped-t21-favicon-200-32x32-1.png</url>
	<title>MAZATLÁN MARITIME TERMINAL archivos - T21</title>
	<link>https://t21.us/tag/mazatlan-maritime-terminal/</link>
	<width>32</width>
	<height>32</height>
</image> 
	<item>
		<title>TMAZ marks a new logistical milestone; unloads over 1,000 tons of wind turbines</title>
		<link>https://t21.us/tmaz-marks-a-new-logistical-milestone-unloads-over-1000-tons-of-wind-turbines/</link>
		
		<dc:creator><![CDATA[T21 Media]]></dc:creator>
		<pubDate>Wed, 06 Aug 2025 23:19:53 +0000</pubDate>
				<category><![CDATA[Maritime]]></category>
		<category><![CDATA[MANEUVERS]]></category>
		<category><![CDATA[MAZATLÁN MARITIME TERMINAL]]></category>
		<category><![CDATA[ML FRIGATE]]></category>
		<category><![CDATA[OVERSIZED LOAD]]></category>
		<category><![CDATA[TMAZ]]></category>
		<guid isPermaLink="false">https://t21.us/?p=629643</guid>

					<description><![CDATA[<p>Mazatlán Maritime Terminal (TMAZ) , the port of Hanseatic Global Terminals , reached a new operational milestone by receiving an oversized steel load destined for the national electricity sector . During the service of the ML FRAGATA ship, coming from China, 173 megastructures for wind towers were unloaded, weighing more than 1,000 tons , including assembly parts weighing more than 36 tons [&#8230;]</p>
<p>El cargo <a href="https://t21.us/tmaz-marks-a-new-logistical-milestone-unloads-over-1000-tons-of-wind-turbines/">TMAZ marks a new logistical milestone; unloads over 1,000 tons of wind turbines</a> apareció primero en <a href="https://t21.us">T21</a>.</p>
]]></description>
										<content:encoded><![CDATA[<p><img decoding="async" src="https://t21.com.mx/wp-content/uploads/2025/08/TMZ3.jpg" /></p>
<p><a href="https://www.tmaz.com.mx/"><span>Mazatlán Maritime Terminal (TMAZ)</span></a><span> , the port of </span><a href="https://www.hanseaticglobalterminals.com/en/hgt/home.html"><span>Hanseatic Global Terminals</span></a><span> , reached a new operational milestone by receiving </span><strong><span>an oversized steel load destined for the national electricity sector</span></strong><span> .</span></p>
<p><span>During the service of the ML FRAGATA ship, coming from China, </span><strong><span>173 megastructures for wind towers were unloaded, weighing more than 1,000 tons</span></strong><span> , including assembly parts weighing more than 36 tons each.</span></p>
<blockquote><p><span>&#8220;The successful reception of this oversized cargo confirms our operational and infrastructure capacity, as well as our commitment to being a terminal prepared for national projects. The service was carried out with precautionary measures and safety, quality cargo care, and good productivity rates,&#8221; said Francisco Quintana Schnettler, Director of Operations at TMAZ.</span></p></blockquote>
<p><strong><span>The maneuver represented a technical and logistical challenge</span></strong><span> due to the size and weight of the cargo. Special planning was implemented prior to the ship&#8217;s arrival, as well as shift-by-shift rescheduling, with the participation of a multidisciplinary team.</span></p>
<p><span>Among the resources used for the maneuvers were MHC and Nave mobile cranes with special attachments for handling loads, adapted Reach Stackers with special attachments, and forklifts. </span><strong><span>The maneuvering and storage area covered more than 5,500 square meters (m²)</span></strong><span> .</span></p>
<p><span>In the first half of 2025, TMAZ reported growth in its </span><strong><span>cargo throughput, registering a 15% increase</span></strong><span> compared to the same period in 2024. This progress was driven primarily by the dynamic handling of containers and loose cargo, particularly steel and project cargo.</span></p>
<p><span>Comment and follow us on X:  </span><a href="https://twitter.com/GrupoT21"><span>@GrupoT21</span></a></p>
<p>El cargo <a href="https://t21.us/tmaz-marks-a-new-logistical-milestone-unloads-over-1000-tons-of-wind-turbines/">TMAZ marks a new logistical milestone; unloads over 1,000 tons of wind turbines</a> apareció primero en <a href="https://t21.us">T21</a>.</p>
]]></content:encoded>
					
		
		
			</item>
	</channel>
</rss>
