<?xml version="1.0" encoding="UTF-8"?><rss version="2.0"
	xmlns:content="http://purl.org/rss/1.0/modules/content/"
	xmlns:wfw="http://wellformedweb.org/CommentAPI/"
	xmlns:dc="http://purl.org/dc/elements/1.1/"
	xmlns:atom="http://www.w3.org/2005/Atom"
	xmlns:sy="http://purl.org/rss/1.0/modules/syndication/"
	xmlns:slash="http://purl.org/rss/1.0/modules/slash/"
	>

<channel>
	<title>K Line archivos - T21</title>
	<atom:link href="https://t21.us/tag/k-line-d91/feed/" rel="self" type="application/rss+xml" />
	<link>https://t21.us/tag/k-line-d91/</link>
	<description>The leading provider of news in the Transportation and Logistics Sector, including Air, Maritime, Land, and Railway, in Mexico and Latin America.</description>
	<lastBuildDate>Thu, 20 Feb 2025 00:23:15 +0000</lastBuildDate>
	<language>en-US</language>
	<sy:updatePeriod>
	hourly	</sy:updatePeriod>
	<sy:updateFrequency>
	1	</sy:updateFrequency>
	<generator>https://wordpress.org/?v=7.0.6</generator>

<image>
	<url>https://t21.us/wp-content/uploads/2024/04/cropped-t21-favicon-200-32x32-1.png</url>
	<title>K Line archivos - T21</title>
	<link>https://t21.us/tag/k-line-d91/</link>
	<width>32</width>
	<height>32</height>
</image> 
	<item>
		<title>The Tehuantepec Isthmus Interoceanic Corridor will operate in its entirety until 2026</title>
		<link>https://t21.us/the-tehuantepec-isthmus-interoceanic-corridor-will-operate-in-its-entirety-until-2026/</link>
		
		<dc:creator><![CDATA[T21 Media]]></dc:creator>
		<pubDate>Thu, 20 Feb 2025 00:23:15 +0000</pubDate>
				<category><![CDATA[Aerial]]></category>
		<category><![CDATA[CLAUDIA SHEINBAU]]></category>
		<category><![CDATA[INTEROCEANIC CORRIDOR OF THE ISTHMUS OF TEHUANTEPEC]]></category>
		<category><![CDATA[K Line]]></category>
		<category><![CDATA[OLMECA REFINERY]]></category>
		<guid isPermaLink="false">https://t21.us/?p=625374</guid>

					<description><![CDATA[<p>The Isthmus of Tehuantepec Interoceanic Corridor (CIIT) will be fully completed by the first half of next year , however, it will be in July 2025 when section 1, which runs from Ixtepec to Tonalá, will begin operating. “Very soon we will be inaugurating different parts of this train that will be ready, we think, in the first half of [&#8230;]</p>
<p>El cargo <a href="https://t21.us/the-tehuantepec-isthmus-interoceanic-corridor-will-operate-in-its-entirety-until-2026/">The Tehuantepec Isthmus Interoceanic Corridor will operate in its entirety until 2026</a> apareció primero en <a href="https://t21.us">T21</a>.</p>
]]></description>
										<content:encoded><![CDATA[<p><img decoding="async" src="https://t21.com.mx/wp-content/uploads/2025/02/Sin-titulo-16.jpg" /></p>
<div class="jeg_viewport">
<div class="post-wrapper">
<div class="post-wrap">
<div class="jeg_main ">
<div class="jeg_container">
<div class="jeg_content jeg_singlepage">
<div class="container">
<div class="row">
<div class="jeg_main_content col-md-8">
<div class="jeg_inner_content">
<div class="entry-content no-share">
<div class="content-inner ">
<p><span>The </span><a href="https://www.gob.mx/ciit"><span>Isthmus of Tehuantepec Interoceanic Corridor (CIIT)</span></a><span> will be fully completed </span><strong><span>by the first half of next year</span></strong><span> , however, it will be in July 2025 when </span><strong><span>section 1, which runs from Ixtepec to Tonalá, will begin operating.</span></strong></p>
<blockquote><p><span>“Very soon we will be inaugurating different parts of this train that will be ready, we think, in the first half of 2026 (…) completely ready and operating at 100%, including a very important part of the port of Salina Cruz,” said Claudia Sheinbaum, President of Mexico.</span></p></blockquote>
<p><span>He considered that the CIIT is not only a crossing from the Pacific to the Atlantic or vice versa, but it will connect to the Mayan Train for cargo, another line to Dos Bocas in the Olmeca refinery and another to Ciudad Hidalgo, in Chiapas,</span></p>
<p><span>For his part, Juan Carlos Vera Minjares, general director of CIIT, mentioned that this section is the most advanced of those that remain to be rehabilitated, as </span><strong><span>it is 87% complete</span></strong><span> .</span></p>
<blockquote><p><span>“The completion date for the entire line is scheduled for the second quarter of next year; however, right now, in the near future, in July, we will be putting into operation section 1 to Tonalá to begin using the railway and industrial communication,” he said.</span></p></blockquote>
<p><span>He explained that through Line &#8220;Z&#8221; that runs from Coatzacoalcos to Salina Cruz, and since its inauguration in December 2023, more than 63 thousand passengers and more than 316 thousand tons of cargo have been transported.</span></p>
<p><span>While the “FA” Line that runs from Coatzacoalcos to Palenque, which began operating in September of last year, has transported more than 19 thousand passengers and more than 29 thousand tons of cargo.</span></p>
<blockquote><p><span>“The rehabilitation process continues for the construction of two transfer yards at the Roberto Ayala station in Huimanguillo and Pakal-Ná in the municipality of Palenque. Nine laredos are also being completed, but the most important thing is the access road that is about to begin construction at the Roberto Ayala station to Dos Bocas,” he said.</span></p></blockquote>
<p><span>He specified that this line is the one that runs from Huimanguillo to Dos Bocas and its purpose is to connect the Olmeca refinery with the entire multimodal system, although he explained that </span><strong><span>there is a 39% release of the right of way,</span></strong><span> they hope to finish this process in six months, however as of May the estimated construction time will be 18 months, &#8220;we are close to starting work and its completion is scheduled for the last quarter of 2026.&#8221;</span></p>
<p><span>Regarding </span><strong><span>the “K” Line that connects Ixtepec with Ciudad Hidalgo, he explained that the rehabilitation process continues on 459 kilometers of tracks,</span></strong><span> more than 427 railway bridges and more than 600 drainage works, as well as 14 stations. “It is a very challenging job and, mainly, we have to be very careful with the rains, the rainy season, because of the flood zones where it is located,” he said.</span></p>
<p><span>He said that section 2 from Tonalá to the city of Huixtla and section 3 from Huixtla to the border </span><strong><span>are 65 percent complete.</span></strong></p>
<p><span>Regarding the 10 Development Poles, Juan Carlos Vera Minjares recalled that Coatzacoalcos I, Coatzacoalcos II and Salina Cruz, which have industrial vocations for the distribution of vehicles and auto parts, were awarded to the company </span><strong><span>Desarrolladora Multimodal del Istmo</span></strong><span> , which has 90% progress in its studies and significant commercial progress.</span></p>
<p><span>While those of Texistepec, San Juan Evangelista, Matías Romero and Santa María Mixtequilla with agro-industrial, medical devices, pharmaceutical and metals vocations, belong to the companies </span><a href="https://proistmo.com/"><span>Proistmo</span></a><span> and </span><strong><span>Profharmax.</span></strong></p>
<p><span>As for the one in Asunción Ixtaltepec, it was handed over on January 31 to the </span><strong><span>company MARZAL </span><em><span>,</span></em></strong><span> a company specialized in recycling high-quality aluminum.</span></p>
<p><span>Regarding Ixtepec, which is aimed at producing green energy, he said that it is </span><strong><span>in the stage of public assemblies and indigenous consultation.</span></strong></p>
<p><span>He reported that the feasibility of the Development Pole in Teapa, Tabasco, has already been confirmed, and that </span><strong><span>the winner of the San Blas Atempa Pole will be announced in the coming days.</span></strong></p>
<p><span><span class="">Comment and follow us on X:  <a href="https://twitter.com/evandeltoro">@evandeltoro</a> / <a href="https://twitter.com/GrupoT21">@GrupoT21</a></span></span></p>
<div class="jnews_inline_related_post_wrapper right">
<div class="jnews_inline_related_post">
<div class="jeg_postblock_21 jeg_postblock jeg_module_hook jeg_pagination_nextprev jeg_col_2o3 jnews_module_639084_0_67b6598dbe051   " data-unique="jnews_module_639084_0_67b6598dbe051">
<div class="jeg_block_heading jeg_block_heading_8 jeg_subcat_right"></div>
</div>
</div>
</div>
</div>
</div>
</div>
</div>
</div>
</div>
</div>
</div>
</div>
</div>
</div>
</div>
<div>
<div class="grecaptcha-badge" data-style="bottomright"></div>
</div>
<p>El cargo <a href="https://t21.us/the-tehuantepec-isthmus-interoceanic-corridor-will-operate-in-its-entirety-until-2026/">The Tehuantepec Isthmus Interoceanic Corridor will operate in its entirety until 2026</a> apareció primero en <a href="https://t21.us">T21</a>.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>Rafael Marín Mollinedo leaves the WTO; returns to Mexico to take over as general director of ANAM</title>
		<link>https://t21.us/625300-2/</link>
		
		<dc:creator><![CDATA[T21 Media]]></dc:creator>
		<pubDate>Tue, 18 Feb 2025 00:33:10 +0000</pubDate>
				<category><![CDATA[FEATURED]]></category>
		<category><![CDATA[Railway]]></category>
		<category><![CDATA[CARS]]></category>
		<category><![CDATA[K Line]]></category>
		<category><![CDATA[PEMEX]]></category>
		<category><![CDATA[TEHUANTEPEC ISTHMUS RAILWAY]]></category>
		<guid isPermaLink="false">https://t21.us/?p=625300</guid>

					<description><![CDATA[<p>The Tehuantepec Isthmus Railroad (FIT) plans to transport cargo from Petróleos Mexicanos (Pemex) and will carry out a pilot test to transport 600 cars from the largest South Korean automobile manufacturer. “We are finalizing the contract to provide the service to Pemex. We have acquired 600 polyethylene hoppers. We already have a letter of intent that will begin producing it [&#8230;]</p>
<p>El cargo <a href="https://t21.us/625300-2/">Rafael Marín Mollinedo leaves the WTO; returns to Mexico to take over as general director of ANAM</a> apareció primero en <a href="https://t21.us">T21</a>.</p>
]]></description>
										<content:encoded><![CDATA[<p><img decoding="async" src="https://t21.com.mx/wp-content/uploads/2025/02/Sin-titulo-12.jpg" /></p>
<p>The <a href="https://www.ferroistmo.com.mx/">Tehuantepec Isthmus Railroad (FIT)</a> plans to transport cargo from <a href="https://www.pemex.com/Paginas/default.aspx">Petróleos Mexicanos (Pemex)</a> and will carry out a pilot test to transport <strong>600 cars from the largest South Korean automobile manufacturer.</strong></p>
<blockquote><p>“We are finalizing the contract to provide the service to Pemex. We have acquired 600 polyethylene hoppers. We already have a letter of intent that will begin producing it again in two months, so we made the investment to move three types, which will run along the line and which we will move to the interior of the country,” said Héctor Rubio Antonio, Deputy Director of Operations at FIT.</p></blockquote>
<p>He said that this product is produced by the companies <a href="https://translate.google.com/website?sl=es&amp;tl=en&amp;hl=es&amp;client=webapp&amp;u=https://www.braskemidesa.com.mx/">Braskem Idesa,</a> located in Coatzacoalcos, Veracruz, and in the <strong>Pemex petrochemical complex La Cangrejera.</strong></p>
<p>Regarding the movement of cars, he explained that <strong>the pilot test will be carried out next March</strong> for the first 600 cars that will arrive from Asia to Salina Cruz, to later take them to Coatzacoalcos and from there they will get on a ship to reach the east coast of the United States.</p>
<p>To this end, he explained that <strong>they have 33 automaxes and will add 250 more</strong> , as they expect to be moving finished vehicles by next June, &#8220;they will not be sold in Mexico but will be used for direct cargo, we are going to make interoceanic crossings.&#8221;</p>
<p>He mentioned that one of the great challenges of the FIT is that 10 percent of the total tons handled in the country by rail are moved.</p>
<p>He also <strong>estimated that the rehabilitation of Line K</strong> , which runs through the states of Oaxaca and Chiapas and has 472 kilometers of railway track, will be completed this year. This infrastructure includes the modernization of 526 bridges, 387 drainage works and 459 tracks, as well as the construction of three passenger stations.</p>
<p>He explained that the Navy is working on three fronts to complete this work, the first from Ixtepec to Arriaga, Arriaga to Mapastepec and Mapastepec to Ciudad Hidalgo.</p>
<blockquote><p>&#8220;The physical progress of the works is almost 62% on roads, 43% on bridges, so the first rehabilitated section for cargo and passengers will be delivered by the middle of this year,&#8221; he said.</p></blockquote>
<p>Currently, the FIT has 20 locomotives that can move up to seven thousand tons in a single train. “We want to have three-kilometer trains, carry as much cargo as possible, move it from Coatzacoalcos to Salina Cruz.”</p>
<p>There are also more than 10 locomotives to make movements in Coatzacoalcos, Matías Romero and Salina Cruz. They also have more than 1,300 cars, including 194 bulk hoppers that move up to 130 tons.</p>
<p>As well as 104 vans to transport 177 cubic meters that allow them to move palletized cargo, groceries and auto parts. 50 articulated modules for the movement of 20-foot and 40-foot containers, among other railway equipment.</p>
<blockquote><p>“We want to create a great diversification for current and new clients, to move all their containerized cargo, bulk, agricultural, automotive, cement, oil and general cargo. And through the Asiponas Multi-Use Terminals and the Specialized Container Terminals, in 2025 we will move 150 thousand TEUs, but in less than 10 years we want to move 1000% and reach 1.4 million TEUs in 2036 without taking the rest of the cargo,” he said.</p></blockquote>
<p>Comment and follow us on X:<a href="https://twitter.com/evandeltoro">@evandeltoro</a> / <a href="https://twitter.com/GrupoT21">@GrupoT21</a></p>
<p>El cargo <a href="https://t21.us/625300-2/">Rafael Marín Mollinedo leaves the WTO; returns to Mexico to take over as general director of ANAM</a> apareció primero en <a href="https://t21.us">T21</a>.</p>
]]></content:encoded>
					
		
		
			</item>
	</channel>
</rss>
