<?xml version="1.0" encoding="UTF-8"?><rss version="2.0"
	xmlns:content="http://purl.org/rss/1.0/modules/content/"
	xmlns:wfw="http://wellformedweb.org/CommentAPI/"
	xmlns:dc="http://purl.org/dc/elements/1.1/"
	xmlns:atom="http://www.w3.org/2005/Atom"
	xmlns:sy="http://purl.org/rss/1.0/modules/syndication/"
	xmlns:slash="http://purl.org/rss/1.0/modules/slash/"
	>

<channel>
	<title>HUTCHISON PORTS CAVE archivos - T21</title>
	<atom:link href="https://t21.us/tag/hutchison-ports-cave/feed/" rel="self" type="application/rss+xml" />
	<link>https://t21.us/tag/hutchison-ports-cave/</link>
	<description>The leading provider of news in the Transportation and Logistics Sector, including Air, Maritime, Land, and Railway, in Mexico and Latin America.</description>
	<lastBuildDate>Mon, 19 May 2025 19:39:25 +0000</lastBuildDate>
	<language>en-US</language>
	<sy:updatePeriod>
	hourly	</sy:updatePeriod>
	<sy:updateFrequency>
	1	</sy:updateFrequency>
	<generator>https://wordpress.org/?v=7.0</generator>

<image>
	<url>https://t21.us/wp-content/uploads/2024/04/cropped-t21-favicon-200-32x32-1.png</url>
	<title>HUTCHISON PORTS CAVE archivos - T21</title>
	<link>https://t21.us/tag/hutchison-ports-cave/</link>
	<width>32</width>
	<height>32</height>
</image> 
	<item>
		<title>Hutchison Ports ICAVE receives new state-of-the-art crane</title>
		<link>https://t21.us/hutchison-ports-icave-receives-new-state-of-the-art-crane/</link>
		
		<dc:creator><![CDATA[T21 Media]]></dc:creator>
		<pubDate>Mon, 19 May 2025 19:39:25 +0000</pubDate>
				<category><![CDATA[Maritime]]></category>
		<category><![CDATA[GANTRY CRANES]]></category>
		<category><![CDATA[Hutchison Ports]]></category>
		<category><![CDATA[HUTCHISON PORTS CAVE]]></category>
		<category><![CDATA[Port of Veracruz]]></category>
		<category><![CDATA[SUPER POST PANAMAX]]></category>
		<guid isPermaLink="false">https://t21.us/?p=627502</guid>

					<description><![CDATA[<p>Hutchison Ports ICAVE , operator of the specialized container terminal at the port of Veracruz, received a new Super-Post-Panamax dock crane this weekend that will allow it to operate two mega-ships simultaneously and increase its flexibility to serve smaller vessels, with an investment of 226 million pesos (mdp). The equipment, unloaded this Sunday, May 18, is designed to be [&#8230;]</p>
<p>El cargo <a href="https://t21.us/hutchison-ports-icave-receives-new-state-of-the-art-crane/">Hutchison Ports ICAVE receives new state-of-the-art crane</a> apareció primero en <a href="https://t21.us">T21</a>.</p>
]]></description>
										<content:encoded><![CDATA[<p><img decoding="async" src="https://t21.com.mx/wp-content/uploads/2025/05/Hutchison-Ports-ICAVE-grua-HPH.jpg" /></p>
<p><a href="https://translate.google.com/website?sl=es&amp;tl=en&amp;hl=es&amp;client=webapp&amp;u=https://hutchisonportsicave.com/es"><span>Hutchison Ports ICAVE</span></a><span> , operator of the specialized container terminal at the port of Veracruz, received a </span><strong><span>new Super-Post-Panamax dock crane</span></strong><span> this weekend that will allow it to operate two mega-ships simultaneously and increase its flexibility to serve smaller vessels, with an investment of 226 million pesos (mdp).</span></p>
<p><span>The equipment, unloaded this Sunday, May 18, </span><strong><span>is designed to be operated remotely from a control room (ROS)</span></strong><span> and incorporates state-of-the-art technology that allows for a boom reach of 68 meters, sufficient to work with vessels up to 24 container rows wide.</span></p>
<p><span>The load capacity of this new equipment reaches 65 tons with </span><em><span>a spreader</span></em><span> and up to 81 tons with a hook, allowing it to perform special maneuvers with high efficiency. Thanks to its fully electric operating system—with a consumption of 13.2 kilovolts and a power factor between 0.9 and 1.0— </span><strong><span>this crane contributes to significantly reducing the company&#8217;s carbon footprint</span></strong><span> .</span></p>
<blockquote><p><span>Susana Díaz Virgen, general manager of Hutchison Ports ICAVE, noted that &#8220;with this acquisition, </span><strong><span>ICAVE adds four cranes with similar characteristics</span></strong><span> , strengthening its ship-to-ship operations and consolidating its position as one of the most modern and sustainable terminals in the Gulf of Mexico.&#8221;</span></p></blockquote>
<p><span>He added that the new crane is expected to begin operations in mid-August 2025, once its technical assessment ( </span><em><span>commissioning</span></em><span> ) process is completed. This will modernize the infrastructure, </span><strong><span>strengthen operational capacity</span></strong><span> , and improve customer service.</span></p>
<p><span>This investment is part of Hutchison Ports&#8217; </span><strong><span>global NET Zero sustainability strategy</span></strong><span> , which aims to reduce absolute Scope 1 and 2 greenhouse gas (GHG) emissions by </span><strong><span>54.6% by 2033 and achieve net zero emissions across its entire value chain by 2050.</span></strong></p>
<p><span>In addition to this addition, which </span><strong><span>brings the total number of cranes at the Veracruz terminal to eight</span></strong><span> , Hutchison Ports ICAVE plans to expand its fleet of equipment during 2025 and 2026 with the arrival of an empty container crane, three heavy-duty Reach Stackers, five RTG cranes and six additional autonomous tractors, all using 100% electric technology.</span></p>
<p><span>These investments are part of the comprehensive modernization and sustainability plan that Hutchison Ports is promoting globally, with a view to </span><strong><span>increasing the efficiency of its terminals</span></strong><span> and contributing to the decarbonization of the logistics sector.</span></p>
<div class="jeg_preview_slider gallery_1" data-selector="gallery_1">
<div class="jeg_preview_holder">
<div class="jeg_preview_media">
<div class="jeg_preview_media_holder">
<h3></h3>
<div class="jeg_preview_media_content">
<div class="jeg_preview_media_content_holder_padding">
<div class="jeg_preview_media_content_holder"><img decoding="async" class="jeg_preview_hide" src="https://t21.com.mx/wp-content/uploads/2025/05/WhatsApp-Image-2025-05-18-at-1.13.19-PM.jpeg" /></div>
</div>
<div class="jeg_preview_media_content_navigation">
<div class="next"><img decoding="async" src="https://t21.com.mx/wp-content/uploads/2025/05/WhatsApp-Image-2025-05-18-at-1.13.20-PM-1.jpeg" /></div>
</div>
</div>
</div>
</div>
<div id="tns1-ow" class="tns-outer">
<div id="tns1-mw" class="tns-ovh">
<div id="tns1-iw" class="tns-inner">
<div id="tns1" class="jeg_preview_bottom_slider tns-slider tns-carousel tns-subpixel tns-calc tns-horizontal jeg_tns_active">
<div class="jeg_preview_item_thumbnail"><img decoding="async" src="https://t21.com.mx/wp-content/uploads/2025/05/WhatsApp-Image-2025-05-18-at-1.13.20-PM-4.jpeg" /></div>
<div><img decoding="async" src="https://t21.com.mx/wp-content/uploads/2025/05/WhatsApp-Image-2025-05-18-at-1.13.20-PM-2.jpeg" /></div>
<div><img decoding="async" src="https://t21.com.mx/wp-content/uploads/2025/05/WhatsApp-Image-2025-05-18-at-1.13.49-PM-1.jpeg" /></div>
</div>
</div>
</div>
</div>
</div>
</div>
<p><span><span class="">Comment and follow us on X: <a href="https://twitter.com/GrupoT21">@GrupoT21</a></span></span></p>
<p>El cargo <a href="https://t21.us/hutchison-ports-icave-receives-new-state-of-the-art-crane/">Hutchison Ports ICAVE receives new state-of-the-art crane</a> apareció primero en <a href="https://t21.us">T21</a>.</p>
]]></content:encoded>
					
		
		
			</item>
	</channel>
</rss>
