<?xml version="1.0" encoding="UTF-8"?><rss version="2.0"
	xmlns:content="http://purl.org/rss/1.0/modules/content/"
	xmlns:wfw="http://wellformedweb.org/CommentAPI/"
	xmlns:dc="http://purl.org/dc/elements/1.1/"
	xmlns:atom="http://www.w3.org/2005/Atom"
	xmlns:sy="http://purl.org/rss/1.0/modules/syndication/"
	xmlns:slash="http://purl.org/rss/1.0/modules/slash/"
	>

<channel>
	<title>CONSTUCTION archivos - T21</title>
	<atom:link href="https://t21.us/tag/constuction/feed/" rel="self" type="application/rss+xml" />
	<link>https://t21.us/tag/constuction/</link>
	<description>The leading provider of news in the Transportation and Logistics Sector, including Air, Maritime, Land, and Railway, in Mexico and Latin America.</description>
	<lastBuildDate>Wed, 28 Jan 2026 00:02:01 +0000</lastBuildDate>
	<language>en-US</language>
	<sy:updatePeriod>
	hourly	</sy:updatePeriod>
	<sy:updateFrequency>
	1	</sy:updateFrequency>
	<generator>https://wordpress.org/?v=7.0.4</generator>

<image>
	<url>https://t21.us/wp-content/uploads/2024/04/cropped-t21-favicon-200-32x32-1.png</url>
	<title>CONSTUCTION archivos - T21</title>
	<link>https://t21.us/tag/constuction/</link>
	<width>32</width>
	<height>32</height>
</image> 
	<item>
		<title>These consortiums are raising their hands to build 4 stations for the Saltillo-Nuevo Laredo train</title>
		<link>https://t21.us/these-consortiums-are-raising-their-hands-to-build-4-stations-for-the-saltillo-nuevo-laredo-train/</link>
		
		<dc:creator><![CDATA[T21 Media]]></dc:creator>
		<pubDate>Wed, 28 Jan 2026 00:02:01 +0000</pubDate>
				<category><![CDATA[FEATURED]]></category>
		<category><![CDATA[Railway]]></category>
		<category><![CDATA[ATTRAPI]]></category>
		<category><![CDATA[CONSTUCTION]]></category>
		<category><![CDATA[RAILWAY PROJECTS]]></category>
		<category><![CDATA[SALTILLO-NUEVO LAREDO TRAIN]]></category>
		<category><![CDATA[TRAINS STATIONS]]></category>
		<guid isPermaLink="false">https://t21.us/?p=633247</guid>

					<description><![CDATA[<p>The  Agency for Trains and Integrated Public Transportation (ATTRAPI) received six bids for the construction and design of the Derramadero, Saltillo, Ramos Arizpe and García stations of the Saltillo–Nuevo Laredo passenger train. According to the tender document, the consortium formed by Comsa Infraestructuras , VISE, COMSA and Regiomontana de Construcción y Servicios submitted a proposal for two billion 567 million [&#8230;]</p>
<p>El cargo <a href="https://t21.us/these-consortiums-are-raising-their-hands-to-build-4-stations-for-the-saltillo-nuevo-laredo-train/">These consortiums are raising their hands to build 4 stations for the Saltillo-Nuevo Laredo train</a> apareció primero en <a href="https://t21.us">T21</a>.</p>
]]></description>
										<content:encoded><![CDATA[<p><img decoding="async" src="https://t21.com.mx/wp-content/uploads/2026/01/Sin-titulo-10.jpg" /></p>
<p><span dir="auto">The  </span><a href="https://www.gob.mx/attrapi"><span dir="auto">Agency for Trains and Integrated Public Transportation (ATTRAPI) </span></a><strong><span dir="auto">received six bids</span></strong><span dir="auto"> for the construction and design of the Derramadero, Saltillo, Ramos Arizpe and García stations of the Saltillo–Nuevo Laredo passenger train.</span></p>
<p><span dir="auto">According to the tender document, the consortium formed by </span><a href="https://www.comsa.com/"><span dir="auto">Comsa Infraestructuras</span></a><span dir="auto"> , VISE, COMSA and Regiomontana de Construcción y Servicios submitted a proposal for two billion 567 million 432 thousand 059.57 pesos.</span></p>
<p><span dir="auto">The lowest offer was the one presented by </span><a href="https://www.idimsa.com.mx/"><span dir="auto"> Ingeniería y Desarrollo Inmobiliario de México</span></a><span dir="auto"> , China Gezhouba Group Company Limited Mexico and Constructora e Inmobiliaria, with two billion 400 million 787 thousand 143.77 pesos.</span></p>
<figure id="attachment_666312" class="wp-caption aligncenter" aria-describedby="caption-attachment-666312"><img fetchpriority="high" decoding="async" class="wp-image-666312 size-full" src="https://t21.com.mx/wp-content/uploads/2026/01/Captura-de-pantalla-2026-01-26-211857.png" sizes="(max-width: 982px) 100vw, 982px" srcset="https://t21.com.mx/wp-content/uploads/2026/01/Captura-de-pantalla-2026-01-26-211857.png 982w, https://t21.com.mx/wp-content/uploads/2026/01/Captura-de-pantalla-2026-01-26-211857-300x214.png 300w, https://t21.com.mx/wp-content/uploads/2026/01/Captura-de-pantalla-2026-01-26-211857-768x549.png 768w, https://t21.com.mx/wp-content/uploads/2026/01/Captura-de-pantalla-2026-01-26-211857-600x429.png 600w, https://t21.com.mx/wp-content/uploads/2026/01/Captura-de-pantalla-2026-01-26-211857-150x107.png 150w, https://t21.com.mx/wp-content/uploads/2026/01/Captura-de-pantalla-2026-01-26-211857-120x86.png 120w, https://t21.com.mx/wp-content/uploads/2026/01/Captura-de-pantalla-2026-01-26-211857-350x250.png 350w, https://t21.com.mx/wp-content/uploads/2026/01/Captura-de-pantalla-2026-01-26-211857-750x536.png 750w" alt="" width="982" height="702" data-pin-no-hover="true" /><figcaption id="caption-attachment-666312" class="wp-caption-text"><span dir="auto">Source: ATTRAPI.</span></figcaption></figure>
<p><span dir="auto">ATTRAPI specified that the decision for this competition </span><strong><span dir="auto">will be announced on January 30th</span></strong><span dir="auto"> .</span></p>
<p><span dir="auto">He explained that the construction work will take place in the states of Coahuila and Nuevo León, and </span><strong><span dir="auto"> it is expected that the works will begin on February 10, 2026, with a duration of 749 calendar days</span></strong><span dir="auto"> .</span></p>
<p><span dir="auto">This project includes the engineering development and execution of the comprehensive executive project for the construction of the aforementioned stations, platforms and tracks in the laredos, layout, earthworks, complementary studies, among others.</span></p>
<p><span dir="auto">Comment and follow us on X:  </span><a href="https://twitter.com/evandeltoro"><span dir="auto">@evandeltoro</span></a><span dir="auto">  /  </span><a href="https://twitter.com/GrupoT21"><span dir="auto">@GrupoT21</span></a></p>
<p>El cargo <a href="https://t21.us/these-consortiums-are-raising-their-hands-to-build-4-stations-for-the-saltillo-nuevo-laredo-train/">These consortiums are raising their hands to build 4 stations for the Saltillo-Nuevo Laredo train</a> apareció primero en <a href="https://t21.us">T21</a>.</p>
]]></content:encoded>
					
		
		
			</item>
	</channel>
</rss>
