<?xml version="1.0" encoding="UTF-8"?><rss version="2.0"
	xmlns:content="http://purl.org/rss/1.0/modules/content/"
	xmlns:wfw="http://wellformedweb.org/CommentAPI/"
	xmlns:dc="http://purl.org/dc/elements/1.1/"
	xmlns:atom="http://www.w3.org/2005/Atom"
	xmlns:sy="http://purl.org/rss/1.0/modules/syndication/"
	xmlns:slash="http://purl.org/rss/1.0/modules/slash/"
	>

<channel>
	<title>COMSA INFRASTRUCTURE archivos - T21</title>
	<atom:link href="https://t21.us/tag/comsa-infrastructure/feed/" rel="self" type="application/rss+xml" />
	<link>https://t21.us/tag/comsa-infrastructure/</link>
	<description>The leading provider of news in the Transportation and Logistics Sector, including Air, Maritime, Land, and Railway, in Mexico and Latin America.</description>
	<lastBuildDate>Mon, 24 Aug 2026 23:07:55 +0000</lastBuildDate>
	<language>en-US</language>
	<sy:updatePeriod>
	hourly	</sy:updatePeriod>
	<sy:updateFrequency>
	1	</sy:updateFrequency>
	<generator>https://wordpress.org/?v=7.0.4</generator>

<image>
	<url>https://t21.us/wp-content/uploads/2024/04/cropped-t21-favicon-200-32x32-1.png</url>
	<title>COMSA INFRASTRUCTURE archivos - T21</title>
	<link>https://t21.us/tag/comsa-infrastructure/</link>
	<width>32</width>
	<height>32</height>
</image> 
	<item>
		<title>These companies show interest in section I of the Querétaro-Saltillo train</title>
		<link>https://t21.us/these-companies-show-interest-in-section-i-of-the-queretaro-saltillo-train/</link>
		
		<dc:creator><![CDATA[T21 Media]]></dc:creator>
		<pubDate>Mon, 24 Aug 2026 23:06:40 +0000</pubDate>
				<category><![CDATA[Railway]]></category>
		<category><![CDATA[ATTRAPI]]></category>
		<category><![CDATA[COMSA INFRASTRUCTURE]]></category>
		<category><![CDATA[MOTA-ENGIL MEXICO]]></category>
		<category><![CDATA[PASSENGER TRAIN]]></category>
		<category><![CDATA[QUERETARO-SALTILLO]]></category>
		<guid isPermaLink="false">https://t21.us/?p=637918</guid>

					<description><![CDATA[<p>The Agency for Trains and Integrated Public Transportation (ATTRAPI) reported that 10 companies have shown interest in the construction and design of 68 kilometers (km) of section I of the Querétaro-Saltillo passenger train, Querétaro-San Luis Potosí section, Querétaro-San Miguel de Allende subsection, chainage from km 0+000 to km 68+000. He also specified that the tender includes the [&#8230;]</p>
<p>El cargo <a href="https://t21.us/these-companies-show-interest-in-section-i-of-the-queretaro-saltillo-train/">These companies show interest in section I of the Querétaro-Saltillo train</a> apareció primero en <a href="https://t21.us">T21</a>.</p>
]]></description>
										<content:encoded><![CDATA[<p><img decoding="async" src="https://t21.com.mx/wp-content/uploads/2026/08/TREN-2.jpeg" /></p>
<p><span dir="auto">The </span><a href="https://www.gob.mx/attrapi/es"><span dir="auto">Agency for Trains and Integrated Public Transportation (ATTRAPI)</span></a><span dir="auto"> reported that 10 companies have shown interest in the construction and design of 68 kilometers (km) of section I of the Querétaro-Saltillo passenger train, Querétaro-San Luis Potosí section, Querétaro-San Miguel de Allende subsection, chainage from km 0+000 to km 68+000.</span></p>
<p><span dir="auto">He also specified that the tender includes the construction of viaducts, stations, tunnels, bridges, railway underpasses, railway overpasses, and pedestrian bridges.</span></p>
<p><span dir="auto">According to the documents, the representatives of </span><a href="https://www.grupo-gsa.com/"><span dir="auto">González Soto y Asociados</span></a><span dir="auto"> , </span><a href="https://www.comsa.com/"><span dir="auto">Comsa Infraestructura</span></a><span dir="auto"> , </span><a href="https://www.mota-engil.com/es/"><span dir="auto">Mota-Engil México</span></a><span dir="auto"> , </span><strong><span dir="auto">Omega Construcciones Industriales</span></strong><span dir="auto"> , </span><a href="https://grupoidinsa.com/"><span dir="auto">Impulsora de Desarrollo Integral</span></a><span dir="auto"> , </span><a href="https://www.ica.com.mx/"><span dir="auto">ICA Constructora</span></a><span dir="auto"> , </span><a href="https://daniferrotools.com/"><span dir="auto">DANIFERROTOOLS</span></a><span dir="auto"> , </span><strong><span dir="auto">Constructora Gallo Meda</span></strong><span dir="auto"> , </span><strong><span dir="auto">Calzada Construcciones</span></strong><span dir="auto"> and </span><a href="https://www.crecg.com/crecien/index/"><span dir="auto">China Railway International Group Co.</span></a><span dir="auto"> were present at the first clarification meeting .</span></p>
<p><span dir="auto">According to ATTRAPI, the tender includes the construction of a railway line, which </span><strong><span dir="auto">includes the necessary studies for the preparation and authorization of the executive project</span></strong><span dir="auto"> , and subsequently the development of the construction work will be carried out.</span></p>
<blockquote><p><span dir="auto">“The project is designed to operate at speeds of up to 177 kilometers per hour (km/h). Furthermore, its route has been carefully planned to minimize environmental and social impacts, making extensive use of existing rights-of-way and complying with the urban development regulations of each municipality,” he explained.</span></p></blockquote>
<p><strong><span dir="auto">The rail connection between Querétaro and San Luis Potosí will promote the attraction of investments</span></strong><span dir="auto"> in the commercial, industrial and social sectors, in addition to contributing to the reduction of travel times and the mitigation of polluting emissions.</span></p>
<p><span dir="auto">The agency specified that the estimated </span><strong><span dir="auto">start date for the work will be September 24th</span></strong><span dir="auto"> , with an execution period of 851 calendar days.</span></p>
<p><span dir="auto">It is worth remembering that ATTRAPI also launched the call for bids for the construction and design of 82 km of section II of the Querétaro-Saltillo train, Querétaro-San Luis Potosí section, San Miguel de Allende-Villa de Reyes subsection, chainage from km 68+000 to km 150+000.</span></p>
<p><span dir="auto">Comment and follow us on LinkedIn:  </span><a id="menurjdo" class="fui-Link ___1q1shib f2hkw1w f3rmtva f1ewtqcl fyind8e f1k6fduh f1w7gpdv fk6fouc fjoy568 figsok6 f1s184ao f1mk8lai fnbmjn9 f1o700av f13mvf36 f1cmlufx f9n3di6 f1ids18y f1tx3yz7 f1deo86v f1eh06m1 f1iescvh fhgqx19 f1olyrje f1p93eir f1nev41a f1h8hb77 f1lqvz6u f10aw75t fsle3fq f17ae5zn" title="https://www.linkedin.com/in/evangelina-del-toro-31b8104b/" href="https://www.linkedin.com/in/evangelina-del-toro-31b8104b/" target="_blank" rel="noreferrer noopener" aria-label="Link @Evangelina del Toro"><span dir="auto">@Evangelina del Toro</span></a><span dir="auto">  /  </span><a id="menurjdq" class="fui-Link ___1q1shib f2hkw1w f3rmtva f1ewtqcl fyind8e f1k6fduh f1w7gpdv fk6fouc fjoy568 figsok6 f1s184ao f1mk8lai fnbmjn9 f1o700av f13mvf36 f1cmlufx f9n3di6 f1ids18y f1tx3yz7 f1deo86v f1eh06m1 f1iescvh fhgqx19 f1olyrje f1p93eir f1nev41a f1h8hb77 f1lqvz6u f10aw75t fsle3fq f17ae5zn" title="https://www.linkedin.com/company/t21-grupo-comunicai-ny-medios/" href="https://www.linkedin.com/company/t21-grupo-comunicai-n-y-medios/" target="_blank" rel="noreferrer noopener" aria-label="Link @GrupoT21"><span dir="auto">@GrupoT21</span></a></p>
<p>El cargo <a href="https://t21.us/these-companies-show-interest-in-section-i-of-the-queretaro-saltillo-train/">These companies show interest in section I of the Querétaro-Saltillo train</a> apareció primero en <a href="https://t21.us">T21</a>.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>This consortium will build 4 stations on the Saltillo-Nuevo Laredo train line</title>
		<link>https://t21.us/this-consortium-will-build-4-stations-on-the-saltillo-nuevo-laredo-train-line/</link>
		
		<dc:creator><![CDATA[T21 Media]]></dc:creator>
		<pubDate>Tue, 21 Apr 2026 00:22:47 +0000</pubDate>
				<category><![CDATA[Railway]]></category>
		<category><![CDATA[ATTRAPI]]></category>
		<category><![CDATA[COMSA INFRASTRUCTURE]]></category>
		<category><![CDATA[PASSENGER TRAIN]]></category>
		<category><![CDATA[RAILWAY PROJECTS]]></category>
		<category><![CDATA[SALTILLO-NUEVO LAREDO TRAIN]]></category>
		<category><![CDATA[STATION CONSTRUCTION]]></category>
		<guid isPermaLink="false">https://t21.us/?p=635269</guid>

					<description><![CDATA[<p>The federal government awarded the consortium headed by Comsa Infraestructuras  a contract for 2,890,971,095.04 pesos for the construction and design of four stations of the  Saltillo-Nuevo Laredo passenger train . According to the tender award document, of the five proposals received by the Agency for Trains and Integrated Public Transport (ATTRAPI) , the winning bid was the only one that was solvent and [&#8230;]</p>
<p>El cargo <a href="https://t21.us/this-consortium-will-build-4-stations-on-the-saltillo-nuevo-laredo-train-line/">This consortium will build 4 stations on the Saltillo-Nuevo Laredo train line</a> apareció primero en <a href="https://t21.us">T21</a>.</p>
]]></description>
										<content:encoded><![CDATA[<p><img decoding="async" src="https://t21.com.mx/wp-content/uploads/2026/04/Sin-titulo-11.jpg" /></p>
<p><span dir="auto">The federal government awarded the consortium headed by </span><a href="https://www.comsa.com/"><span dir="auto">Comsa Infraestructuras</span></a><span dir="auto">  a contract for </span><strong><span dir="auto">2,890,971,095.04 pesos</span></strong><span dir="auto"> for the construction and design of four stations of the  </span><strong><span dir="auto">Saltillo-Nuevo Laredo passenger train</span></strong><span dir="auto"> .</span></p>
<p><span dir="auto">According to the tender award document, of the five proposals received by the </span><a href="https://www.gob.mx/attrapi"><span dir="auto">Agency for Trains and Integrated Public Transport (ATTRAPI)</span></a><span dir="auto"> , the winning bid was the only one that was solvent and met all the requested requirements.</span></p>
<p><span dir="auto">Comsa Infraestructura formed the consortium with Regiomontana de Construcción y Servicios, Comsa, and Vise. </span><strong><span dir="auto">Work will begin on April 27th</span></strong><span dir="auto"> , with a completion timeframe of 749 calendar days.</span></p>
<p><span dir="auto">The agency highlighted that the 2026 allocation for this project amounts to 1,116 million 688 thousand 100.40 pesos.</span></p>
<p><span dir="auto">The works encompass the construction and design of the  </span><strong><span dir="auto">Derramadero, Saltillo, Ramos Arizpe and García</span></strong><span dir="auto"> stations .</span></p>
<p><span dir="auto">Last February, ATTRAPI declared the bidding process for this project void, as it considered that none of the offers it received met all the requested technical and economic requirements.</span></p>
<p><strong><span dir="auto">The Saltillo-Nuevo Laredo train project involves the construction of a 396.3-kilometer (km) railway line,</span></strong><span dir="auto"> which will include a section of double track that is not electrified and will operate at a maximum speed of 200 kilometers per hour (km/h). It also includes the following stations and stops: Derramadero, Saltillo Centro, Ramos Arizpe, García, Las Torres, Salinas Victoria, Bustamante, Lampazos, Anáhuac, and Nuevo Laredo.</span></p>
<p><span dir="auto">It is worth remembering that </span><a href="https://recalglobal.com/"><span dir="auto">Recal Estructuras</span></a><span dir="auto"> , </span><a href="https://construccionesurales.mx/"><span dir="auto">Construcciones Urales</span></a><span dir="auto"> , Gami Ingeniería e Instalaciones, Azvi and Constructora Moyeda were the companies that won the construction and design of 8.854 km of this same project in segment 15 “A1”, Monterrey Metropolitan Area.</span></p>
<blockquote><p><span dir="auto">ATTRAPI also launched tenders for this project for the construction and design of the General Escobedo, Salinas Victoria, Villaldama, Lampazos de Naranjo, Anáhuac and Nuevo Laredo stations; the deadline for submitting proposals is May 12.</span></p></blockquote>
<p><span dir="auto">Also, on April 29th, the decision will be made for the tender for the construction and design of the Zica Derramadero railway auxiliary buildings, García Workshops and Garages, Las Torres inspection zone, Salinas Victoria maintenance base and Zica Nuevo Laredo.</span></p>
<p><span dir="auto">Meanwhile, the next April 24th will be for the construction and design of the railway systems, and the 21st of the same month for the construction and design of 9,204 km, segment 15 “A2”, Monterrey Metropolitan Area.</span></p>
<p><span dir="auto">Comment and follow us on LinkedIn:  </span><a href="https://www.linkedin.com/in/evangelina-del-toro-31b8104b/"><span dir="auto">@Evangelina del Toro</span></a><span dir="auto">  /  </span><a href="https://www.linkedin.com/company/t21-grupo-comunicai-n-y-medios/"><span dir="auto">@GrupoT21</span></a></p>
<div class="jeg_ad jeg_ad_article jnews_content_inline_2_ads  ">
<div class="ads-wrapper align-center "></div>
</div>
<p>El cargo <a href="https://t21.us/this-consortium-will-build-4-stations-on-the-saltillo-nuevo-laredo-train-line/">This consortium will build 4 stations on the Saltillo-Nuevo Laredo train line</a> apareció primero en <a href="https://t21.us">T21</a>.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>Bids submitted for third section of the Querétaro-Irapuato train</title>
		<link>https://t21.us/bids-submitted-for-third-section-of-the-queretaro-irapuato-train/</link>
		
		<dc:creator><![CDATA[T21 Media]]></dc:creator>
		<pubDate>Thu, 08 Jan 2026 19:54:22 +0000</pubDate>
				<category><![CDATA[FEATURED]]></category>
		<category><![CDATA[Railway]]></category>
		<category><![CDATA[ARTF]]></category>
		<category><![CDATA[COMSA INFRASTRUCTURE]]></category>
		<category><![CDATA[QUERETARO-IRAPUATO TRAIN]]></category>
		<category><![CDATA[RAILWAY PROJECTS]]></category>
		<guid isPermaLink="false">https://t21.us/?p=632911</guid>

					<description><![CDATA[<p>The Railway Transport Regulatory Agency (ARTF) announced that five consortia submitted bids for the construction and design of 1.2 kilometers (km) of section III of the Querétaro-Irapuato train, from km 107+000 to km 108+200 . This project also includes stations located in Apaseo El Grande, Celaya, Cortázar, Salamanca and Irapuato , as well as the rectification of the track area of [&#8230;]</p>
<p>El cargo <a href="https://t21.us/bids-submitted-for-third-section-of-the-queretaro-irapuato-train/">Bids submitted for third section of the Querétaro-Irapuato train</a> apareció primero en <a href="https://t21.us">T21</a>.</p>
]]></description>
										<content:encoded><![CDATA[<p><img decoding="async" src="https://t21.com.mx/wp-content/uploads/2025/07/Sin-titulo-11.jpg" /></p>
<p><span dir="auto">The </span><a href="https://www.gob.mx/artf"><span dir="auto">Railway Transport Regulatory Agency (ARTF)</span></a><span dir="auto"> announced that five consortia submitted bids for the construction and design of </span><strong><span dir="auto">1.2 kilometers (km) of section III of the Querétaro-Irapuato train, from km 107+000 to km 108+200</span></strong><span dir="auto"> .</span></p>
<p><span dir="auto">This project also </span><strong><span dir="auto">includes stations located in Apaseo El Grande, Celaya, Cortázar, Salamanca and Irapuato</span></strong><span dir="auto"> , as well as the rectification of the track area of ​​the existing passenger station in Irapuato and the reconfiguration of the freight yard until the effective operation of both.</span></p>
<p><span dir="auto">According to the bidding documents, the consortium made up of </span><a href="https://grupoidinsa.com/"><span dir="auto">Impulsora de Desarrollo Integral</span></a><span dir="auto"> , </span><a href="https://jaguaringenieros.mx/"><span dir="auto">Jaguar Ingenieros y Constructores</span></a><span dir="auto"> , Proacon México, Construcciones Aldesem, </span><a href="http://aldesa.com.mx/"><span dir="auto">Aldesa Construcciones</span></a><span dir="auto"> , Coalvi, Aldesa Construcciones Polska, China Civil Engineering and Construction Corporation </span><strong><span dir="auto">submitted the highest proposal, with five billion 331 million 449 thousand 916.80 pesos</span></strong><span dir="auto"> .</span></p>
<p><span dir="auto">Meanwhile, </span><strong><span dir="auto">Gami Ingeniería e Instalaciones</span></strong><span dir="auto"> , </span><a href="https://www.azvi.es/"><span dir="auto">Azvi</span></a><span dir="auto"> and </span><a href="https://construccionesurales.mx/"><span dir="auto">Construcciones Urales</span></a><span dir="auto"> proposed four billion 333 million 039 thousand 587.64 pesos.</span></p>
<p><strong><span dir="auto">Constructora de Proyectos Viales</span></strong><span dir="auto"> , </span><a href="https://www.ohla-group.com/"><span dir="auto">Obrascon Huarte Lain</span></a><span dir="auto"> and </span><a href="https://www.grupocaabsa.com/"><span dir="auto">Caabsa</span></a><span dir="auto"> submitted a proposal for four billion 257 million 351 thousand 054.91 pesos.</span></p>
<p><span dir="auto">For their part, </span><strong><span dir="auto">La Peninsular Compañía Constructora</span></strong><span dir="auto"> , </span><a href="https://www.grupo-sef.com/"><span dir="auto">Construcciones y Maquinaria SEF</span></a><span dir="auto"> , </span><a href="https://alcancetotal.com/"><span dir="auto">Alcance Total</span></a><span dir="auto"> , Proveedora de Materiales del Norte and Constructora Milos had an offer of three billion 707 million 728 thousand 516.27 pesos.</span></p>
<p><span dir="auto">Meanwhile, the lowest proposal was from </span><a href="https://www.comsa.com/"><span dir="auto">Comsa </span></a> <a href="https://www.comsa.com/"><span dir="auto">Infraestructuras</span></a><span dir="auto"> , Comsa, Regiomontana de Construcción y Servicios, and Vise with three billion 411 million 823 thousand 240.22 pesos.</span></p>
<p><span dir="auto">ARTF specified that the decision regarding the bidding process is scheduled for </span><strong><span dir="auto">January 12th</span></strong><span dir="auto"> . The deadline for completing the work will be 871 calendar days.</span></p>
<p><span dir="auto">The agency has a budget allocation for this project of 2,410,624,309.87 pesos for 2026.</span></p>
<p><span dir="auto">Comment and follow us on X:  </span><a href="https://twitter.com/evandeltoro"><span dir="auto">@evandeltoro</span></a><span dir="auto">  /  </span><a href="https://twitter.com/GrupoT21"><span dir="auto">@GrupoT21</span></a></p>
<p>El cargo <a href="https://t21.us/bids-submitted-for-third-section-of-the-queretaro-irapuato-train/">Bids submitted for third section of the Querétaro-Irapuato train</a> apareció primero en <a href="https://t21.us">T21</a>.</p>
]]></content:encoded>
					
		
		
			</item>
	</channel>
</rss>
