<?xml version="1.0" encoding="UTF-8"?><rss version="2.0"
	xmlns:content="http://purl.org/rss/1.0/modules/content/"
	xmlns:wfw="http://wellformedweb.org/CommentAPI/"
	xmlns:dc="http://purl.org/dc/elements/1.1/"
	xmlns:atom="http://www.w3.org/2005/Atom"
	xmlns:sy="http://purl.org/rss/1.0/modules/syndication/"
	xmlns:slash="http://purl.org/rss/1.0/modules/slash/"
	>

<channel>
	<title>BRIDGE OF NUEVO LAREDO archivos - T21</title>
	<atom:link href="https://t21.us/tag/bridge-of-nuevo-laredo/feed/" rel="self" type="application/rss+xml" />
	<link>https://t21.us/tag/bridge-of-nuevo-laredo/</link>
	<description>The leading provider of news in the Transportation and Logistics Sector, including Air, Maritime, Land, and Railway, in Mexico and Latin America.</description>
	<lastBuildDate>Fri, 27 Nov 2026 17:55:57 +0000</lastBuildDate>
	<language>en-US</language>
	<sy:updatePeriod>
	hourly	</sy:updatePeriod>
	<sy:updateFrequency>
	1	</sy:updateFrequency>
	<generator>https://wordpress.org/?v=7.0.9</generator>

<image>
	<url>https://t21.us/wp-content/uploads/2024/04/cropped-t21-favicon-200-32x32-1.png</url>
	<title>BRIDGE OF NUEVO LAREDO archivos - T21</title>
	<link>https://t21.us/tag/bridge-of-nuevo-laredo/</link>
	<width>32</width>
	<height>32</height>
</image> 
	<item>
		<title>The expansion of the Nuevo Laredo International Bridge will have a capacity of up to 20,000 trucks.</title>
		<link>https://t21.us/the-expansion-of-the-nuevo-laredo-international-bridge-will-have-a-capacity-of-up-to-20000-trucks/</link>
		
		<dc:creator><![CDATA[T21 Media]]></dc:creator>
		<pubDate>Thu, 26 Nov 2026 17:55:39 +0000</pubDate>
				<category><![CDATA[Logistics]]></category>
		<category><![CDATA[BRIDGE OF NUEVO LAREDO]]></category>
		<category><![CDATA[freight transport]]></category>
		<category><![CDATA[LOGISTICS INFRASTRUCTURE]]></category>
		<category><![CDATA[NATIONAL INFRASTRUCUTE CONGRESS TAMAULIPAS 2026]]></category>
		<category><![CDATA[TECHNOLOGICAL MODERNIZATION]]></category>
		<guid isPermaLink="false">https://t21.us/?p=639873</guid>

					<description><![CDATA[<p>CIUDAD VICTORIA, TAMPS.- To resolve the saturation of border crossings and face the growth of trade between Mexico and the United States, the expansion of the Nuevo Laredo International Bridge will be carried out , a project that contemplates an investment, in a first stage, of 500 million pesos. Pedro Cepeda Anaya, head of the [&#8230;]</p>
<p>El cargo <a href="https://t21.us/the-expansion-of-the-nuevo-laredo-international-bridge-will-have-a-capacity-of-up-to-20000-trucks/">The expansion of the Nuevo Laredo International Bridge will have a capacity of up to 20,000 trucks.</a> apareció primero en <a href="https://t21.us">T21</a>.</p>
]]></description>
										<content:encoded><![CDATA[<p><img decoding="async" src="https://t21.com.mx/wp-content/uploads/2026/11/TAMPS1.jpg" /></p>
<p><span dir="auto">CIUDAD VICTORIA, TAMPS.- To resolve the saturation of border crossings and face the growth of trade between Mexico and the United States, the </span><strong><span dir="auto">expansion of the Nuevo Laredo International Bridge</span></strong><span dir="auto"> will be carried out , a project that contemplates an investment, in a first stage, of 500 million pesos.</span></p>
<p><span dir="auto">Pedro Cepeda Anaya, head of the </span><a href="https://tamaulipas.gob.mx/obraspublicas/"><span dir="auto">Public Works Secretariat of Tamaulipas</span></a><span dir="auto"> , specified that the works will allow an increase in capacity to up to </span><strong><span dir="auto">20,000 heavy vehicles</span></strong><span dir="auto"> , since it will go from eight to 18 lanes.</span></p>
<blockquote><p><span dir="auto">“On a daily basis, approximately 14,000 to 16,000 cargo vehicles cross the border between Mexico and the United States. This will make the process much more efficient, and cargo volume will certainly increase through the Port of Laredo III. This will significantly improve traffic flow. We expect to reach around 18,000 vehicles, and once both terminals are operational, 20,000,” he explained.</span></p></blockquote>
<p><span dir="auto">In an interview during the </span><strong><span dir="auto">Tamaulipas 2026 National Infrastructure Congress</span></strong><span dir="auto"> , he explained that the investment only corresponds to the Mexican side, and specified that they already have the executive project, while the contracts will be awarded in different bidding stages, so the start of the work is planned between December 2026 and January 2027.</span></p>
<p><span dir="auto">According to the state official, the expansion will take place after the state government obtained a 30-year extension of the bridge concession, following a negotiation process of approximately two years with authorities.</span></p>
<p><span dir="auto">Currently, the intersection has eight lanes, so the infrastructure will operate in parallel with another eight lanes, while the existing one will be expanded to 10, which will allow </span><strong><span dir="auto">an increase in traffic capacity for freight transport</span></strong><span dir="auto"> .</span></p>
<p><span dir="auto">The project, he indicated, also includes a </span><strong><span dir="auto">technological modernization</span></strong><span dir="auto"> , and the State Finance Secretariat will participate in equipping the facilities and the systems corresponding to the operation and administration of the bridge, while the Federation will have responsibilities in the components under its jurisdiction.</span></p>
<blockquote><p><span dir="auto">Construction on the Mexican side is expected to take seven to eight months; however, the overall completion will also depend on the work carried out by the United States in the Texas area, where construction is expected to begin between March and April 2027.</span></p></blockquote>
<p><span dir="auto">Regarding railway matters, Cepeda Anaya said that the state government has completed </span><strong><span dir="auto">100% of the release of rights-of-way</span></strong><span dir="auto"> that correspond to it for passenger train projects in the Nuevo Laredo region, as part of the coordination with the Federal Government.</span></p>
<p><span dir="auto">The official also noted that </span><strong><span dir="auto">Tamaulipas will accumulate approximately 27 billion pesos in state public works</span></strong><span dir="auto"> by the end of 2026, compared to the 21.106 billion pesos previously reported.</span></p>
<blockquote><p><span dir="auto">Among the projects that will contribute to the growth of investment are the Laredo and Magueyes bridges, the El Mante bypass and the Tampico-Altamira viaduct.</span></p></blockquote>
<p><span dir="auto">He noted that the state administration aims to reach approximately 35 billion pesos in accumulated public works by the end of September 2028, which would represent an increase compared to the 22.5 billion pesos executed during the previous administration.</span></p>
<p><span dir="auto">Comment and follow us on LinkedIn:  </span><a href="https://www.linkedin.com/in/evangelina-del-toro-31b8104b/"><span dir="auto">@Evangelina del Toro</span></a><span dir="auto"> /  </span><a href="https://www.linkedin.com/company/t21-grupo-comunicai-n-y-medios/"><span dir="auto">@GrupoT21</span></a></p>
<p>El cargo <a href="https://t21.us/the-expansion-of-the-nuevo-laredo-international-bridge-will-have-a-capacity-of-up-to-20000-trucks/">The expansion of the Nuevo Laredo International Bridge will have a capacity of up to 20,000 trucks.</a> apareció primero en <a href="https://t21.us">T21</a>.</p>
]]></content:encoded>
					
		
		
			</item>
	</channel>
</rss>
