<?xml version="1.0" encoding="UTF-8"?><rss version="2.0"
	xmlns:content="http://purl.org/rss/1.0/modules/content/"
	xmlns:wfw="http://wellformedweb.org/CommentAPI/"
	xmlns:dc="http://purl.org/dc/elements/1.1/"
	xmlns:atom="http://www.w3.org/2005/Atom"
	xmlns:sy="http://purl.org/rss/1.0/modules/syndication/"
	xmlns:slash="http://purl.org/rss/1.0/modules/slash/"
	>

<channel>
	<title>ATTRAPI archivos - T21</title>
	<atom:link href="https://t21.us/tag/attrapi/feed/" rel="self" type="application/rss+xml" />
	<link>https://t21.us/tag/attrapi/</link>
	<description>The leading provider of news in the Transportation and Logistics Sector, including Air, Maritime, Land, and Railway, in Mexico and Latin America.</description>
	<lastBuildDate>Wed, 16 Sep 2026 00:00:47 +0000</lastBuildDate>
	<language>en-US</language>
	<sy:updatePeriod>
	hourly	</sy:updatePeriod>
	<sy:updateFrequency>
	1	</sy:updateFrequency>
	<generator>https://wordpress.org/?v=7.0.6</generator>

<image>
	<url>https://t21.us/wp-content/uploads/2024/04/cropped-t21-favicon-200-32x32-1.png</url>
	<title>ATTRAPI archivos - T21</title>
	<link>https://t21.us/tag/attrapi/</link>
	<width>32</width>
	<height>32</height>
</image> 
	<item>
		<title>Ferromex train derails in Coahuila logistics corridor</title>
		<link>https://t21.us/ferromex-train-derails-in-coahuila-logistics-corridor/</link>
		
		<dc:creator><![CDATA[T21 Media]]></dc:creator>
		<pubDate>Wed, 16 Sep 2026 00:00:47 +0000</pubDate>
				<category><![CDATA[Railway]]></category>
		<category><![CDATA[ATTRAPI]]></category>
		<category><![CDATA[Coahuila]]></category>
		<category><![CDATA[DERAILMENT]]></category>
		<category><![CDATA[Ferromex]]></category>
		<guid isPermaLink="false">https://t21.us/?p=638311</guid>

					<description><![CDATA[<p>More than 80 cars of a Ferromex freight train derailed near Estación Marte , in the municipality of General Cepeda, Coahuila, where railway personnel are already working to restart operations as soon as possible. According to reports from the state government, strong gusts of wind were recorded in the area ; however, neither the company nor local authorities have yet [&#8230;]</p>
<p>El cargo <a href="https://t21.us/ferromex-train-derails-in-coahuila-logistics-corridor/">Ferromex train derails in Coahuila logistics corridor</a> apareció primero en <a href="https://t21.us">T21</a>.</p>
]]></description>
										<content:encoded><![CDATA[<p><img decoding="async" src="https://t21.com.mx/wp-content/uploads/2026/09/Sin-titulo-6.jpg" /></p>
<p><strong><a href="https://ferromex.mx/"><span dir="auto">More than 80 cars of a Ferromex</span></a><span dir="auto"> freight train derailed near Estación Marte</span></strong><span dir="auto"> , in the municipality of General Cepeda, Coahuila, where railway personnel are already working to restart operations as soon as possible.</span></p>
<p><span dir="auto">According to reports from the state government, </span><strong><span dir="auto">strong gusts of wind were recorded in the area</span></strong><span dir="auto"> ; however, neither the company nor local authorities have yet reported on the possible causes of the accident, which occurred around 3:00 p.m. on September 13.</span></p>
<p><strong><span dir="auto">Ferromex personnel traveled to the site to begin the maneuvers to remove the affected units</span></strong><span dir="auto"> and carry out the necessary work to clear and rehabilitate the railway line.</span></p>
<p><span dir="auto">The point where the derailment occurred </span><strong><span dir="auto">is part of the rail connection between Saltillo and Torreón</span></strong><span dir="auto"> , a corridor that crosses south-central Coahuila and is integrated into the national rail network.</span></p>
<p><span dir="auto">The area is logistically important due to its proximity to the main industrial centers in the southeast of the state, particularly Saltillo and Ramos Arizpe, where significant manufacturing activity is concentrated. From this corridor, the rail network connects to other strategic points in the country and provides links to the United States.</span></p>
<p><span dir="auto">Ferromex also has an extensive network that connects industrial and logistics centers with border crossings such as Piedras Negras, Ciudad Juárez, Nogales and Mexicali, as well as with corridors that lead to ports on the Pacific and the Gulf of Mexico.</span></p>
<blockquote><p><span dir="auto">In that context, the accident that occurred at Estación Marte not only represents a local impact on rail traffic, but may also have repercussions on a route used for the movement of goods between industrial zones, distribution centers, borders and port terminals.</span></p></blockquote>
<p><span dir="auto">So far, no official information has been released regarding the origin, destination, or type of cargo of the train involved in the derailment.</span></p>
<p><span dir="auto">The most recent data from the </span><a href="https://www.gob.mx/attrapi"><span dir="auto">Agency for Trains and Integrated Public Transport (ATTRAPI)</span></a><span dir="auto"> indicates that up to the first quarter of 2026, 20 derailment reports were registered, representing a decrease of 60.7% compared to the same period last year.</span></p>
<figure id="attachment_682758" class="wp-caption aligncenter" aria-describedby="caption-attachment-682758"><img fetchpriority="high" decoding="async" class="wp-image-682758 size-full" src="https://t21.com.mx/wp-content/uploads/2026/09/Captura-de-pantalla-2026-09-15-095724.png" sizes="(max-width: 1397px) 100vw, 1397px" srcset="https://t21.com.mx/wp-content/uploads/2026/09/Captura-de-pantalla-2026-09-15-095724.png 1397w, https://t21.com.mx/wp-content/uploads/2026/09/Captura-de-pantalla-2026-09-15-095724-300x132.png 300w, https://t21.com.mx/wp-content/uploads/2026/09/Captura-de-pantalla-2026-09-15-095724-1024x451.png 1024w, https://t21.com.mx/wp-content/uploads/2026/09/Captura-de-pantalla-2026-09-15-095724-768x338.png 768w, https://t21.com.mx/wp-content/uploads/2026/09/Captura-de-pantalla-2026-09-15-095724-600x264.png 600w, https://t21.com.mx/wp-content/uploads/2026/09/Captura-de-pantalla-2026-09-15-095724-150x66.png 150w, https://t21.com.mx/wp-content/uploads/2026/09/Captura-de-pantalla-2026-09-15-095724-750x330.png 750w, https://t21.com.mx/wp-content/uploads/2026/09/Captura-de-pantalla-2026-09-15-095724-1140x502.png 1140w" alt="" width="1397" height="615" data-pin-no-hover="true" /><figcaption id="caption-attachment-682758" class="wp-caption-text"><span dir="auto">Source: ATTRAPI.</span></figcaption></figure>
<p><em><span dir="auto">Main image taken from social media.</span></em></p>
<p><span dir="auto">Comment and follow us on LinkedIn:  </span><a id="menurjdq" class="fui-Link ___1q1shib f2hkw1w f3rmtva f1ewtqcl fyind8e f1k6fduh f1w7gpdv fk6fouc fjoy568 figsok6 f1s184ao f1mk8lai fnbmjn9 f1o700av f13mvf36 f1cmlufx f9n3di6 f1ids18y f1tx3yz7 f1deo86v f1eh06m1 f1iescvh fhgqx19 f1olyrje f1p93eir f1nev41a f1h8hb77 f1lqvz6u f10aw75t fsle3fq f17ae5zn" title="https://www.linkedin.com/company/t21-grupo-comunicai-ny-medios/" href="https://www.linkedin.com/company/t21-grupo-comunicai-n-y-medios/" target="_blank" rel="noreferrer noopener" aria-label="Link @GrupoT21"><span dir="auto">@GrupoT21</span></a></p>
<p>El cargo <a href="https://t21.us/ferromex-train-derails-in-coahuila-logistics-corridor/">Ferromex train derails in Coahuila logistics corridor</a> apareció primero en <a href="https://t21.us">T21</a>.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>These companies show interest in section I of the Querétaro-Saltillo train</title>
		<link>https://t21.us/these-companies-show-interest-in-section-i-of-the-queretaro-saltillo-train/</link>
		
		<dc:creator><![CDATA[T21 Media]]></dc:creator>
		<pubDate>Mon, 24 Aug 2026 23:06:40 +0000</pubDate>
				<category><![CDATA[Railway]]></category>
		<category><![CDATA[ATTRAPI]]></category>
		<category><![CDATA[COMSA INFRASTRUCTURE]]></category>
		<category><![CDATA[MOTA-ENGIL MEXICO]]></category>
		<category><![CDATA[PASSENGER TRAIN]]></category>
		<category><![CDATA[QUERETARO-SALTILLO]]></category>
		<guid isPermaLink="false">https://t21.us/?p=637918</guid>

					<description><![CDATA[<p>The Agency for Trains and Integrated Public Transportation (ATTRAPI) reported that 10 companies have shown interest in the construction and design of 68 kilometers (km) of section I of the Querétaro-Saltillo passenger train, Querétaro-San Luis Potosí section, Querétaro-San Miguel de Allende subsection, chainage from km 0+000 to km 68+000. He also specified that the tender includes the [&#8230;]</p>
<p>El cargo <a href="https://t21.us/these-companies-show-interest-in-section-i-of-the-queretaro-saltillo-train/">These companies show interest in section I of the Querétaro-Saltillo train</a> apareció primero en <a href="https://t21.us">T21</a>.</p>
]]></description>
										<content:encoded><![CDATA[<p><img decoding="async" src="https://t21.com.mx/wp-content/uploads/2026/08/TREN-2.jpeg" /></p>
<p><span dir="auto">The </span><a href="https://www.gob.mx/attrapi/es"><span dir="auto">Agency for Trains and Integrated Public Transportation (ATTRAPI)</span></a><span dir="auto"> reported that 10 companies have shown interest in the construction and design of 68 kilometers (km) of section I of the Querétaro-Saltillo passenger train, Querétaro-San Luis Potosí section, Querétaro-San Miguel de Allende subsection, chainage from km 0+000 to km 68+000.</span></p>
<p><span dir="auto">He also specified that the tender includes the construction of viaducts, stations, tunnels, bridges, railway underpasses, railway overpasses, and pedestrian bridges.</span></p>
<p><span dir="auto">According to the documents, the representatives of </span><a href="https://www.grupo-gsa.com/"><span dir="auto">González Soto y Asociados</span></a><span dir="auto"> , </span><a href="https://www.comsa.com/"><span dir="auto">Comsa Infraestructura</span></a><span dir="auto"> , </span><a href="https://www.mota-engil.com/es/"><span dir="auto">Mota-Engil México</span></a><span dir="auto"> , </span><strong><span dir="auto">Omega Construcciones Industriales</span></strong><span dir="auto"> , </span><a href="https://grupoidinsa.com/"><span dir="auto">Impulsora de Desarrollo Integral</span></a><span dir="auto"> , </span><a href="https://www.ica.com.mx/"><span dir="auto">ICA Constructora</span></a><span dir="auto"> , </span><a href="https://daniferrotools.com/"><span dir="auto">DANIFERROTOOLS</span></a><span dir="auto"> , </span><strong><span dir="auto">Constructora Gallo Meda</span></strong><span dir="auto"> , </span><strong><span dir="auto">Calzada Construcciones</span></strong><span dir="auto"> and </span><a href="https://www.crecg.com/crecien/index/"><span dir="auto">China Railway International Group Co.</span></a><span dir="auto"> were present at the first clarification meeting .</span></p>
<p><span dir="auto">According to ATTRAPI, the tender includes the construction of a railway line, which </span><strong><span dir="auto">includes the necessary studies for the preparation and authorization of the executive project</span></strong><span dir="auto"> , and subsequently the development of the construction work will be carried out.</span></p>
<blockquote><p><span dir="auto">“The project is designed to operate at speeds of up to 177 kilometers per hour (km/h). Furthermore, its route has been carefully planned to minimize environmental and social impacts, making extensive use of existing rights-of-way and complying with the urban development regulations of each municipality,” he explained.</span></p></blockquote>
<p><strong><span dir="auto">The rail connection between Querétaro and San Luis Potosí will promote the attraction of investments</span></strong><span dir="auto"> in the commercial, industrial and social sectors, in addition to contributing to the reduction of travel times and the mitigation of polluting emissions.</span></p>
<p><span dir="auto">The agency specified that the estimated </span><strong><span dir="auto">start date for the work will be September 24th</span></strong><span dir="auto"> , with an execution period of 851 calendar days.</span></p>
<p><span dir="auto">It is worth remembering that ATTRAPI also launched the call for bids for the construction and design of 82 km of section II of the Querétaro-Saltillo train, Querétaro-San Luis Potosí section, San Miguel de Allende-Villa de Reyes subsection, chainage from km 68+000 to km 150+000.</span></p>
<p><span dir="auto">Comment and follow us on LinkedIn:  </span><a id="menurjdo" class="fui-Link ___1q1shib f2hkw1w f3rmtva f1ewtqcl fyind8e f1k6fduh f1w7gpdv fk6fouc fjoy568 figsok6 f1s184ao f1mk8lai fnbmjn9 f1o700av f13mvf36 f1cmlufx f9n3di6 f1ids18y f1tx3yz7 f1deo86v f1eh06m1 f1iescvh fhgqx19 f1olyrje f1p93eir f1nev41a f1h8hb77 f1lqvz6u f10aw75t fsle3fq f17ae5zn" title="https://www.linkedin.com/in/evangelina-del-toro-31b8104b/" href="https://www.linkedin.com/in/evangelina-del-toro-31b8104b/" target="_blank" rel="noreferrer noopener" aria-label="Link @Evangelina del Toro"><span dir="auto">@Evangelina del Toro</span></a><span dir="auto">  /  </span><a id="menurjdq" class="fui-Link ___1q1shib f2hkw1w f3rmtva f1ewtqcl fyind8e f1k6fduh f1w7gpdv fk6fouc fjoy568 figsok6 f1s184ao f1mk8lai fnbmjn9 f1o700av f13mvf36 f1cmlufx f9n3di6 f1ids18y f1tx3yz7 f1deo86v f1eh06m1 f1iescvh fhgqx19 f1olyrje f1p93eir f1nev41a f1h8hb77 f1lqvz6u f10aw75t fsle3fq f17ae5zn" title="https://www.linkedin.com/company/t21-grupo-comunicai-ny-medios/" href="https://www.linkedin.com/company/t21-grupo-comunicai-n-y-medios/" target="_blank" rel="noreferrer noopener" aria-label="Link @GrupoT21"><span dir="auto">@GrupoT21</span></a></p>
<p>El cargo <a href="https://t21.us/these-companies-show-interest-in-section-i-of-the-queretaro-saltillo-train/">These companies show interest in section I of the Querétaro-Saltillo train</a> apareció primero en <a href="https://t21.us">T21</a>.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>ATTRAPI launches tender for section II of the Querétaro-Saltillo train</title>
		<link>https://t21.us/attrapi-launches-tender-for-section-ii-of-the-queretaro-saltillo-train/</link>
		
		<dc:creator><![CDATA[T21 Media]]></dc:creator>
		<pubDate>Tue, 11 Aug 2026 22:48:07 +0000</pubDate>
				<category><![CDATA[FEATURED]]></category>
		<category><![CDATA[Railway]]></category>
		<category><![CDATA[ATTRAPI]]></category>
		<category><![CDATA[CONSTRUCTION]]></category>
		<category><![CDATA[RAILWAY]]></category>
		<category><![CDATA[RAILWAY PROJECTS]]></category>
		<guid isPermaLink="false">https://t21.us/?p=637612</guid>

					<description><![CDATA[<p>The Agency for Trains and Integrated Public Transport (ATTRAPI) launched the call for bids for the construction and design of 82 kilometers (km) of section II of the Querétaro-Saltillo train , Querétaro-San Luis Potosí section, San Miguel de Allende-Villa de Reyes subsection, chainage from km 68+000 to km 150+000. According to the document, representatives from Holcim Mexico Operations , Calzada [&#8230;]</p>
<p>El cargo <a href="https://t21.us/attrapi-launches-tender-for-section-ii-of-the-queretaro-saltillo-train/">ATTRAPI launches tender for section II of the Querétaro-Saltillo train</a> apareció primero en <a href="https://t21.us">T21</a>.</p>
]]></description>
										<content:encoded><![CDATA[<p><img decoding="async" src="https://t21.com.mx/wp-content/uploads/2026/08/ATTRAPI.jpg" /></p>
<p><strong><span dir="auto">The </span><a href="https://www.gob.mx/attrapi"><span dir="auto">Agency for Trains and Integrated Public Transport (ATTRAPI)</span></a><span dir="auto"> launched the call for bids for the construction and design of 82 kilometers (km) of section II of the Querétaro-Saltillo train</span></strong><span dir="auto"> , Querétaro-San Luis Potosí section, San Miguel de Allende-Villa de Reyes subsection, chainage from km 68+000 to km 150+000.</span></p>
<p><span dir="auto">According to the document, representatives from </span><a href="https://www.holcim.com.mx/"><span dir="auto">Holcim Mexico Operations</span></a><span dir="auto"> , Calzada Construcciones, </span><a href="https://www.ica.com.mx/"><span dir="auto">ICA Constructora</span></a><span dir="auto"> , </span><a href="https://www.vise.com.mx/"><span dir="auto">VISE</span></a><span dir="auto"> , and </span><a href="https://www.gpconstruccion.com.mx/"><span dir="auto">GP Construcción</span></a><span dir="auto"> were present during the first working visit .</span></p>
<p><span dir="auto">In addition to </span><a href="https://espanol.ccccltd.cn/"><span dir="auto">China Communications Construction Company Mexico</span></a><span dir="auto"> , Regiomontana de Construcción y Servicios, and Proveedora de Materiales del Norte.</span></p>
<p><strong><span dir="auto">The tender includes the construction of viaducts, tunnels, bridges, railway underpasses, railway overpasses and pedestrian bridges in Guanajuato</span></strong><span dir="auto"> , with the purpose of connecting the cities of Querétaro and San Miguel de Allende.</span></p>
<p><span dir="auto">The agency specified that the first and second clarification meetings will be on October 13 and 31, respectively, while the submission of bids will be on October 2, and the decision will be announced on the same day.</span></p>
<p><span dir="auto">According to ATTRAPI, the work will begin on November 2, 2026, with </span><strong><span dir="auto">a completion time of 1,003 calendar days</span></strong><span dir="auto"> .</span></p>
<p><span data-teams="true"><span dir="auto">Comment and follow us on LinkedIn:  </span><a id="menurjdo" class="fui-Link ___1q1shib f2hkw1w f3rmtva f1ewtqcl fyind8e f1k6fduh f1w7gpdv fk6fouc fjoy568 figsok6 f1s184ao f1mk8lai fnbmjn9 f1o700av f13mvf36 f1cmlufx f9n3di6 f1ids18y f1tx3yz7 f1deo86v f1eh06m1 f1iescvh fhgqx19 f1olyrje f1p93eir f1nev41a f1h8hb77 f1lqvz6u f10aw75t fsle3fq f17ae5zn" title="https://www.linkedin.com/in/evangelina-del-toro-31b8104b/" href="https://www.linkedin.com/in/evangelina-del-toro-31b8104b/" target="_blank" rel="noreferrer noopener" aria-label="Link @Evangelina del Toro"><span dir="auto">@Evangelina del Toro</span></a><span dir="auto">  /  </span><a id="menurjdq" class="fui-Link ___1q1shib f2hkw1w f3rmtva f1ewtqcl fyind8e f1k6fduh f1w7gpdv fk6fouc fjoy568 figsok6 f1s184ao f1mk8lai fnbmjn9 f1o700av f13mvf36 f1cmlufx f9n3di6 f1ids18y f1tx3yz7 f1deo86v f1eh06m1 f1iescvh fhgqx19 f1olyrje f1p93eir f1nev41a f1h8hb77 f1lqvz6u f10aw75t fsle3fq f17ae5zn" title="https://www.linkedin.com/company/t21-grupo-comunicai-ny-medios/" href="https://www.linkedin.com/company/t21-grupo-comunicai-n-y-medios/" target="_blank" rel="noreferrer noopener" aria-label="Link @GrupoT21"><span dir="auto">@GrupoT21</span></a></span></p>
<p>El cargo <a href="https://t21.us/attrapi-launches-tender-for-section-ii-of-the-queretaro-saltillo-train/">ATTRAPI launches tender for section II of the Querétaro-Saltillo train</a> apareció primero en <a href="https://t21.us">T21</a>.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>Second phase of passenger train construction begins in Mexico</title>
		<link>https://t21.us/second-phase-of-passenger-train-construction-begins-in-mexico/</link>
		
		<dc:creator><![CDATA[T21 Media]]></dc:creator>
		<pubDate>Thu, 16 Jul 2026 23:56:53 +0000</pubDate>
				<category><![CDATA[FEATURED]]></category>
		<category><![CDATA[Railway]]></category>
		<category><![CDATA[ATTRAPI]]></category>
		<category><![CDATA[CONSTRUCTION]]></category>
		<category><![CDATA[MEXICAN ASSOCIATION OF HIGH ENGINEERING]]></category>
		<category><![CDATA[PASSENGER TRAINS]]></category>
		<category><![CDATA[RAILWAY PROJECTS]]></category>
		<guid isPermaLink="false">https://t21.us/?p=637075</guid>

					<description><![CDATA[<p>The Mexican government has started the second stage of passenger train construction, whose works and tenders will be in charge of the Ministry of National Defense (Defensa) and the Agency of Trains and Integrated Public Transport (ATTRAPI) . “We finished all the technical studies, basic engineering and demand studies and the Felipe Ángeles Engineering Group will execute the Irapuato-León, [&#8230;]</p>
<p>El cargo <a href="https://t21.us/second-phase-of-passenger-train-construction-begins-in-mexico/">Second phase of passenger train construction begins in Mexico</a> apareció primero en <a href="https://t21.us">T21</a>.</p>
]]></description>
										<content:encoded><![CDATA[<p><img decoding="async" src="https://t21.com.mx/wp-content/uploads/2026/07/Sin-titulo-10.jpg" /></p>
<p><span dir="auto">The Mexican government has started the second stage of passenger train construction, whose works and tenders will be in charge of the </span><a href="https://www.gob.mx/defensa/es/"><span dir="auto">Ministry of National Defense (Defensa)</span></a><span dir="auto"> and the </span><a href="https://www.gob.mx/attrapi/es"><span dir="auto">Agency of Trains and Integrated Public Transport (ATTRAPI)</span></a><span dir="auto"> .</span></p>
<blockquote><p><span dir="auto">“We finished all the technical studies, basic engineering and demand studies and the Felipe Ángeles Engineering Group will execute the Irapuato-León, León-Guadalajara and we have already launched the international public tender because we want more participation and more bids for the first section that goes from Querétaro to San Miguel de Allende, which is the Querétaro-San Luis Potosí,” said Efraín Deschamps Gutiérrez de Velasco, director of Works at ATTRAPI.</span></p></blockquote>
<figure id="attachment_678828" class="wp-caption aligncenter" aria-describedby="caption-attachment-678828"><img decoding="async" class="wp-image-678828 size-full" src="https://t21.com.mx/wp-content/uploads/2026/07/trenes-3.png" sizes="(max-width: 1047px) 100vw, 1047px" srcset="https://t21.com.mx/wp-content/uploads/2026/07/trenes-3.png 1047w, https://t21.com.mx/wp-content/uploads/2026/07/trenes-3-300x168.png 300w, https://t21.com.mx/wp-content/uploads/2026/07/trenes-3-1024x574.png 1024w, https://t21.com.mx/wp-content/uploads/2026/07/trenes-3-768x431.png 768w, https://t21.com.mx/wp-content/uploads/2026/07/trenes-3-600x336.png 600w, https://t21.com.mx/wp-content/uploads/2026/07/trenes-3-150x84.png 150w, https://t21.com.mx/wp-content/uploads/2026/07/trenes-3-750x420.png 750w" alt="" width="1047" height="587" data-pin-no-hover="true" /><figcaption id="caption-attachment-678828" class="wp-caption-text"><span dir="auto">Source: ATTRAPI.</span></figcaption></figure>
<p><span dir="auto">He announced that next Monday they will launch the bidding process for the San Luis Potosí to Saltillo section, while they continue with the demand and pre-investment studies and basic engineering for the Mazatlán-Los Mochis section, although he clarified that he does not yet have an authorized start date.</span></p>
<p><span dir="auto">During his participation in the </span><strong><span dir="auto">XXV National Meeting of Land Transportation</span></strong><span dir="auto"> , organized by the </span><a href="https://amivtac.org/"><span dir="auto">Mexican Association of Land Transportation Engineering (AMIVTAC)</span></a><span dir="auto"> which is taking place in Morelia, Michoacán, he reiterated that for these sections there will only be dedicated lanes, so &#8221; </span><strong><span dir="auto">there will be no interaction with freight lanes</span></strong><span dir="auto"> , nor level crossings; we have maximum speeds of 160 to 200 kilometers per hour.&#8221;</span></p>
<p><span dir="auto">He also mentioned that </span><strong><span dir="auto">the third phase, planned</span></strong><span dir="auto"> for approximately 1,100 kilometers, will cover the Pacific Corridor, specifically the Guadalajara-Tepic, Mazatlán-Los Mochis (currently under development with no start date for construction), Los Mochis-Guaymas, and Guaymas-Hermosillo sections. A potential fourth phase would include the Tepic-Mazatlán and Hermosillo-Nogales sections.</span></p>
<blockquote><p><span dir="auto">“ </span><strong><span dir="auto">We are building an integrated national rail network, connected </span></strong><strong><span dir="auto">to other modes of transport</span></strong><span dir="auto"> . Each of the stations we are building also includes an integrated space for urban public transport. We want to consolidate a modern rail system,” emphasized Efraín Deschamps Gutiérrez de Velasco.</span></p></blockquote>
<p><span dir="auto">Regarding the first stage, he recalled that two sections are being built by the Felipe Ángeles Engineering Group, the Mexico-AIFA and AIFA-Pachuca, and Mexico-Queretaro, while ATTRAPI, through tenders, is building the Queretaro-Irapuato and Saltillo-Nuevo Laredo sections.</span></p>
<figure id="attachment_678829" class="wp-caption aligncenter" aria-describedby="caption-attachment-678829"><img decoding="async" class="wp-image-678829 size-full" src="https://t21.com.mx/wp-content/uploads/2026/07/trenes-2.png" sizes="(max-width: 1040px) 100vw, 1040px" srcset="https://t21.com.mx/wp-content/uploads/2026/07/trenes-2.png 1040w, https://t21.com.mx/wp-content/uploads/2026/07/trenes-2-300x157.png 300w, https://t21.com.mx/wp-content/uploads/2026/07/trenes-2-1024x537.png 1024w, https://t21.com.mx/wp-content/uploads/2026/07/trenes-2-768x402.png 768w, https://t21.com.mx/wp-content/uploads/2026/07/trenes-2-600x314.png 600w, https://t21.com.mx/wp-content/uploads/2026/07/trenes-2-150x79.png 150w, https://t21.com.mx/wp-content/uploads/2026/07/trenes-2-750x393.png 750w" alt="" width="1040" height="545" data-pin-no-hover="true" /><figcaption id="caption-attachment-678829" class="wp-caption-text"><span dir="auto">Source: ATTRAPI.</span></figcaption></figure>
<p><span dir="auto">Regarding the Saltillo-Nuevo Laredo section, he said that it is the longest stretch that is already under construction and covers 396.34 kilometers from the Derramadero industrial zone to Nuevo Laredo.</span></p>
<figure id="attachment_678830" class="wp-caption aligncenter" aria-describedby="caption-attachment-678830"><img decoding="async" class="wp-image-678830 size-full" src="https://t21.com.mx/wp-content/uploads/2026/07/tren-Saltillo.png" sizes="(max-width: 1032px) 100vw, 1032px" srcset="https://t21.com.mx/wp-content/uploads/2026/07/tren-Saltillo.png 1032w, https://t21.com.mx/wp-content/uploads/2026/07/tren-Saltillo-300x163.png 300w, https://t21.com.mx/wp-content/uploads/2026/07/tren-Saltillo-1024x558.png 1024w, https://t21.com.mx/wp-content/uploads/2026/07/tren-Saltillo-768x418.png 768w, https://t21.com.mx/wp-content/uploads/2026/07/tren-Saltillo-600x327.png 600w, https://t21.com.mx/wp-content/uploads/2026/07/tren-Saltillo-150x82.png 150w, https://t21.com.mx/wp-content/uploads/2026/07/tren-Saltillo-750x408.png 750w" alt="" width="1032" height="562" data-pin-no-hover="true" /><figcaption id="caption-attachment-678830" class="wp-caption-text"><span dir="auto">Source: ATTRAPI.</span></figcaption></figure>
<p><span dir="auto">Comment and follow us on LinkedIn:  </span><a href="https://www.linkedin.com/in/evangelina-del-toro-31b8104b/"><span dir="auto">@Evangelina del Toro</span></a><span dir="auto">  /  </span><a href="https://www.linkedin.com/company/t21-grupo-comunicai-n-y-medios/"><span dir="auto">@GrupoT21</span></a></p>
<p>El cargo <a href="https://t21.us/second-phase-of-passenger-train-construction-begins-in-mexico/">Second phase of passenger train construction begins in Mexico</a> apareció primero en <a href="https://t21.us">T21</a>.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>A consortium led by Recal Estructuras will build a section of the Saltillo–Nuevo Laredo train</title>
		<link>https://t21.us/a-consortium-led-by-recal-estructuras-will-build-a-section-of-the-saltillo-nuevo-laredo-train/</link>
		
		<dc:creator><![CDATA[T21 Media]]></dc:creator>
		<pubDate>Fri, 24 Apr 2026 23:43:23 +0000</pubDate>
				<category><![CDATA[FEATURED]]></category>
		<category><![CDATA[Railway]]></category>
		<category><![CDATA[ATTRAPI]]></category>
		<category><![CDATA[PASSENGER TRAIN]]></category>
		<category><![CDATA[RAILWAY PROJECTS]]></category>
		<category><![CDATA[RECAL STRUCTURE]]></category>
		<category><![CDATA[SALTILLO-NUEVO LAREDO TRAIN]]></category>
		<guid isPermaLink="false">https://t21.us/?p=635364</guid>

					<description><![CDATA[<p>The consortium led by Recal Estructuras won the bid for the construction and design of 9.204 kilometers (km) of the Saltillo–Nuevo Laredo passenger train, segment 15 “A2”, Monterrey Metropolitan Area. Together with Constructora Moyeda, Construcciones Urales , Azvi, and Gami Ingeniería e Instalaciones, they were awarded a contract for 10 billion 438 million 249 thousand 060.02 pesos . According to the [&#8230;]</p>
<p>El cargo <a href="https://t21.us/a-consortium-led-by-recal-estructuras-will-build-a-section-of-the-saltillo-nuevo-laredo-train/">A consortium led by Recal Estructuras will build a section of the Saltillo–Nuevo Laredo train</a> apareció primero en <a href="https://t21.us">T21</a>.</p>
]]></description>
										<content:encoded><![CDATA[<p><img decoding="async" src="https://t21.com.mx/wp-content/uploads/2026/04/Sin-titulo-17.jpg" /></p>
<p><span dir="auto">The consortium led by </span><a href="https://recalglobal.com/"><span dir="auto">Recal Estructuras</span></a><span dir="auto"> won the bid for the construction and design of 9.204 kilometers (km) of the Saltillo–Nuevo Laredo passenger train, segment 15 “A2”, Monterrey Metropolitan Area.</span></p>
<p><span dir="auto">Together with Constructora Moyeda, </span><a href="https://construccionesurales.mx/"><span dir="auto">Construcciones Urales</span></a><span dir="auto"> , Azvi, and Gami Ingeniería e Instalaciones, they were awarded </span><strong><span dir="auto">a contract for 10 billion 438 million 249 thousand 060.02 pesos</span></strong><span dir="auto"> .</span></p>
<p><span dir="auto">According to the tender ruling, the consortia led by </span><strong><span dir="auto">Impulsora de Desarrollo Integral</span></strong><span dir="auto"> , as well as </span><strong><span dir="auto">Proveedora de Materiales del Norte</span></strong><span dir="auto"> , and Tordec were rejected for not meeting the required requirements.</span></p>
<p><span dir="auto">Meanwhile, along with Recal Estructuras, </span><a href="https://www.ica.com.mx/"><span dir="auto">ICA Constructora</span></a><span dir="auto"> and Constructora de Proyectos Viales de México complied with the requirements established by the </span><a href="https://www.gob.mx/attrapi/en"><span dir="auto">Agency for Trains and Integrated Public Transport (ATTRAPI)</span></a><span dir="auto"> .</span></p>
<p><span dir="auto">The agency specified that </span><strong><span dir="auto">the work will begin on May 1st</span></strong><span dir="auto"> and will have an execution period of 1,007 calendar days.</span></p>
<p><span dir="auto">The Saltillo–Nuevo Laredo train is expected to improve regional connectivity in the Bajío region. This 18.06 km rail line will connect the Monterrey Metropolitan Area, passing through urban and rural areas, as well as industrial sites.</span></p>
<p><span dir="auto">It is worth remembering that the overall </span><strong><span dir="auto"> Saltillo-Nuevo Laredo train project consists of the construction of a 396.3 kilometer (km) railway line </span></strong><span dir="auto"> that will have a double track section without electrification and will run at a maximum speed of 200 kilometers per hour (km/h).</span></p>
<figure id="attachment_673356" class="wp-caption aligncenter" aria-describedby="caption-attachment-673356"><img decoding="async" class="wp-image-673356 size-full" src="https://t21.com.mx/wp-content/uploads/2026/04/Captura-de-pantalla-2026-02-22-213315.png" sizes="(max-width: 950px) 100vw, 950px" srcset="https://t21.com.mx/wp-content/uploads/2026/04/Captura-de-pantalla-2026-02-22-213315.png 950w, https://t21.com.mx/wp-content/uploads/2026/04/Captura-de-pantalla-2026-02-22-213315-300x154.png 300w, https://t21.com.mx/wp-content/uploads/2026/04/Captura-de-pantalla-2026-02-22-213315-768x394.png 768w, https://t21.com.mx/wp-content/uploads/2026/04/Captura-de-pantalla-2026-02-22-213315-600x308.png 600w, https://t21.com.mx/wp-content/uploads/2026/04/Captura-de-pantalla-2026-02-22-213315-150x77.png 150w, https://t21.com.mx/wp-content/uploads/2026/04/Captura-de-pantalla-2026-02-22-213315-750x384.png 750w" alt="" width="950" height="487" data-pin-no-hover="true" /><figcaption id="caption-attachment-673356" class="wp-caption-text"><span dir="auto">Source: ATTRAPI.</span></figcaption></figure>
<p><span dir="auto">Comment and follow us on LinkedIn:  </span><a href="https://www.linkedin.com/in/evangelina-del-toro-31b8104b/"><span dir="auto">@Evangelina del Toro</span></a><span dir="auto">  /  </span><a id="menurj3" class="fui-Link ___1q1shib f2hkw1w f3rmtva f1ewtqcl fyind8e f1k6fduh f1w7gpdv fk6fouc fjoy568 figsok6 f1s184ao f1mk8lai fnbmjn9 f1o700av f13mvf36 f1cmlufx f9n3di6 f1ids18y f1tx3yz7 f1deo86v f1eh06m1 f1iescvh fhgqx19 f1olyrje f1p93eir f1nev41a f1h8hb77 f1lqvz6u f10aw75t fsle3fq f17ae5zn" title="https://www.linkedin.com/company/t21-grupo-comunicai-ny-medios/" href="https://www.linkedin.com/company/t21-grupo-comunicai-n-y-medios/" target="_blank" rel="noreferrer noopener" aria-label="Link @GrupoT21"><span dir="auto">@GrupoT21</span></a></p>
<p>El cargo <a href="https://t21.us/a-consortium-led-by-recal-estructuras-will-build-a-section-of-the-saltillo-nuevo-laredo-train/">A consortium led by Recal Estructuras will build a section of the Saltillo–Nuevo Laredo train</a> apareció primero en <a href="https://t21.us">T21</a>.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>This consortium will build 4 stations on the Saltillo-Nuevo Laredo train line</title>
		<link>https://t21.us/this-consortium-will-build-4-stations-on-the-saltillo-nuevo-laredo-train-line/</link>
		
		<dc:creator><![CDATA[T21 Media]]></dc:creator>
		<pubDate>Tue, 21 Apr 2026 00:22:47 +0000</pubDate>
				<category><![CDATA[Railway]]></category>
		<category><![CDATA[ATTRAPI]]></category>
		<category><![CDATA[COMSA INFRASTRUCTURE]]></category>
		<category><![CDATA[PASSENGER TRAIN]]></category>
		<category><![CDATA[RAILWAY PROJECTS]]></category>
		<category><![CDATA[SALTILLO-NUEVO LAREDO TRAIN]]></category>
		<category><![CDATA[STATION CONSTRUCTION]]></category>
		<guid isPermaLink="false">https://t21.us/?p=635269</guid>

					<description><![CDATA[<p>The federal government awarded the consortium headed by Comsa Infraestructuras  a contract for 2,890,971,095.04 pesos for the construction and design of four stations of the  Saltillo-Nuevo Laredo passenger train . According to the tender award document, of the five proposals received by the Agency for Trains and Integrated Public Transport (ATTRAPI) , the winning bid was the only one that was solvent and [&#8230;]</p>
<p>El cargo <a href="https://t21.us/this-consortium-will-build-4-stations-on-the-saltillo-nuevo-laredo-train-line/">This consortium will build 4 stations on the Saltillo-Nuevo Laredo train line</a> apareció primero en <a href="https://t21.us">T21</a>.</p>
]]></description>
										<content:encoded><![CDATA[<p><img decoding="async" src="https://t21.com.mx/wp-content/uploads/2026/04/Sin-titulo-11.jpg" /></p>
<p><span dir="auto">The federal government awarded the consortium headed by </span><a href="https://www.comsa.com/"><span dir="auto">Comsa Infraestructuras</span></a><span dir="auto">  a contract for </span><strong><span dir="auto">2,890,971,095.04 pesos</span></strong><span dir="auto"> for the construction and design of four stations of the  </span><strong><span dir="auto">Saltillo-Nuevo Laredo passenger train</span></strong><span dir="auto"> .</span></p>
<p><span dir="auto">According to the tender award document, of the five proposals received by the </span><a href="https://www.gob.mx/attrapi"><span dir="auto">Agency for Trains and Integrated Public Transport (ATTRAPI)</span></a><span dir="auto"> , the winning bid was the only one that was solvent and met all the requested requirements.</span></p>
<p><span dir="auto">Comsa Infraestructura formed the consortium with Regiomontana de Construcción y Servicios, Comsa, and Vise. </span><strong><span dir="auto">Work will begin on April 27th</span></strong><span dir="auto"> , with a completion timeframe of 749 calendar days.</span></p>
<p><span dir="auto">The agency highlighted that the 2026 allocation for this project amounts to 1,116 million 688 thousand 100.40 pesos.</span></p>
<p><span dir="auto">The works encompass the construction and design of the  </span><strong><span dir="auto">Derramadero, Saltillo, Ramos Arizpe and García</span></strong><span dir="auto"> stations .</span></p>
<p><span dir="auto">Last February, ATTRAPI declared the bidding process for this project void, as it considered that none of the offers it received met all the requested technical and economic requirements.</span></p>
<p><strong><span dir="auto">The Saltillo-Nuevo Laredo train project involves the construction of a 396.3-kilometer (km) railway line,</span></strong><span dir="auto"> which will include a section of double track that is not electrified and will operate at a maximum speed of 200 kilometers per hour (km/h). It also includes the following stations and stops: Derramadero, Saltillo Centro, Ramos Arizpe, García, Las Torres, Salinas Victoria, Bustamante, Lampazos, Anáhuac, and Nuevo Laredo.</span></p>
<p><span dir="auto">It is worth remembering that </span><a href="https://recalglobal.com/"><span dir="auto">Recal Estructuras</span></a><span dir="auto"> , </span><a href="https://construccionesurales.mx/"><span dir="auto">Construcciones Urales</span></a><span dir="auto"> , Gami Ingeniería e Instalaciones, Azvi and Constructora Moyeda were the companies that won the construction and design of 8.854 km of this same project in segment 15 “A1”, Monterrey Metropolitan Area.</span></p>
<blockquote><p><span dir="auto">ATTRAPI also launched tenders for this project for the construction and design of the General Escobedo, Salinas Victoria, Villaldama, Lampazos de Naranjo, Anáhuac and Nuevo Laredo stations; the deadline for submitting proposals is May 12.</span></p></blockquote>
<p><span dir="auto">Also, on April 29th, the decision will be made for the tender for the construction and design of the Zica Derramadero railway auxiliary buildings, García Workshops and Garages, Las Torres inspection zone, Salinas Victoria maintenance base and Zica Nuevo Laredo.</span></p>
<p><span dir="auto">Meanwhile, the next April 24th will be for the construction and design of the railway systems, and the 21st of the same month for the construction and design of 9,204 km, segment 15 “A2”, Monterrey Metropolitan Area.</span></p>
<p><span dir="auto">Comment and follow us on LinkedIn:  </span><a href="https://www.linkedin.com/in/evangelina-del-toro-31b8104b/"><span dir="auto">@Evangelina del Toro</span></a><span dir="auto">  /  </span><a href="https://www.linkedin.com/company/t21-grupo-comunicai-n-y-medios/"><span dir="auto">@GrupoT21</span></a></p>
<div class="jeg_ad jeg_ad_article jnews_content_inline_2_ads  ">
<div class="ads-wrapper align-center "></div>
</div>
<p>El cargo <a href="https://t21.us/this-consortium-will-build-4-stations-on-the-saltillo-nuevo-laredo-train-line/">This consortium will build 4 stations on the Saltillo-Nuevo Laredo train line</a> apareció primero en <a href="https://t21.us">T21</a>.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>ATTRAPI receives proposals for section of the Saltillo–Nuevo Laredo train</title>
		<link>https://t21.us/attrapi-receives-proposals-for-section-of-the-saltillo-nuevo-laredo-train/</link>
		
		<dc:creator><![CDATA[T21 Media]]></dc:creator>
		<pubDate>Wed, 08 Apr 2026 22:21:04 +0000</pubDate>
				<category><![CDATA[Railway]]></category>
		<category><![CDATA[ATTRAPI]]></category>
		<category><![CDATA[PASSENGER TRAIN]]></category>
		<category><![CDATA[RAILWAY PROJECTS]]></category>
		<category><![CDATA[SALTILLO-NUEVO LAREDO TRIAN]]></category>
		<category><![CDATA[TENDER]]></category>
		<guid isPermaLink="false">https://t21.us/?p=635027</guid>

					<description><![CDATA[<p>The Agency for Trains and Integrated Public Transportation (ATTRAPI)  received six bids as part of the construction and design of 9.204 kilometers (km) of the Saltillo–Nuevo Laredo passenger train, segment 15 “A2”, Monterrey Metropolitan Area. According to the document, the consortium made up of Impulsora de Desarrollo Integral , Jaguar Ingenieros Constructores , Cargo Energía, Ingeniería y Construcción, Proacon México, China [&#8230;]</p>
<p>El cargo <a href="https://t21.us/attrapi-receives-proposals-for-section-of-the-saltillo-nuevo-laredo-train/">ATTRAPI receives proposals for section of the Saltillo–Nuevo Laredo train</a> apareció primero en <a href="https://t21.us">T21</a>.</p>
]]></description>
										<content:encoded><![CDATA[<p><img decoding="async" src="https://t21.com.mx/wp-content/uploads/2026/04/Sin-titulo1.jpg" /></p>
<p><span dir="auto">The </span><a href="https://www.gob.mx/attrapi"><span dir="auto">Agency for Trains and Integrated Public Transportation (ATTRAPI)</span></a><span dir="auto">  received six bids as part of the construction and design of 9.204 kilometers (km) of the Saltillo–Nuevo Laredo passenger train, segment 15 “A2”, Monterrey Metropolitan Area.</span></p>
<p><span dir="auto">According to the document, the consortium made up of </span><a href="https://grupoidinsa.com/"><span dir="auto">Impulsora de Desarrollo Integral</span></a><span dir="auto"> , </span><a href="https://jaguaringenieros.mx/"><span dir="auto">Jaguar Ingenieros Constructores</span></a><span dir="auto"> , Cargo Energía, Ingeniería y Construcción, Proacon México, China Civil Engineering Construction Corporation and </span><a href="http://aldesa.com.mx/"><span dir="auto">Construcciones Aldesem</span></a><span dir="auto"> , submitted the lowest offer with </span><strong><span dir="auto">nine billion 278 million 429 thousand 324.98 pesos</span></strong><span dir="auto"> .</span></p>
<p><span dir="auto">The consortium made up of </span><a href="https://tordec.com/"><span dir="auto">Tordec</span></a><span dir="auto"> , Proyectos y Desarrollos Salve, ZITUM Desarrolladores, and Proyectos y Estudios Ferroviarios, offered </span><strong><span dir="auto">the highest bid at 11 billion 89 million 475 thousand 533.02 pesos</span></strong><span dir="auto"> .</span></p>
<p><span dir="auto">Constructora de Proyectos Viales de México, </span><a href="https://www.grupocaabsa.com/"><span dir="auto">Caabsa Constructora</span></a><span dir="auto"> and Obrascon Huarte Lain (OHL) proposed 11 billion 13 million 703 thousand 496.79 pesos.</span></p>
<p><span dir="auto">The consortium made up of </span><a href="https://ica.com.mx/"><span dir="auto">ICA Constructora</span></a><span dir="auto"> , Desarrolladora de Infraestructura Puerto Escondido; Controladora de Operaciones de Infraestructura, </span><strong><span dir="auto">Compañía Hidroeléctrica La Yesca</span></strong><span dir="auto"> , ICA Edificio Satélite, Constructora El Cajón, Entia de México, Desarrollo y Construcciones Urbanas, Constructora Garza Ponce, Construcciones y Trituraciones and ICA Constructora de Infraestructura, submitted a proposal of 10 billion 700 million 291 thousand 890.35 pesos.</span></p>
<p><span dir="auto">Meanwhile, Proveedora de Materiales del Norte, </span><a href="https://www.rubau.com/project/mexico/"><span dir="auto">Rubau México</span></a><span dir="auto"> , González Soto y Asociados, ASCH, Construcciones y Maquinaria SEF, ASCH Infraestructuras y Servicios and ASCH Infraestructuras y Servicios, Agencia en Chile, submitted a bid of nine billion 917 million 991 thousand 547.57 pesos.</span></p>
<p><span dir="auto">Finally, </span><a href="https://recalglobal.com/"><span dir="auto">Recal Estructuras</span></a><span dir="auto"> , Constructora Moyeda, Construcciones Urales, AZVI, and Gami Ingeniería e Instalaciones, proposed 10 billion 438 million 249 thousand 060.02 pesos.</span></p>
<p><span dir="auto">ATTRAPI detailed that </span><strong><span dir="auto"> the project includes the construction of a double railway track</span></strong><span dir="auto"> , the elevated stations of González Garza and Monterrey Centro, as well as the studies necessary for the correct preparation and authorization of the executive project, among other works.</span></p>
<p><span dir="auto">The agency has set </span><strong><span dir="auto"> May 1st as the start date for the work</span></strong><span dir="auto"> , with a completion timeframe of 1,007 calendar days. It specified that </span><strong><span dir="auto"> it has allocated 1,701,168,857.41 pesos</span></strong><span dir="auto">  for this project this year.</span></p>
<p><span dir="auto">The agency will announce the winner of this contest on April 17th.</span></p>
<p><span dir="auto">Comment and follow us on LinkedIn:  </span><a href="https://www.linkedin.com/in/evangelina-del-toro-31b8104b/"><span dir="auto">@Evangelina del Toro</span></a><span dir="auto">  /  </span><a href="https://www.linkedin.com/company/t21-grupo-comunicai-n-y-medios/"><span dir="auto">@GrupoT21</span></a></p>
<p>El cargo <a href="https://t21.us/attrapi-receives-proposals-for-section-of-the-saltillo-nuevo-laredo-train/">ATTRAPI receives proposals for section of the Saltillo–Nuevo Laredo train</a> apareció primero en <a href="https://t21.us">T21</a>.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>ATTRAPI launches competition to build 6 stations for the Saltillo–Nuevo Laredo train</title>
		<link>https://t21.us/attrapi-launches-competition-to-build-6-stations-for-the-saltillo-nuevo-laredo-train/</link>
		
		<dc:creator><![CDATA[T21 Media]]></dc:creator>
		<pubDate>Tue, 07 Apr 2026 01:45:43 +0000</pubDate>
				<category><![CDATA[Railway]]></category>
		<category><![CDATA[ATTRAPI]]></category>
		<category><![CDATA[INAH]]></category>
		<category><![CDATA[PASSENGER TRAIN]]></category>
		<category><![CDATA[RAILWAY PROJECTS]]></category>
		<category><![CDATA[RAILWAY STATIONS]]></category>
		<category><![CDATA[SALTILLO-NUEVO LAREDO TRAIN]]></category>
		<guid isPermaLink="false">https://t21.us/?p=634973</guid>

					<description><![CDATA[<p>The  Agency for Trains and Integrated Public Transportation (ATTRAPI) launched the call for bids for the construction and design of six railway stations for the Saltillo–Nuevo Laredo passenger train. According to the document, these are the stations General Escobedo, Salinas Victoria, Villaldama, Lampazos de Naranjo, Anáhuac and Nuevo Laredo . “The work will be carried out under a continuous management scheme [&#8230;]</p>
<p>El cargo <a href="https://t21.us/attrapi-launches-competition-to-build-6-stations-for-the-saltillo-nuevo-laredo-train/">ATTRAPI launches competition to build 6 stations for the Saltillo–Nuevo Laredo train</a> apareció primero en <a href="https://t21.us">T21</a>.</p>
]]></description>
										<content:encoded><![CDATA[<p><img decoding="async" src="https://t21.com.mx/wp-content/uploads/2026/04/Sin-titulo-1.jpg" /></p>
<p><span dir="auto">The  </span><a href="https://www.gob.mx/attrapi"><span dir="auto">Agency for Trains and Integrated Public Transportation (ATTRAPI)</span></a><span dir="auto"> launched the call for bids for the </span><strong><span dir="auto">construction and design of six railway stations</span></strong><span dir="auto"> for the Saltillo–Nuevo Laredo passenger train.</span></p>
<p><span dir="auto">According to the document, these are the stations </span><strong><span dir="auto">General Escobedo, Salinas Victoria, Villaldama, Lampazos de Naranjo, Anáhuac and Nuevo Laredo</span></strong><span dir="auto"> .</span></p>
<blockquote><p><span dir="auto">“The work will be carried out under a continuous management scheme ( </span><em><span dir="auto">fast track</span></em><span dir="auto"> ), starting construction in stages as portions of the executive project are completed, without waiting to have the project completed in its entirety, which implies that work can begin as long as the construction elements of the work to be carried out do have the corresponding executive project,” the agency specified.</span></p></blockquote>
<p><span dir="auto">ATTRAPI highlighted that </span><strong><span dir="auto">Salinas Victoria, Villaldama and Lampazos de Naranjo are old stations with historical value</span></strong><span dir="auto">  cataloged by the </span><a href="https://www.inah.gob.mx/"><span dir="auto">National Institute of Anthropology and History (INAH)</span></a><span dir="auto"> , so the winner must consider the materials, specialized personnel, tools, equipment, temporary installations and other elements required for their correct execution, in accordance with the guidelines and authorizations issued by this institute.</span></p>
<blockquote><p><span dir="auto">“The winning bidder will be responsible for coordinating with the competent authorities for the initiation, management, monitoring and conclusion of all necessary procedures, the preparation of studies, reports, executive project and the execution of rescue and salvage actions, as well as for carrying out the corresponding works, within the deadlines established by the agency,” he explained.</span></p></blockquote>
<p><span dir="auto">The agency specified that the presentation and opening of proposals for this project </span><strong><span dir="auto">will be on April 21, and that day the date on which the decision will be made will be announced</span></strong><span dir="auto"> .</span></p>
<p><span dir="auto">Similarly, he indicated that the start date for the work will be </span><strong><span dir="auto">May 21, 2026, with a deadline for the execution of the work of 558 calendar days</span></strong><span dir="auto"> .</span></p>
<p><span dir="auto">Comment and follow us on LinkedIn:  </span><a href="https://www.linkedin.com/in/evangelina-del-toro-31b8104b/"><span dir="auto">@Evangelina del Toro</span></a><span dir="auto">  /  </span><a href="https://www.linkedin.com/company/t21-grupo-comunicai-n-y-medios/"><span dir="auto">@GrupoT21</span></a></p>
<p>El cargo <a href="https://t21.us/attrapi-launches-competition-to-build-6-stations-for-the-saltillo-nuevo-laredo-train/">ATTRAPI launches competition to build 6 stations for the Saltillo–Nuevo Laredo train</a> apareció primero en <a href="https://t21.us">T21</a>.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>These were the most stolen products on the railroad in Mexico during 2025</title>
		<link>https://t21.us/these-were-the-most-stolen-products-on-the-railroad-in-mexico-during-2025-2/</link>
		
		<dc:creator><![CDATA[T21 Media]]></dc:creator>
		<pubDate>Mon, 30 Mar 2026 23:37:48 +0000</pubDate>
				<category><![CDATA[Railway]]></category>
		<category><![CDATA[ATTRAPI]]></category>
		<category><![CDATA[AUTO PARTS]]></category>
		<category><![CDATA[CORN]]></category>
		<category><![CDATA[RAIL FREIGHT]]></category>
		<category><![CDATA[railroad robberies]]></category>
		<category><![CDATA[RAILWAY]]></category>
		<guid isPermaLink="false">https://t21.us/?p=634878</guid>

					<description><![CDATA[<p>During 2025, auto parts, accessories, batteries, tires, and corn were the most stolen products in rail transport in Mexico, according to the Agency of Trains and Integrated Public Transport (ATTRAPI) . According to data from the agency, the five states with the most robbery incidents during the period were Coahuila, Aguascalientes, Guanajuato, Sonora, and Sinaloa . However, ATTRAPI highlighted that, as [&#8230;]</p>
<p>El cargo <a href="https://t21.us/these-were-the-most-stolen-products-on-the-railroad-in-mexico-during-2025-2/">These were the most stolen products on the railroad in Mexico during 2025</a> apareció primero en <a href="https://t21.us">T21</a>.</p>
]]></description>
										<content:encoded><![CDATA[<p><img decoding="async" src="https://t21.com.mx/wp-content/uploads/2026/03/Sin-titulo-19.jpg" /></p>
<p><span dir="auto">During 2025, </span><strong><span dir="auto">auto parts, accessories, batteries, tires, and corn</span></strong><span dir="auto"> were the most stolen products in rail transport in Mexico, according to the </span><a href="https://www.gob.mx/attrapi"><span dir="auto">Agency of Trains and Integrated Public Transport (ATTRAPI)</span></a><span dir="auto"> .</span></p>
<p><span dir="auto">According to data from the agency, the five states with the most robbery incidents during the period were </span><strong><span dir="auto">Coahuila, Aguascalientes, Guanajuato, Sonora, and Sinaloa</span></strong><span dir="auto"> .</span></p>
<p><img decoding="async" class="aligncenter wp-image-671425" src="https://t21.com.mx/wp-content/uploads/2026/03/Designer-20.jpeg" sizes="(max-width: 425px) 100vw, 425px" srcset="https://t21.com.mx/wp-content/uploads/2026/03/Designer-20.jpeg 1024w, https://t21.com.mx/wp-content/uploads/2026/03/Designer-20-200x300.jpeg 200w, https://t21.com.mx/wp-content/uploads/2026/03/Designer-20-683x1024.jpeg 683w, https://t21.com.mx/wp-content/uploads/2026/03/Designer-20-768x1152.jpeg 768w, https://t21.com.mx/wp-content/uploads/2026/03/Designer-20-600x900.jpeg 600w, https://t21.com.mx/wp-content/uploads/2026/03/Designer-20-150x225.jpeg 150w, https://t21.com.mx/wp-content/uploads/2026/03/Designer-20-750x1125.jpeg 750w" alt="" width="425" height="638" data-pin-no-hover="true" /></p>
<p><span dir="auto">However, ATTRAPI highlighted that, as a result of actions taken in railway security, </span><strong><span dir="auto">reports of railway robbery decreased by 6.8% in 2025 compared to 2024</span></strong><span dir="auto"> .</span></p>
<p><span dir="auto">He specified that from January to December 2025, </span><strong><span dir="auto">four thousand 002 theft reports were filed compared to the four thousand 298</span></strong><span dir="auto"> filed in the same period.</span></p>
<p><span dir="auto">The industrial products group accounted for 79.10% of the total theft reports, followed by agricultural products, with 18.31 percent.</span></p>
<p><span dir="auto">Regarding product or cargo theft, the most affected subgroups during the period were:</span></p>
<ul>
<li><span dir="auto">Other industrial products, with 21.04% of the total reports.</span></li>
<li><span dir="auto">Consumer goods, with 17.22 percent.</span></li>
<li><span dir="auto">Auto parts, with 16.83 percent.</span></li>
<li><span dir="auto">Grains, seeds and their derivatives, with 13.48 percent.</span></li>
</ul>
<p><span dir="auto">The agency stated that within the subgroup of other industrial products, </span><strong><span dir="auto">accessories</span></strong><span dir="auto"> accounted for 59.23% of the reports. In the case of consumer goods, batteries accounted for 41.61%.</span></p>
<p><span dir="auto">Meanwhile, within the auto parts subgroup, </span><strong><span dir="auto">tires</span></strong><span dir="auto"> were the most frequently stolen item , accounting for 94.37 percent of thefts. For grains, seeds, and their derivatives, </span><strong><span dir="auto">corn</span></strong><span dir="auto"> was the most stolen product , representing 57.98 percent of reported thefts.</span></p>
<p><span dir="auto">Comment and follow us on LinkedIn:  </span><a href="https://www.linkedin.com/in/evangelina-del-toro-31b8104b/"><span dir="auto">@Evangelina del Toro</span></a><span dir="auto">  /  </span><a href="https://www.linkedin.com/company/t21-grupo-comunicai-n-y-medios/"><span dir="auto">@GrupoT21</span></a></p>
<p>El cargo <a href="https://t21.us/these-were-the-most-stolen-products-on-the-railroad-in-mexico-during-2025-2/">These were the most stolen products on the railroad in Mexico during 2025</a> apareció primero en <a href="https://t21.us">T21</a>.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>These were the most stolen products on the railroad in Mexico during 2025</title>
		<link>https://t21.us/these-were-the-most-stolen-products-on-the-railroad-in-mexico-during-2025/</link>
		
		<dc:creator><![CDATA[T21 Media]]></dc:creator>
		<pubDate>Mon, 30 Mar 2026 23:31:53 +0000</pubDate>
				<category><![CDATA[Railway]]></category>
		<category><![CDATA[ATTRAPI]]></category>
		<category><![CDATA[AUTOPARTS]]></category>
		<category><![CDATA[CORN]]></category>
		<category><![CDATA[RAILFREIGHT]]></category>
		<category><![CDATA[railroad robberies]]></category>
		<category><![CDATA[RAILWAY]]></category>
		<guid isPermaLink="false">https://t21.us/?p=634874</guid>

					<description><![CDATA[<p>During 2025, auto parts, accessories, batteries, tires, and corn were the most stolen products in rail transport in Mexico, according to the Agency of Trains and Integrated Public Transport (ATTRAPI) . According to data from the agency, the five states with the most robbery incidents during the period were Coahuila, Aguascalientes, Guanajuato, Sonora, and Sinaloa . However, ATTRAPI highlighted that, as [&#8230;]</p>
<p>El cargo <a href="https://t21.us/these-were-the-most-stolen-products-on-the-railroad-in-mexico-during-2025/">These were the most stolen products on the railroad in Mexico during 2025</a> apareció primero en <a href="https://t21.us">T21</a>.</p>
]]></description>
										<content:encoded><![CDATA[<p><img decoding="async" src="https://t21.com.mx/wp-content/uploads/2026/03/Sin-titulo-19.jpg" /></p>
<p><span dir="auto">During 2025, </span><strong><span dir="auto">auto parts, accessories, batteries, tires, and corn</span></strong><span dir="auto"> were the most stolen products in rail transport in Mexico, according to the </span><a href="https://www.gob.mx/attrapi"><span dir="auto">Agency of Trains and Integrated Public Transport (ATTRAPI)</span></a><span dir="auto"> .</span></p>
<p><span dir="auto">According to data from the agency, the five states with the most robbery incidents during the period were </span><strong><span dir="auto">Coahuila, Aguascalientes, Guanajuato, Sonora, and Sinaloa</span></strong><span dir="auto"> .</span></p>
<p><img decoding="async" class="aligncenter wp-image-671425" src="https://t21.com.mx/wp-content/uploads/2026/03/Designer-20.jpeg" sizes="(max-width: 425px) 100vw, 425px" srcset="https://t21.com.mx/wp-content/uploads/2026/03/Designer-20.jpeg 1024w, https://t21.com.mx/wp-content/uploads/2026/03/Designer-20-200x300.jpeg 200w, https://t21.com.mx/wp-content/uploads/2026/03/Designer-20-683x1024.jpeg 683w, https://t21.com.mx/wp-content/uploads/2026/03/Designer-20-768x1152.jpeg 768w, https://t21.com.mx/wp-content/uploads/2026/03/Designer-20-600x900.jpeg 600w, https://t21.com.mx/wp-content/uploads/2026/03/Designer-20-150x225.jpeg 150w, https://t21.com.mx/wp-content/uploads/2026/03/Designer-20-750x1125.jpeg 750w" alt="" width="425" height="638" data-pin-no-hover="true" /></p>
<p><span dir="auto">However, ATTRAPI highlighted that, as a result of actions taken in railway security, </span><strong><span dir="auto">reports of railway robbery decreased by 6.8% in 2025 compared to 2024</span></strong><span dir="auto"> .</span></p>
<p><span dir="auto">He specified that from January to December 2025, </span><strong><span dir="auto">four thousand 002 theft reports were filed compared to the four thousand 298</span></strong><span dir="auto"> filed in the same period.</span></p>
<p><span dir="auto">The industrial products group accounted for 79.10% of the total theft reports, followed by agricultural products, with 18.31 percent.</span></p>
<p><span dir="auto">Regarding product or cargo theft, the most affected subgroups during the period were:</span></p>
<ul>
<li><span dir="auto">Other industrial products, with 21.04% of the total reports.</span></li>
<li><span dir="auto">Consumer goods, with 17.22 percent.</span></li>
<li><span dir="auto">Auto parts, with 16.83 percent.</span></li>
<li><span dir="auto">Grains, seeds and their derivatives, with 13.48 percent.</span></li>
</ul>
<p><span dir="auto">The agency stated that within the subgroup of other industrial products, </span><strong><span dir="auto">accessories</span></strong><span dir="auto"> accounted for 59.23% of the reports. In the case of consumer goods, batteries accounted for 41.61%.</span></p>
<p><span dir="auto">Meanwhile, within the auto parts subgroup, </span><strong><span dir="auto">tires</span></strong><span dir="auto"> were the most frequently stolen item , accounting for 94.37 percent of thefts. For grains, seeds, and their derivatives, </span><strong><span dir="auto">corn</span></strong><span dir="auto"> was the most stolen product , representing 57.98 percent of reported thefts.</span></p>
<p><span dir="auto">Comment and follow us on LinkedIn:  </span><a href="https://www.linkedin.com/in/evangelina-del-toro-31b8104b/"><span dir="auto">@Evangelina del Toro</span></a><span dir="auto">  /  </span><a href="https://www.linkedin.com/company/t21-grupo-comunicai-n-y-medios/"><span dir="auto">@GrupoT21</span></a></p>
<p>El cargo <a href="https://t21.us/these-were-the-most-stolen-products-on-the-railroad-in-mexico-during-2025/">These were the most stolen products on the railroad in Mexico during 2025</a> apareció primero en <a href="https://t21.us">T21</a>.</p>
]]></content:encoded>
					
		
		
			</item>
	</channel>
</rss>
