<?xml version="1.0" encoding="UTF-8"?><rss version="2.0"
	xmlns:content="http://purl.org/rss/1.0/modules/content/"
	xmlns:wfw="http://wellformedweb.org/CommentAPI/"
	xmlns:dc="http://purl.org/dc/elements/1.1/"
	xmlns:atom="http://www.w3.org/2005/Atom"
	xmlns:sy="http://purl.org/rss/1.0/modules/syndication/"
	xmlns:slash="http://purl.org/rss/1.0/modules/slash/"
	>

<channel>
	<title>ATTRAPI archivos - T21</title>
	<atom:link href="https://t21.us/tag/attrapi/feed/" rel="self" type="application/rss+xml" />
	<link>https://t21.us/tag/attrapi/</link>
	<description>The leading provider of news in the Transportation and Logistics Sector, including Air, Maritime, Land, and Railway, in Mexico and Latin America.</description>
	<lastBuildDate>Fri, 24 Apr 2026 23:43:23 +0000</lastBuildDate>
	<language>en-US</language>
	<sy:updatePeriod>
	hourly	</sy:updatePeriod>
	<sy:updateFrequency>
	1	</sy:updateFrequency>
	<generator>https://wordpress.org/?v=7.0</generator>

<image>
	<url>https://t21.us/wp-content/uploads/2024/04/cropped-t21-favicon-200-32x32-1.png</url>
	<title>ATTRAPI archivos - T21</title>
	<link>https://t21.us/tag/attrapi/</link>
	<width>32</width>
	<height>32</height>
</image> 
	<item>
		<title>A consortium led by Recal Estructuras will build a section of the Saltillo–Nuevo Laredo train</title>
		<link>https://t21.us/a-consortium-led-by-recal-estructuras-will-build-a-section-of-the-saltillo-nuevo-laredo-train/</link>
		
		<dc:creator><![CDATA[T21 Media]]></dc:creator>
		<pubDate>Fri, 24 Apr 2026 23:43:23 +0000</pubDate>
				<category><![CDATA[FEATURED]]></category>
		<category><![CDATA[Railway]]></category>
		<category><![CDATA[ATTRAPI]]></category>
		<category><![CDATA[PASSENGER TRAIN]]></category>
		<category><![CDATA[RAILWAY PROJECTS]]></category>
		<category><![CDATA[RECAL STRUCTURE]]></category>
		<category><![CDATA[SALTILLO-NUEVO LAREDO TRAIN]]></category>
		<guid isPermaLink="false">https://t21.us/?p=635364</guid>

					<description><![CDATA[<p>The consortium led by Recal Estructuras won the bid for the construction and design of 9.204 kilometers (km) of the Saltillo–Nuevo Laredo passenger train, segment 15 “A2”, Monterrey Metropolitan Area. Together with Constructora Moyeda, Construcciones Urales , Azvi, and Gami Ingeniería e Instalaciones, they were awarded a contract for 10 billion 438 million 249 thousand 060.02 pesos . According to the [&#8230;]</p>
<p>El cargo <a href="https://t21.us/a-consortium-led-by-recal-estructuras-will-build-a-section-of-the-saltillo-nuevo-laredo-train/">A consortium led by Recal Estructuras will build a section of the Saltillo–Nuevo Laredo train</a> apareció primero en <a href="https://t21.us">T21</a>.</p>
]]></description>
										<content:encoded><![CDATA[<p><img decoding="async" src="https://t21.com.mx/wp-content/uploads/2026/04/Sin-titulo-17.jpg" /></p>
<p><span dir="auto">The consortium led by </span><a href="https://recalglobal.com/"><span dir="auto">Recal Estructuras</span></a><span dir="auto"> won the bid for the construction and design of 9.204 kilometers (km) of the Saltillo–Nuevo Laredo passenger train, segment 15 “A2”, Monterrey Metropolitan Area.</span></p>
<p><span dir="auto">Together with Constructora Moyeda, </span><a href="https://construccionesurales.mx/"><span dir="auto">Construcciones Urales</span></a><span dir="auto"> , Azvi, and Gami Ingeniería e Instalaciones, they were awarded </span><strong><span dir="auto">a contract for 10 billion 438 million 249 thousand 060.02 pesos</span></strong><span dir="auto"> .</span></p>
<p><span dir="auto">According to the tender ruling, the consortia led by </span><strong><span dir="auto">Impulsora de Desarrollo Integral</span></strong><span dir="auto"> , as well as </span><strong><span dir="auto">Proveedora de Materiales del Norte</span></strong><span dir="auto"> , and Tordec were rejected for not meeting the required requirements.</span></p>
<p><span dir="auto">Meanwhile, along with Recal Estructuras, </span><a href="https://www.ica.com.mx/"><span dir="auto">ICA Constructora</span></a><span dir="auto"> and Constructora de Proyectos Viales de México complied with the requirements established by the </span><a href="https://www.gob.mx/attrapi/en"><span dir="auto">Agency for Trains and Integrated Public Transport (ATTRAPI)</span></a><span dir="auto"> .</span></p>
<p><span dir="auto">The agency specified that </span><strong><span dir="auto">the work will begin on May 1st</span></strong><span dir="auto"> and will have an execution period of 1,007 calendar days.</span></p>
<p><span dir="auto">The Saltillo–Nuevo Laredo train is expected to improve regional connectivity in the Bajío region. This 18.06 km rail line will connect the Monterrey Metropolitan Area, passing through urban and rural areas, as well as industrial sites.</span></p>
<p><span dir="auto">It is worth remembering that the overall </span><strong><span dir="auto"> Saltillo-Nuevo Laredo train project consists of the construction of a 396.3 kilometer (km) railway line </span></strong><span dir="auto"> that will have a double track section without electrification and will run at a maximum speed of 200 kilometers per hour (km/h).</span></p>
<figure id="attachment_673356" class="wp-caption aligncenter" aria-describedby="caption-attachment-673356"><img fetchpriority="high" decoding="async" class="wp-image-673356 size-full" src="https://t21.com.mx/wp-content/uploads/2026/04/Captura-de-pantalla-2026-02-22-213315.png" sizes="(max-width: 950px) 100vw, 950px" srcset="https://t21.com.mx/wp-content/uploads/2026/04/Captura-de-pantalla-2026-02-22-213315.png 950w, https://t21.com.mx/wp-content/uploads/2026/04/Captura-de-pantalla-2026-02-22-213315-300x154.png 300w, https://t21.com.mx/wp-content/uploads/2026/04/Captura-de-pantalla-2026-02-22-213315-768x394.png 768w, https://t21.com.mx/wp-content/uploads/2026/04/Captura-de-pantalla-2026-02-22-213315-600x308.png 600w, https://t21.com.mx/wp-content/uploads/2026/04/Captura-de-pantalla-2026-02-22-213315-150x77.png 150w, https://t21.com.mx/wp-content/uploads/2026/04/Captura-de-pantalla-2026-02-22-213315-750x384.png 750w" alt="" width="950" height="487" data-pin-no-hover="true" /><figcaption id="caption-attachment-673356" class="wp-caption-text"><span dir="auto">Source: ATTRAPI.</span></figcaption></figure>
<p><span dir="auto">Comment and follow us on LinkedIn:  </span><a href="https://www.linkedin.com/in/evangelina-del-toro-31b8104b/"><span dir="auto">@Evangelina del Toro</span></a><span dir="auto">  /  </span><a id="menurj3" class="fui-Link ___1q1shib f2hkw1w f3rmtva f1ewtqcl fyind8e f1k6fduh f1w7gpdv fk6fouc fjoy568 figsok6 f1s184ao f1mk8lai fnbmjn9 f1o700av f13mvf36 f1cmlufx f9n3di6 f1ids18y f1tx3yz7 f1deo86v f1eh06m1 f1iescvh fhgqx19 f1olyrje f1p93eir f1nev41a f1h8hb77 f1lqvz6u f10aw75t fsle3fq f17ae5zn" title="https://www.linkedin.com/company/t21-grupo-comunicai-ny-medios/" href="https://www.linkedin.com/company/t21-grupo-comunicai-n-y-medios/" target="_blank" rel="noreferrer noopener" aria-label="Link @GrupoT21"><span dir="auto">@GrupoT21</span></a></p>
<p>El cargo <a href="https://t21.us/a-consortium-led-by-recal-estructuras-will-build-a-section-of-the-saltillo-nuevo-laredo-train/">A consortium led by Recal Estructuras will build a section of the Saltillo–Nuevo Laredo train</a> apareció primero en <a href="https://t21.us">T21</a>.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>This consortium will build 4 stations on the Saltillo-Nuevo Laredo train line</title>
		<link>https://t21.us/this-consortium-will-build-4-stations-on-the-saltillo-nuevo-laredo-train-line/</link>
		
		<dc:creator><![CDATA[T21 Media]]></dc:creator>
		<pubDate>Tue, 21 Apr 2026 00:22:47 +0000</pubDate>
				<category><![CDATA[Railway]]></category>
		<category><![CDATA[ATTRAPI]]></category>
		<category><![CDATA[COMSA INFRASTRUCTURE]]></category>
		<category><![CDATA[PASSENGER TRAIN]]></category>
		<category><![CDATA[RAILWAY PROJECTS]]></category>
		<category><![CDATA[SALTILLO-NUEVO LAREDO TRAIN]]></category>
		<category><![CDATA[STATION CONSTRUCTION]]></category>
		<guid isPermaLink="false">https://t21.us/?p=635269</guid>

					<description><![CDATA[<p>The federal government awarded the consortium headed by Comsa Infraestructuras  a contract for 2,890,971,095.04 pesos for the construction and design of four stations of the  Saltillo-Nuevo Laredo passenger train . According to the tender award document, of the five proposals received by the Agency for Trains and Integrated Public Transport (ATTRAPI) , the winning bid was the only one that was solvent and [&#8230;]</p>
<p>El cargo <a href="https://t21.us/this-consortium-will-build-4-stations-on-the-saltillo-nuevo-laredo-train-line/">This consortium will build 4 stations on the Saltillo-Nuevo Laredo train line</a> apareció primero en <a href="https://t21.us">T21</a>.</p>
]]></description>
										<content:encoded><![CDATA[<p><img decoding="async" src="https://t21.com.mx/wp-content/uploads/2026/04/Sin-titulo-11.jpg" /></p>
<p><span dir="auto">The federal government awarded the consortium headed by </span><a href="https://www.comsa.com/"><span dir="auto">Comsa Infraestructuras</span></a><span dir="auto">  a contract for </span><strong><span dir="auto">2,890,971,095.04 pesos</span></strong><span dir="auto"> for the construction and design of four stations of the  </span><strong><span dir="auto">Saltillo-Nuevo Laredo passenger train</span></strong><span dir="auto"> .</span></p>
<p><span dir="auto">According to the tender award document, of the five proposals received by the </span><a href="https://www.gob.mx/attrapi"><span dir="auto">Agency for Trains and Integrated Public Transport (ATTRAPI)</span></a><span dir="auto"> , the winning bid was the only one that was solvent and met all the requested requirements.</span></p>
<p><span dir="auto">Comsa Infraestructura formed the consortium with Regiomontana de Construcción y Servicios, Comsa, and Vise. </span><strong><span dir="auto">Work will begin on April 27th</span></strong><span dir="auto"> , with a completion timeframe of 749 calendar days.</span></p>
<p><span dir="auto">The agency highlighted that the 2026 allocation for this project amounts to 1,116 million 688 thousand 100.40 pesos.</span></p>
<p><span dir="auto">The works encompass the construction and design of the  </span><strong><span dir="auto">Derramadero, Saltillo, Ramos Arizpe and García</span></strong><span dir="auto"> stations .</span></p>
<p><span dir="auto">Last February, ATTRAPI declared the bidding process for this project void, as it considered that none of the offers it received met all the requested technical and economic requirements.</span></p>
<p><strong><span dir="auto">The Saltillo-Nuevo Laredo train project involves the construction of a 396.3-kilometer (km) railway line,</span></strong><span dir="auto"> which will include a section of double track that is not electrified and will operate at a maximum speed of 200 kilometers per hour (km/h). It also includes the following stations and stops: Derramadero, Saltillo Centro, Ramos Arizpe, García, Las Torres, Salinas Victoria, Bustamante, Lampazos, Anáhuac, and Nuevo Laredo.</span></p>
<p><span dir="auto">It is worth remembering that </span><a href="https://recalglobal.com/"><span dir="auto">Recal Estructuras</span></a><span dir="auto"> , </span><a href="https://construccionesurales.mx/"><span dir="auto">Construcciones Urales</span></a><span dir="auto"> , Gami Ingeniería e Instalaciones, Azvi and Constructora Moyeda were the companies that won the construction and design of 8.854 km of this same project in segment 15 “A1”, Monterrey Metropolitan Area.</span></p>
<blockquote><p><span dir="auto">ATTRAPI also launched tenders for this project for the construction and design of the General Escobedo, Salinas Victoria, Villaldama, Lampazos de Naranjo, Anáhuac and Nuevo Laredo stations; the deadline for submitting proposals is May 12.</span></p></blockquote>
<p><span dir="auto">Also, on April 29th, the decision will be made for the tender for the construction and design of the Zica Derramadero railway auxiliary buildings, García Workshops and Garages, Las Torres inspection zone, Salinas Victoria maintenance base and Zica Nuevo Laredo.</span></p>
<p><span dir="auto">Meanwhile, the next April 24th will be for the construction and design of the railway systems, and the 21st of the same month for the construction and design of 9,204 km, segment 15 “A2”, Monterrey Metropolitan Area.</span></p>
<p><span dir="auto">Comment and follow us on LinkedIn:  </span><a href="https://www.linkedin.com/in/evangelina-del-toro-31b8104b/"><span dir="auto">@Evangelina del Toro</span></a><span dir="auto">  /  </span><a href="https://www.linkedin.com/company/t21-grupo-comunicai-n-y-medios/"><span dir="auto">@GrupoT21</span></a></p>
<div class="jeg_ad jeg_ad_article jnews_content_inline_2_ads  ">
<div class="ads-wrapper align-center "></div>
</div>
<p>El cargo <a href="https://t21.us/this-consortium-will-build-4-stations-on-the-saltillo-nuevo-laredo-train-line/">This consortium will build 4 stations on the Saltillo-Nuevo Laredo train line</a> apareció primero en <a href="https://t21.us">T21</a>.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>ATTRAPI receives proposals for section of the Saltillo–Nuevo Laredo train</title>
		<link>https://t21.us/attrapi-receives-proposals-for-section-of-the-saltillo-nuevo-laredo-train/</link>
		
		<dc:creator><![CDATA[T21 Media]]></dc:creator>
		<pubDate>Wed, 08 Apr 2026 22:21:04 +0000</pubDate>
				<category><![CDATA[Railway]]></category>
		<category><![CDATA[ATTRAPI]]></category>
		<category><![CDATA[PASSENGER TRAIN]]></category>
		<category><![CDATA[RAILWAY PROJECTS]]></category>
		<category><![CDATA[SALTILLO-NUEVO LAREDO TRIAN]]></category>
		<category><![CDATA[TENDER]]></category>
		<guid isPermaLink="false">https://t21.us/?p=635027</guid>

					<description><![CDATA[<p>The Agency for Trains and Integrated Public Transportation (ATTRAPI)  received six bids as part of the construction and design of 9.204 kilometers (km) of the Saltillo–Nuevo Laredo passenger train, segment 15 “A2”, Monterrey Metropolitan Area. According to the document, the consortium made up of Impulsora de Desarrollo Integral , Jaguar Ingenieros Constructores , Cargo Energía, Ingeniería y Construcción, Proacon México, China [&#8230;]</p>
<p>El cargo <a href="https://t21.us/attrapi-receives-proposals-for-section-of-the-saltillo-nuevo-laredo-train/">ATTRAPI receives proposals for section of the Saltillo–Nuevo Laredo train</a> apareció primero en <a href="https://t21.us">T21</a>.</p>
]]></description>
										<content:encoded><![CDATA[<p><img decoding="async" src="https://t21.com.mx/wp-content/uploads/2026/04/Sin-titulo1.jpg" /></p>
<p><span dir="auto">The </span><a href="https://www.gob.mx/attrapi"><span dir="auto">Agency for Trains and Integrated Public Transportation (ATTRAPI)</span></a><span dir="auto">  received six bids as part of the construction and design of 9.204 kilometers (km) of the Saltillo–Nuevo Laredo passenger train, segment 15 “A2”, Monterrey Metropolitan Area.</span></p>
<p><span dir="auto">According to the document, the consortium made up of </span><a href="https://grupoidinsa.com/"><span dir="auto">Impulsora de Desarrollo Integral</span></a><span dir="auto"> , </span><a href="https://jaguaringenieros.mx/"><span dir="auto">Jaguar Ingenieros Constructores</span></a><span dir="auto"> , Cargo Energía, Ingeniería y Construcción, Proacon México, China Civil Engineering Construction Corporation and </span><a href="http://aldesa.com.mx/"><span dir="auto">Construcciones Aldesem</span></a><span dir="auto"> , submitted the lowest offer with </span><strong><span dir="auto">nine billion 278 million 429 thousand 324.98 pesos</span></strong><span dir="auto"> .</span></p>
<p><span dir="auto">The consortium made up of </span><a href="https://tordec.com/"><span dir="auto">Tordec</span></a><span dir="auto"> , Proyectos y Desarrollos Salve, ZITUM Desarrolladores, and Proyectos y Estudios Ferroviarios, offered </span><strong><span dir="auto">the highest bid at 11 billion 89 million 475 thousand 533.02 pesos</span></strong><span dir="auto"> .</span></p>
<p><span dir="auto">Constructora de Proyectos Viales de México, </span><a href="https://www.grupocaabsa.com/"><span dir="auto">Caabsa Constructora</span></a><span dir="auto"> and Obrascon Huarte Lain (OHL) proposed 11 billion 13 million 703 thousand 496.79 pesos.</span></p>
<p><span dir="auto">The consortium made up of </span><a href="https://ica.com.mx/"><span dir="auto">ICA Constructora</span></a><span dir="auto"> , Desarrolladora de Infraestructura Puerto Escondido; Controladora de Operaciones de Infraestructura, </span><strong><span dir="auto">Compañía Hidroeléctrica La Yesca</span></strong><span dir="auto"> , ICA Edificio Satélite, Constructora El Cajón, Entia de México, Desarrollo y Construcciones Urbanas, Constructora Garza Ponce, Construcciones y Trituraciones and ICA Constructora de Infraestructura, submitted a proposal of 10 billion 700 million 291 thousand 890.35 pesos.</span></p>
<p><span dir="auto">Meanwhile, Proveedora de Materiales del Norte, </span><a href="https://www.rubau.com/project/mexico/"><span dir="auto">Rubau México</span></a><span dir="auto"> , González Soto y Asociados, ASCH, Construcciones y Maquinaria SEF, ASCH Infraestructuras y Servicios and ASCH Infraestructuras y Servicios, Agencia en Chile, submitted a bid of nine billion 917 million 991 thousand 547.57 pesos.</span></p>
<p><span dir="auto">Finally, </span><a href="https://recalglobal.com/"><span dir="auto">Recal Estructuras</span></a><span dir="auto"> , Constructora Moyeda, Construcciones Urales, AZVI, and Gami Ingeniería e Instalaciones, proposed 10 billion 438 million 249 thousand 060.02 pesos.</span></p>
<p><span dir="auto">ATTRAPI detailed that </span><strong><span dir="auto"> the project includes the construction of a double railway track</span></strong><span dir="auto"> , the elevated stations of González Garza and Monterrey Centro, as well as the studies necessary for the correct preparation and authorization of the executive project, among other works.</span></p>
<p><span dir="auto">The agency has set </span><strong><span dir="auto"> May 1st as the start date for the work</span></strong><span dir="auto"> , with a completion timeframe of 1,007 calendar days. It specified that </span><strong><span dir="auto"> it has allocated 1,701,168,857.41 pesos</span></strong><span dir="auto">  for this project this year.</span></p>
<p><span dir="auto">The agency will announce the winner of this contest on April 17th.</span></p>
<p><span dir="auto">Comment and follow us on LinkedIn:  </span><a href="https://www.linkedin.com/in/evangelina-del-toro-31b8104b/"><span dir="auto">@Evangelina del Toro</span></a><span dir="auto">  /  </span><a href="https://www.linkedin.com/company/t21-grupo-comunicai-n-y-medios/"><span dir="auto">@GrupoT21</span></a></p>
<p>El cargo <a href="https://t21.us/attrapi-receives-proposals-for-section-of-the-saltillo-nuevo-laredo-train/">ATTRAPI receives proposals for section of the Saltillo–Nuevo Laredo train</a> apareció primero en <a href="https://t21.us">T21</a>.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>ATTRAPI launches competition to build 6 stations for the Saltillo–Nuevo Laredo train</title>
		<link>https://t21.us/attrapi-launches-competition-to-build-6-stations-for-the-saltillo-nuevo-laredo-train/</link>
		
		<dc:creator><![CDATA[T21 Media]]></dc:creator>
		<pubDate>Tue, 07 Apr 2026 01:45:43 +0000</pubDate>
				<category><![CDATA[Railway]]></category>
		<category><![CDATA[ATTRAPI]]></category>
		<category><![CDATA[INAH]]></category>
		<category><![CDATA[PASSENGER TRAIN]]></category>
		<category><![CDATA[RAILWAY PROJECTS]]></category>
		<category><![CDATA[RAILWAY STATIONS]]></category>
		<category><![CDATA[SALTILLO-NUEVO LAREDO TRAIN]]></category>
		<guid isPermaLink="false">https://t21.us/?p=634973</guid>

					<description><![CDATA[<p>The  Agency for Trains and Integrated Public Transportation (ATTRAPI) launched the call for bids for the construction and design of six railway stations for the Saltillo–Nuevo Laredo passenger train. According to the document, these are the stations General Escobedo, Salinas Victoria, Villaldama, Lampazos de Naranjo, Anáhuac and Nuevo Laredo . “The work will be carried out under a continuous management scheme [&#8230;]</p>
<p>El cargo <a href="https://t21.us/attrapi-launches-competition-to-build-6-stations-for-the-saltillo-nuevo-laredo-train/">ATTRAPI launches competition to build 6 stations for the Saltillo–Nuevo Laredo train</a> apareció primero en <a href="https://t21.us">T21</a>.</p>
]]></description>
										<content:encoded><![CDATA[<p><img decoding="async" src="https://t21.com.mx/wp-content/uploads/2026/04/Sin-titulo-1.jpg" /></p>
<p><span dir="auto">The  </span><a href="https://www.gob.mx/attrapi"><span dir="auto">Agency for Trains and Integrated Public Transportation (ATTRAPI)</span></a><span dir="auto"> launched the call for bids for the </span><strong><span dir="auto">construction and design of six railway stations</span></strong><span dir="auto"> for the Saltillo–Nuevo Laredo passenger train.</span></p>
<p><span dir="auto">According to the document, these are the stations </span><strong><span dir="auto">General Escobedo, Salinas Victoria, Villaldama, Lampazos de Naranjo, Anáhuac and Nuevo Laredo</span></strong><span dir="auto"> .</span></p>
<blockquote><p><span dir="auto">“The work will be carried out under a continuous management scheme ( </span><em><span dir="auto">fast track</span></em><span dir="auto"> ), starting construction in stages as portions of the executive project are completed, without waiting to have the project completed in its entirety, which implies that work can begin as long as the construction elements of the work to be carried out do have the corresponding executive project,” the agency specified.</span></p></blockquote>
<p><span dir="auto">ATTRAPI highlighted that </span><strong><span dir="auto">Salinas Victoria, Villaldama and Lampazos de Naranjo are old stations with historical value</span></strong><span dir="auto">  cataloged by the </span><a href="https://www.inah.gob.mx/"><span dir="auto">National Institute of Anthropology and History (INAH)</span></a><span dir="auto"> , so the winner must consider the materials, specialized personnel, tools, equipment, temporary installations and other elements required for their correct execution, in accordance with the guidelines and authorizations issued by this institute.</span></p>
<blockquote><p><span dir="auto">“The winning bidder will be responsible for coordinating with the competent authorities for the initiation, management, monitoring and conclusion of all necessary procedures, the preparation of studies, reports, executive project and the execution of rescue and salvage actions, as well as for carrying out the corresponding works, within the deadlines established by the agency,” he explained.</span></p></blockquote>
<p><span dir="auto">The agency specified that the presentation and opening of proposals for this project </span><strong><span dir="auto">will be on April 21, and that day the date on which the decision will be made will be announced</span></strong><span dir="auto"> .</span></p>
<p><span dir="auto">Similarly, he indicated that the start date for the work will be </span><strong><span dir="auto">May 21, 2026, with a deadline for the execution of the work of 558 calendar days</span></strong><span dir="auto"> .</span></p>
<p><span dir="auto">Comment and follow us on LinkedIn:  </span><a href="https://www.linkedin.com/in/evangelina-del-toro-31b8104b/"><span dir="auto">@Evangelina del Toro</span></a><span dir="auto">  /  </span><a href="https://www.linkedin.com/company/t21-grupo-comunicai-n-y-medios/"><span dir="auto">@GrupoT21</span></a></p>
<p>El cargo <a href="https://t21.us/attrapi-launches-competition-to-build-6-stations-for-the-saltillo-nuevo-laredo-train/">ATTRAPI launches competition to build 6 stations for the Saltillo–Nuevo Laredo train</a> apareció primero en <a href="https://t21.us">T21</a>.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>These were the most stolen products on the railroad in Mexico during 2025</title>
		<link>https://t21.us/these-were-the-most-stolen-products-on-the-railroad-in-mexico-during-2025-2/</link>
		
		<dc:creator><![CDATA[T21 Media]]></dc:creator>
		<pubDate>Mon, 30 Mar 2026 23:37:48 +0000</pubDate>
				<category><![CDATA[Railway]]></category>
		<category><![CDATA[ATTRAPI]]></category>
		<category><![CDATA[AUTO PARTS]]></category>
		<category><![CDATA[CORN]]></category>
		<category><![CDATA[RAIL FREIGHT]]></category>
		<category><![CDATA[railroad robberies]]></category>
		<category><![CDATA[RAILWAY]]></category>
		<guid isPermaLink="false">https://t21.us/?p=634878</guid>

					<description><![CDATA[<p>During 2025, auto parts, accessories, batteries, tires, and corn were the most stolen products in rail transport in Mexico, according to the Agency of Trains and Integrated Public Transport (ATTRAPI) . According to data from the agency, the five states with the most robbery incidents during the period were Coahuila, Aguascalientes, Guanajuato, Sonora, and Sinaloa . However, ATTRAPI highlighted that, as [&#8230;]</p>
<p>El cargo <a href="https://t21.us/these-were-the-most-stolen-products-on-the-railroad-in-mexico-during-2025-2/">These were the most stolen products on the railroad in Mexico during 2025</a> apareció primero en <a href="https://t21.us">T21</a>.</p>
]]></description>
										<content:encoded><![CDATA[<p><img decoding="async" src="https://t21.com.mx/wp-content/uploads/2026/03/Sin-titulo-19.jpg" /></p>
<p><span dir="auto">During 2025, </span><strong><span dir="auto">auto parts, accessories, batteries, tires, and corn</span></strong><span dir="auto"> were the most stolen products in rail transport in Mexico, according to the </span><a href="https://www.gob.mx/attrapi"><span dir="auto">Agency of Trains and Integrated Public Transport (ATTRAPI)</span></a><span dir="auto"> .</span></p>
<p><span dir="auto">According to data from the agency, the five states with the most robbery incidents during the period were </span><strong><span dir="auto">Coahuila, Aguascalientes, Guanajuato, Sonora, and Sinaloa</span></strong><span dir="auto"> .</span></p>
<p><img decoding="async" class="aligncenter wp-image-671425" src="https://t21.com.mx/wp-content/uploads/2026/03/Designer-20.jpeg" sizes="(max-width: 425px) 100vw, 425px" srcset="https://t21.com.mx/wp-content/uploads/2026/03/Designer-20.jpeg 1024w, https://t21.com.mx/wp-content/uploads/2026/03/Designer-20-200x300.jpeg 200w, https://t21.com.mx/wp-content/uploads/2026/03/Designer-20-683x1024.jpeg 683w, https://t21.com.mx/wp-content/uploads/2026/03/Designer-20-768x1152.jpeg 768w, https://t21.com.mx/wp-content/uploads/2026/03/Designer-20-600x900.jpeg 600w, https://t21.com.mx/wp-content/uploads/2026/03/Designer-20-150x225.jpeg 150w, https://t21.com.mx/wp-content/uploads/2026/03/Designer-20-750x1125.jpeg 750w" alt="" width="425" height="638" data-pin-no-hover="true" /></p>
<p><span dir="auto">However, ATTRAPI highlighted that, as a result of actions taken in railway security, </span><strong><span dir="auto">reports of railway robbery decreased by 6.8% in 2025 compared to 2024</span></strong><span dir="auto"> .</span></p>
<p><span dir="auto">He specified that from January to December 2025, </span><strong><span dir="auto">four thousand 002 theft reports were filed compared to the four thousand 298</span></strong><span dir="auto"> filed in the same period.</span></p>
<p><span dir="auto">The industrial products group accounted for 79.10% of the total theft reports, followed by agricultural products, with 18.31 percent.</span></p>
<p><span dir="auto">Regarding product or cargo theft, the most affected subgroups during the period were:</span></p>
<ul>
<li><span dir="auto">Other industrial products, with 21.04% of the total reports.</span></li>
<li><span dir="auto">Consumer goods, with 17.22 percent.</span></li>
<li><span dir="auto">Auto parts, with 16.83 percent.</span></li>
<li><span dir="auto">Grains, seeds and their derivatives, with 13.48 percent.</span></li>
</ul>
<p><span dir="auto">The agency stated that within the subgroup of other industrial products, </span><strong><span dir="auto">accessories</span></strong><span dir="auto"> accounted for 59.23% of the reports. In the case of consumer goods, batteries accounted for 41.61%.</span></p>
<p><span dir="auto">Meanwhile, within the auto parts subgroup, </span><strong><span dir="auto">tires</span></strong><span dir="auto"> were the most frequently stolen item , accounting for 94.37 percent of thefts. For grains, seeds, and their derivatives, </span><strong><span dir="auto">corn</span></strong><span dir="auto"> was the most stolen product , representing 57.98 percent of reported thefts.</span></p>
<p><span dir="auto">Comment and follow us on LinkedIn:  </span><a href="https://www.linkedin.com/in/evangelina-del-toro-31b8104b/"><span dir="auto">@Evangelina del Toro</span></a><span dir="auto">  /  </span><a href="https://www.linkedin.com/company/t21-grupo-comunicai-n-y-medios/"><span dir="auto">@GrupoT21</span></a></p>
<p>El cargo <a href="https://t21.us/these-were-the-most-stolen-products-on-the-railroad-in-mexico-during-2025-2/">These were the most stolen products on the railroad in Mexico during 2025</a> apareció primero en <a href="https://t21.us">T21</a>.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>These were the most stolen products on the railroad in Mexico during 2025</title>
		<link>https://t21.us/these-were-the-most-stolen-products-on-the-railroad-in-mexico-during-2025/</link>
		
		<dc:creator><![CDATA[T21 Media]]></dc:creator>
		<pubDate>Mon, 30 Mar 2026 23:31:53 +0000</pubDate>
				<category><![CDATA[Railway]]></category>
		<category><![CDATA[ATTRAPI]]></category>
		<category><![CDATA[AUTOPARTS]]></category>
		<category><![CDATA[CORN]]></category>
		<category><![CDATA[RAILFREIGHT]]></category>
		<category><![CDATA[railroad robberies]]></category>
		<category><![CDATA[RAILWAY]]></category>
		<guid isPermaLink="false">https://t21.us/?p=634874</guid>

					<description><![CDATA[<p>During 2025, auto parts, accessories, batteries, tires, and corn were the most stolen products in rail transport in Mexico, according to the Agency of Trains and Integrated Public Transport (ATTRAPI) . According to data from the agency, the five states with the most robbery incidents during the period were Coahuila, Aguascalientes, Guanajuato, Sonora, and Sinaloa . However, ATTRAPI highlighted that, as [&#8230;]</p>
<p>El cargo <a href="https://t21.us/these-were-the-most-stolen-products-on-the-railroad-in-mexico-during-2025/">These were the most stolen products on the railroad in Mexico during 2025</a> apareció primero en <a href="https://t21.us">T21</a>.</p>
]]></description>
										<content:encoded><![CDATA[<p><img decoding="async" src="https://t21.com.mx/wp-content/uploads/2026/03/Sin-titulo-19.jpg" /></p>
<p><span dir="auto">During 2025, </span><strong><span dir="auto">auto parts, accessories, batteries, tires, and corn</span></strong><span dir="auto"> were the most stolen products in rail transport in Mexico, according to the </span><a href="https://www.gob.mx/attrapi"><span dir="auto">Agency of Trains and Integrated Public Transport (ATTRAPI)</span></a><span dir="auto"> .</span></p>
<p><span dir="auto">According to data from the agency, the five states with the most robbery incidents during the period were </span><strong><span dir="auto">Coahuila, Aguascalientes, Guanajuato, Sonora, and Sinaloa</span></strong><span dir="auto"> .</span></p>
<p><img decoding="async" class="aligncenter wp-image-671425" src="https://t21.com.mx/wp-content/uploads/2026/03/Designer-20.jpeg" sizes="(max-width: 425px) 100vw, 425px" srcset="https://t21.com.mx/wp-content/uploads/2026/03/Designer-20.jpeg 1024w, https://t21.com.mx/wp-content/uploads/2026/03/Designer-20-200x300.jpeg 200w, https://t21.com.mx/wp-content/uploads/2026/03/Designer-20-683x1024.jpeg 683w, https://t21.com.mx/wp-content/uploads/2026/03/Designer-20-768x1152.jpeg 768w, https://t21.com.mx/wp-content/uploads/2026/03/Designer-20-600x900.jpeg 600w, https://t21.com.mx/wp-content/uploads/2026/03/Designer-20-150x225.jpeg 150w, https://t21.com.mx/wp-content/uploads/2026/03/Designer-20-750x1125.jpeg 750w" alt="" width="425" height="638" data-pin-no-hover="true" /></p>
<p><span dir="auto">However, ATTRAPI highlighted that, as a result of actions taken in railway security, </span><strong><span dir="auto">reports of railway robbery decreased by 6.8% in 2025 compared to 2024</span></strong><span dir="auto"> .</span></p>
<p><span dir="auto">He specified that from January to December 2025, </span><strong><span dir="auto">four thousand 002 theft reports were filed compared to the four thousand 298</span></strong><span dir="auto"> filed in the same period.</span></p>
<p><span dir="auto">The industrial products group accounted for 79.10% of the total theft reports, followed by agricultural products, with 18.31 percent.</span></p>
<p><span dir="auto">Regarding product or cargo theft, the most affected subgroups during the period were:</span></p>
<ul>
<li><span dir="auto">Other industrial products, with 21.04% of the total reports.</span></li>
<li><span dir="auto">Consumer goods, with 17.22 percent.</span></li>
<li><span dir="auto">Auto parts, with 16.83 percent.</span></li>
<li><span dir="auto">Grains, seeds and their derivatives, with 13.48 percent.</span></li>
</ul>
<p><span dir="auto">The agency stated that within the subgroup of other industrial products, </span><strong><span dir="auto">accessories</span></strong><span dir="auto"> accounted for 59.23% of the reports. In the case of consumer goods, batteries accounted for 41.61%.</span></p>
<p><span dir="auto">Meanwhile, within the auto parts subgroup, </span><strong><span dir="auto">tires</span></strong><span dir="auto"> were the most frequently stolen item , accounting for 94.37 percent of thefts. For grains, seeds, and their derivatives, </span><strong><span dir="auto">corn</span></strong><span dir="auto"> was the most stolen product , representing 57.98 percent of reported thefts.</span></p>
<p><span dir="auto">Comment and follow us on LinkedIn:  </span><a href="https://www.linkedin.com/in/evangelina-del-toro-31b8104b/"><span dir="auto">@Evangelina del Toro</span></a><span dir="auto">  /  </span><a href="https://www.linkedin.com/company/t21-grupo-comunicai-n-y-medios/"><span dir="auto">@GrupoT21</span></a></p>
<p>El cargo <a href="https://t21.us/these-were-the-most-stolen-products-on-the-railroad-in-mexico-during-2025/">These were the most stolen products on the railroad in Mexico during 2025</a> apareció primero en <a href="https://t21.us">T21</a>.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>Rail freight in Mexico, with “obstacles” on the track during 2025: ATTRAPI</title>
		<link>https://t21.us/rail-freight-in-mexico-with-obstacles-on-the-track-during-2025-attrapi/</link>
		
		<dc:creator><![CDATA[T21 Media]]></dc:creator>
		<pubDate>Tue, 24 Mar 2026 21:31:06 +0000</pubDate>
				<category><![CDATA[FEATURED]]></category>
		<category><![CDATA[Railway]]></category>
		<category><![CDATA[AGENCY FOR TRAINS AND INTEGRATED PUBLIC TRANSPORT]]></category>
		<category><![CDATA[ATTRAPI]]></category>
		<category><![CDATA[CPKC of Mexico]]></category>
		<category><![CDATA[Ferromex]]></category>
		<category><![CDATA[INTERNATIONAL TRAFFIC]]></category>
		<category><![CDATA[RAIL FREIGHT]]></category>
		<category><![CDATA[RAILWAY]]></category>
		<guid isPermaLink="false">https://t21.us/?p=634726</guid>

					<description><![CDATA[<p>In an environment of uncertainty and economic moderation, the Mexican Railway System (SFM) registered a 2.8% drop in freight movement in 2025 compared to 2024 , reported the Agency of Trains and Integrated Public Transport (ATTRAPI) . In the document &#8220;Railway Pulse: Operation and Safety January-December 2025&#8221; , the agency specified that 128.94 million tons were transported throughout 2025 compared to [&#8230;]</p>
<p>El cargo <a href="https://t21.us/rail-freight-in-mexico-with-obstacles-on-the-track-during-2025-attrapi/">Rail freight in Mexico, with “obstacles” on the track during 2025: ATTRAPI</a> apareció primero en <a href="https://t21.us">T21</a>.</p>
]]></description>
										<content:encoded><![CDATA[<p><img decoding="async" src="https://t21.com.mx/wp-content/uploads/2026/03/Sin-titulo-16.jpg" /><span dir="auto">In an environment of uncertainty and economic moderation, </span><strong><span dir="auto">the Mexican Railway System (SFM) registered a 2.8% drop in freight movement in 2025 compared to 2024</span></strong><span dir="auto"> , reported the </span><a href="https://www.gob.mx/attrapi"><span dir="auto">Agency of Trains and Integrated Public Transport (ATTRAPI)</span></a><span dir="auto"> .</span></p>
<p><span dir="auto">In the document </span><strong><span dir="auto">&#8220;Railway Pulse: Operation and Safety January-December 2025&#8221;</span></strong><span dir="auto"> , the agency specified that 128.94 million tons were transported throughout 2025 compared to 132.78 million tons in 2024.</span></p>
<p><span dir="auto">Of the total, foreign trade represented 76.3% and despite persistent tariff uncertainty, </span><strong><span dir="auto">international traffic showed a growth of 2.4%</span></strong><span dir="auto"> in the January-December period of last year compared to 2024.</span></p>
<p><span dir="auto">This progress was driven by an increase in imports and exports of 2.3% and 2.9%, respectively.</span></p>
<p><span dir="auto">Of the total international traffic, </span><strong><span dir="auto">imports represented 76.5% of the volume</span></strong><span dir="auto"> , with 75.36 million tons, while exports contributed 23.4%, with 23.03 million tons.</span></p>
<blockquote><p><span dir="auto">“In this environment, the border crossings of Nuevo Laredo and Piedras Negras consolidated their position as the main rail and land transport hubs between Mexico and the United States, concentrating 67.7% of imports and 63.9% of exports. Their relative weight confirms the strategic relevance of these routes in shaping bilateral trade,” ATTRAPI stated.</span></p></blockquote>
<p><span dir="auto">The ports of </span><a href="https://www.puertodeveracruz.com.mx/"><span dir="auto">Veracruz</span></a><span dir="auto"> and </span><a href="https://puertomanzanillo.com.mx/espi/0000001/inicio.php"><span dir="auto">Manzanillo</span></a><span dir="auto"> stood out as key rail receiving points for maritime cargo, accounting for 71.6% of imports transferred to this transport, mainly from </span><strong><span dir="auto">Europe, Asia and South America</span></strong><span dir="auto"> .</span></p>
<p><span dir="auto">Regarding exports, </span><strong><a href="https://www.puertodeguaymas.com.mx/"><span dir="auto">Guaymas</span></a><span dir="auto"> and </span></strong><a href="https://www.puertomazatlan.com.mx/"><strong><span dir="auto">Mazatlán</span></strong></a> <strong><span dir="auto">channeled 39.2% of the maritime volume</span></strong><span dir="auto"> moved by rail, &#8220;which underlines their role in the export of Mexican products to international markets.&#8221;</span></p>
<p><span dir="auto">During that period, the main products transported were </span><strong><span dir="auto">industrial products with 46.8% of the total cargo, agricultural products with 30.4%, and oil and its derivatives with 12.8 percent</span></strong><span dir="auto"> .</span></p>
<p><span dir="auto">ATTRAPI indicated that from January to December 2025, </span><a href="https://ferromex.mx/"><span dir="auto">Ferromex</span></a><span dir="auto"> and </span><a href="https://www.cpkcr.com/es"><span dir="auto">Canadian Pacific Kansas City (CPKC) of Mexico</span></a><span dir="auto"> concentrated the majority volume of rail freight moved, with shares of 46.9% and 39.3%, respectively.</span></p>
<figure id="attachment_670969" class="wp-caption aligncenter" aria-describedby="caption-attachment-670969"><img decoding="async" class="wp-image-670969 size-full" src="https://t21.com.mx/wp-content/uploads/2026/03/carga-ferroviaria-1.png" sizes="(max-width: 1246px) 100vw, 1246px" srcset="https://t21.com.mx/wp-content/uploads/2026/03/carga-ferroviaria-1.png 1246w, https://t21.com.mx/wp-content/uploads/2026/03/carga-ferroviaria-1-300x94.png 300w, https://t21.com.mx/wp-content/uploads/2026/03/carga-ferroviaria-1-1024x321.png 1024w, https://t21.com.mx/wp-content/uploads/2026/03/carga-ferroviaria-1-768x240.png 768w, https://t21.com.mx/wp-content/uploads/2026/03/carga-ferroviaria-1-600x188.png 600w, https://t21.com.mx/wp-content/uploads/2026/03/carga-ferroviaria-1-150x47.png 150w, https://t21.com.mx/wp-content/uploads/2026/03/carga-ferroviaria-1-750x235.png 750w, https://t21.com.mx/wp-content/uploads/2026/03/carga-ferroviaria-1-1140x357.png 1140w" alt="" width="1246" height="390" data-pin-no-hover="true" /><figcaption id="caption-attachment-670969" class="wp-caption-text"><span dir="auto">Source: ATTRAPI.</span></figcaption></figure>
<p><a href="https://www.gmexico.com/"><span dir="auto">Grupo México</span></a><span dir="auto"> &#8216;s subsidiary transported 60.52 million tons in 2025, representing a 3.1 percent year-on-year decrease. CPKC de México reached 50.68 million tons, a slight decline of 1.8 percent. Ferrosur moved 13.45 million tons, equivalent to 10.4% of the total, a 7.7% drop compared to 2024.</span></p>
<p><span dir="auto">Comment and follow us on LinkedIn:  </span><a href="https://www.linkedin.com/in/evangelina-del-toro-31b8104b/"><span dir="auto">@Evangelina del Toro</span></a><span dir="auto">  /  </span><a href="https://www.linkedin.com/company/t21-grupo-comunicai-n-y-medios/"><span dir="auto">@GrupoT21</span></a></p>
<p>El cargo <a href="https://t21.us/rail-freight-in-mexico-with-obstacles-on-the-track-during-2025-attrapi/">Rail freight in Mexico, with “obstacles” on the track during 2025: ATTRAPI</a> apareció primero en <a href="https://t21.us">T21</a>.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>ATTRAPI declares the tender to build 4 stations of the Saltillo–Nuevo Laredo train void</title>
		<link>https://t21.us/attrapi-declares-the-tender-to-build-4-stations-of-the-saltillo-nuevo-laredo-train-void/</link>
		
		<dc:creator><![CDATA[T21 Media]]></dc:creator>
		<pubDate>Thu, 26 Feb 2026 23:06:23 +0000</pubDate>
				<category><![CDATA[Railway]]></category>
		<category><![CDATA[ATTRAPI]]></category>
		<category><![CDATA[RAILWAY PROJECTS]]></category>
		<category><![CDATA[SALTILLO-NUEVO LAREDO TRAIN]]></category>
		<category><![CDATA[STATIONS]]></category>
		<category><![CDATA[TENDER]]></category>
		<guid isPermaLink="false">https://t21.us/?p=633960</guid>

					<description><![CDATA[<p>The  Agency for Trains and Integrated Public Transportation (ATTRAPI) declared the tender for the construction and design of the Derramadero, Saltillo, Ramos Arizpe and García stations of the Saltillo–Nuevo Laredo passenger train void. According to the competition&#8217;s ruling, the agency stated that of the six bids it received, none met all the requested technical and economic requirements. It is worth remembering [&#8230;]</p>
<p>El cargo <a href="https://t21.us/attrapi-declares-the-tender-to-build-4-stations-of-the-saltillo-nuevo-laredo-train-void/">ATTRAPI declares the tender to build 4 stations of the Saltillo–Nuevo Laredo train void</a> apareció primero en <a href="https://t21.us">T21</a>.</p>
]]></description>
										<content:encoded><![CDATA[<p><img decoding="async" src="https://t21.com.mx/wp-content/uploads/2026/02/Sin-titulo-17.jpg" /></p>
<p><span dir="auto">The  </span><a href="https://www.gob.mx/attrapi"><span dir="auto">Agency for Trains and Integrated Public Transportation (ATTRAPI)</span></a><span dir="auto"> declared the tender for the construction and design of the </span><strong><span dir="auto">Derramadero, Saltillo, Ramos Arizpe and García</span></strong><span dir="auto"> stations of the Saltillo–Nuevo Laredo passenger train void.</span></p>
<p><span dir="auto">According to the competition&#8217;s ruling, the agency stated that </span><strong><span dir="auto">of the six bids it received, none met all the</span></strong><span dir="auto"> requested technical and economic requirements.</span></p>
<p><a href="https://www.comsa.com/"><span dir="auto">It is worth remembering that for this tender, the consortium formed by Comsa Infraestructuras</span></a><span dir="auto"> , VISE, COMSA and Regiomontana de Construcción y Servicios submitted offers  for two billion 567 million 432 thousand 059.57 pesos.</span></p>
<p><span dir="auto">Meanwhile, the offer from Constructora de Proyectos Viales de México, Obrascon Huarte Lain (OHL) and </span><a href="https://www.grupocaabsa.com/"><span dir="auto">Caabsa Constructora</span></a><span dir="auto"> , was two billion 963 million 635 thousand 333.05 pesos.</span></p>
<p><span dir="auto">The consortium formed by </span><strong><span dir="auto">Gami Ingeniería e Instalaciones</span></strong><span dir="auto"> , Construcciones Urales and </span><a href="https://www.azvi.es/"><span dir="auto">Azvi</span></a><span dir="auto"> , registered a proposal of two billion 695 million 483 thousand 218.84 pesos.</span></p>
<p><span dir="auto">Meanwhile , </span><a href="https://ica.com.mx/"><span dir="auto">ICA Constructora</span></a><span dir="auto"> , ICA Constructora de Infraestructura, Construcciones y Trituraciones, Controladora de Operaciones de Infraestructura and Desarrolladora de Infraestructura Puerto Escondido, submitted a bid of three billion 683 million 547 thousand 117.42 pesos.</span></p>
<p><a href="https://grupoidinsa.com/"><span dir="auto">Impulsora de Desarrollo Integral</span></a><span dir="auto"> , </span><a href="https://jaguaringenieros.mx/"><span dir="auto">Jaguar Ingenieros Constructores</span></a><span dir="auto"> , Proacon México, Aldesa Construcciones, Coalvi, Construcciones Aldesem, Aldesa Construcciones Polska and </span><a href="http://www.ccecc.com.cn/"><span dir="auto">China Civil Engineering Construction Corporation</span></a><span dir="auto"> , registered an offer for three billion 54 million 313 thousand 149.27 pesos.</span></p>
<p><span dir="auto">The lowest offer was the one presented by </span><a href="https://www.idimsa.com.mx/"><span dir="auto"> Ingeniería y Desarrollo Inmobiliario de México</span></a><span dir="auto"> , China Gezhouba Group Company Limited Mexico and Constructora e Inmobiliaria, with two billion 400 million 787 thousand 143.77 pesos.</span></p>
<p><span dir="auto">The plan included the </span><strong><span dir="auto">engineering development and execution of the comprehensive executive project</span></strong><span dir="auto"> for the construction of the aforementioned stations, platforms and tracks in the laredos, layout, earthworks, complementary studies, among others, in accordance with the tender.</span></p>
<p><span dir="auto">Comment and follow us on LinkedIn:  </span><a href="https://www.linkedin.com/in/evangelina-del-toro-31b8104b/"><span dir="auto">@Evangelina del Toro</span></a><span dir="auto">  /  </span><a id="menurj3" class="fui-Link ___1q1shib f2hkw1w f3rmtva f1ewtqcl fyind8e f1k6fduh f1w7gpdv fk6fouc fjoy568 figsok6 f1s184ao f1mk8lai fnbmjn9 f1o700av f13mvf36 f1cmlufx f9n3di6 f1ids18y f1tx3yz7 f1deo86v f1eh06m1 f1iescvh fhgqx19 f1olyrje f1p93eir f1nev41a f1h8hb77 f1lqvz6u f10aw75t fsle3fq f17ae5zn" title="https://www.linkedin.com/company/t21-grupo-comunicai-ny-medios/" href="https://www.linkedin.com/company/t21-grupo-comunicai-n-y-medios/" target="_blank" rel="noreferrer noopener" aria-label="Link @GrupoT21"><span dir="auto">@GrupoT21</span></a></p>
<p>El cargo <a href="https://t21.us/attrapi-declares-the-tender-to-build-4-stations-of-the-saltillo-nuevo-laredo-train-void/">ATTRAPI declares the tender to build 4 stations of the Saltillo–Nuevo Laredo train void</a> apareció primero en <a href="https://t21.us">T21</a>.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>ATTRAPI launches tender for segment of the Saltillo–Nuevo Laredo train</title>
		<link>https://t21.us/attrapi-launches-tender-for-segment-of-the-saltillo-nuevo-laredo-train/</link>
		
		<dc:creator><![CDATA[T21 Media]]></dc:creator>
		<pubDate>Mon, 23 Feb 2026 23:26:08 +0000</pubDate>
				<category><![CDATA[Railway]]></category>
		<category><![CDATA[ATTRAPI]]></category>
		<category><![CDATA[PASSENGER TRAIN]]></category>
		<category><![CDATA[RAILWAY PROJECTS]]></category>
		<category><![CDATA[SALTILLO-NUEVO LAREDO TRAIN]]></category>
		<category><![CDATA[TENDER]]></category>
		<guid isPermaLink="false">https://t21.us/?p=633868</guid>

					<description><![CDATA[<p>The Agency for Trains and Integrated Public Transportation (ATTRAPI) launched the tender for the construction and design of 9.204 kilometers (km) of the Saltillo–Nuevo Laredo passenger train, segment 15 “A2”, Monterrey Metropolitan Area. The agency detailed that the project includes the construction of a double railway track , the elevated stations of González Garza and Monterrey Centro, as well [&#8230;]</p>
<p>El cargo <a href="https://t21.us/attrapi-launches-tender-for-segment-of-the-saltillo-nuevo-laredo-train/">ATTRAPI launches tender for segment of the Saltillo–Nuevo Laredo train</a> apareció primero en <a href="https://t21.us">T21</a>.</p>
]]></description>
										<content:encoded><![CDATA[<p><img decoding="async" src="https://t21.com.mx/wp-content/uploads/2026/02/Sin-titulo-13.jpg" /></p>
<p><span dir="auto">The </span><a href="https://www.gob.mx/attrapi"><span dir="auto">Agency for Trains and Integrated Public Transportation (ATTRAPI)</span></a><span dir="auto"> launched the tender for the construction and design of 9.204 kilometers (km) of the Saltillo–Nuevo Laredo passenger train, segment 15 “A2”, Monterrey Metropolitan Area.</span></p>
<p><span dir="auto">The agency detailed that </span><strong><span dir="auto">the project includes the construction of a double railway track</span></strong><span dir="auto"> , the elevated stations of González Garza and Monterrey Centro, as well as the studies necessary for the correct preparation and authorization of the executive project.</span></p>
<figure id="attachment_668582" class="wp-caption aligncenter" aria-describedby="caption-attachment-668582"><img decoding="async" class="wp-image-668582 size-full" src="https://t21.com.mx/wp-content/uploads/2026/02/Captura-de-pantalla-2026-02-22-211830.png" sizes="(max-width: 1181px) 100vw, 1181px" srcset="https://t21.com.mx/wp-content/uploads/2026/02/Captura-de-pantalla-2026-02-22-211830.png 1181w, https://t21.com.mx/wp-content/uploads/2026/02/Captura-de-pantalla-2026-02-22-211830-300x183.png 300w, https://t21.com.mx/wp-content/uploads/2026/02/Captura-de-pantalla-2026-02-22-211830-1024x624.png 1024w, https://t21.com.mx/wp-content/uploads/2026/02/Captura-de-pantalla-2026-02-22-211830-768x468.png 768w, https://t21.com.mx/wp-content/uploads/2026/02/Captura-de-pantalla-2026-02-22-211830-600x366.png 600w, https://t21.com.mx/wp-content/uploads/2026/02/Captura-de-pantalla-2026-02-22-211830-150x91.png 150w, https://t21.com.mx/wp-content/uploads/2026/02/Captura-de-pantalla-2026-02-22-211830-750x457.png 750w, https://t21.com.mx/wp-content/uploads/2026/02/Captura-de-pantalla-2026-02-22-211830-1140x695.png 1140w" alt="" width="1181" height="720" data-pin-no-hover="true" /><figcaption id="caption-attachment-668582" class="wp-caption-text"><span dir="auto">Source: ATTRAPI.</span></figcaption></figure>
<p><span dir="auto">ATTRAPI indicated that the construction of the project will be carried out subsequently, through excavation work, soil improvement, foundations, retaining walls, mechanically stabilized walls, earthworks, ballast, sleepers, rails and their respective fixings, as well as reinforced and prestressed steel concrete for the vertical and horizontal foundation, lighting, traffic lights, among others.</span></p>
<p><span dir="auto">Also, the </span><strong><span dir="auto">construction and modernization of viaducts</span></strong><span dir="auto"> , railway and vehicular bridges designed to guarantee the continuity of train and road traffic.</span></p>
<blockquote><p><span dir="auto">“This project aims to enhance intercity connectivity in the Monterrey Metropolitan Area, through a modern, efficient and sustainable railway infrastructure,” he emphasized.</span></p></blockquote>
<p><span dir="auto">According to the tender documents, </span><strong><span dir="auto">the site visit will take place on February 25</span></strong><span dir="auto"> , followed by a clarification meeting the next day. The proposals will be opened on March 30, and the date for the tender&#8217;s decision will be announced that same day.</span></p>
<p><span dir="auto">ATTRAPI has set </span><strong><span dir="auto">May 1st as the start date for the project</span></strong><span dir="auto"> , with a completion timeframe of 1,007 calendar days. It specified that </span><strong><span dir="auto">it has allocated 1,701,168,857.41 pesos</span></strong><span dir="auto"> for this project this year.</span></p>
<p><span dir="auto">The Saltillo–Nuevo Laredo train is expected to improve regional connectivity in the Bajío region. This 18.06 km rail line connects the Monterrey Metropolitan Area, passing through urban areas, rural areas, and industrial sites.</span></p>
<figure id="attachment_668583" class="wp-caption aligncenter" aria-describedby="caption-attachment-668583"><img decoding="async" class="wp-image-668583 size-full" src="https://t21.com.mx/wp-content/uploads/2026/02/Captura-de-pantalla-2026-02-22-213315.png" sizes="(max-width: 950px) 100vw, 950px" srcset="https://t21.com.mx/wp-content/uploads/2026/02/Captura-de-pantalla-2026-02-22-213315.png 950w, https://t21.com.mx/wp-content/uploads/2026/02/Captura-de-pantalla-2026-02-22-213315-300x154.png 300w, https://t21.com.mx/wp-content/uploads/2026/02/Captura-de-pantalla-2026-02-22-213315-768x394.png 768w, https://t21.com.mx/wp-content/uploads/2026/02/Captura-de-pantalla-2026-02-22-213315-600x308.png 600w, https://t21.com.mx/wp-content/uploads/2026/02/Captura-de-pantalla-2026-02-22-213315-150x77.png 150w, https://t21.com.mx/wp-content/uploads/2026/02/Captura-de-pantalla-2026-02-22-213315-750x384.png 750w" alt="" width="950" height="487" data-pin-no-hover="true" /><figcaption id="caption-attachment-668583" class="wp-caption-text"><span dir="auto">Source: ATTRAPI.</span></figcaption></figure>
<p><span dir="auto">Comment and follow us on LinkedIn:  </span><a href="https://www.linkedin.com/in/evangelina-del-toro-31b8104b/"><span dir="auto">@Evangelina del Toro</span></a><span dir="auto">  /  </span><a id="menurj3" class="fui-Link ___1q1shib f2hkw1w f3rmtva f1ewtqcl fyind8e f1k6fduh f1w7gpdv fk6fouc fjoy568 figsok6 f1s184ao f1mk8lai fnbmjn9 f1o700av f13mvf36 f1cmlufx f9n3di6 f1ids18y f1tx3yz7 f1deo86v f1eh06m1 f1iescvh fhgqx19 f1olyrje f1p93eir f1nev41a f1h8hb77 f1lqvz6u f10aw75t fsle3fq f17ae5zn" title="https://www.linkedin.com/company/t21-grupo-comunicai-ny-medios/" href="https://www.linkedin.com/company/t21-grupo-comunicai-n-y-medios/" target="_blank" rel="noreferrer noopener" aria-label="Link @GrupoT21"><span dir="auto">@GrupoT21</span></a></p>
<p>El cargo <a href="https://t21.us/attrapi-launches-tender-for-segment-of-the-saltillo-nuevo-laredo-train/">ATTRAPI launches tender for segment of the Saltillo–Nuevo Laredo train</a> apareció primero en <a href="https://t21.us">T21</a>.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>This company will build a segment of section III of the Querétaro-Irapuato train</title>
		<link>https://t21.us/this-company-will-build-a-segment-of-section-iii-of-the-queretaro-irapuato-train/</link>
		
		<dc:creator><![CDATA[T21 Media]]></dc:creator>
		<pubDate>Fri, 20 Feb 2026 19:57:13 +0000</pubDate>
				<category><![CDATA[Railway]]></category>
		<category><![CDATA[ATTRAPI]]></category>
		<category><![CDATA[COMSA]]></category>
		<category><![CDATA[PASSENGER TRAIN]]></category>
		<category><![CDATA[QUERETARO-IRAPUATO TRAIN]]></category>
		<category><![CDATA[RAILWAY PORJETCS]]></category>
		<guid isPermaLink="false">https://t21.us/?p=633817</guid>

					<description><![CDATA[<p>The consortium headed by Comsa  won the construction and design of 1.2 kilometers (km) of section III of the Querétaro-Irapuato passenger train , from km 107+000 to km 108+200. According to the Agency for Trains and Integrated Public Transport (ATTRAPI) , the proposal submitted by the consortium was deemed satisfactory, as it meets the legal, technical and economic requirements requested. [&#8230;]</p>
<p>El cargo <a href="https://t21.us/this-company-will-build-a-segment-of-section-iii-of-the-queretaro-irapuato-train/">This company will build a segment of section III of the Querétaro-Irapuato train</a> apareció primero en <a href="https://t21.us">T21</a>.</p>
]]></description>
										<content:encoded><![CDATA[<p><img decoding="async" src="https://t21.com.mx/wp-content/uploads/2025/09/Vias-01.jpg" /></p>
<p><span dir="auto">The consortium headed by </span><strong><a href="https://www.comsa.com/"><span dir="auto">Comsa</span></a></strong> <strong><span dir="auto"> won the construction and design of 1.2 kilometers (km) of section III of the Querétaro-Irapuato passenger train</span></strong><span dir="auto"> , from km 107+000 to km 108+200.</span></p>
<p><span dir="auto">According to the </span><a href="https://www.gob.mx/attrapi"><span dir="auto">Agency for Trains and Integrated Public Transport (ATTRAPI)</span></a><span dir="auto"> , the proposal submitted by the consortium was deemed satisfactory, as it meets the legal, technical and economic requirements requested.</span></p>
<p><span dir="auto">The offer from Comsa, Infraestructuras, Regiomontana de Construcción y Servicios, and Vise was </span><strong><span dir="auto">for 3,411,823,240.22 pesos</span></strong><span dir="auto"> , the lowest among the five that registered for this competition.</span></p>
<p><span dir="auto">Meanwhile, the consortium made up of </span><a href="https://grupoidinsa.com/"><span dir="auto"> Impulsora de Desarrollo Integral</span></a><span dir="auto"> ,  </span><a href="https://jaguaringenieros.mx/"><span dir="auto">Jaguar Ingenieros Constructores</span></a><span dir="auto"> , Proacon México, Construcciones Aldesem,  </span><a href="http://aldesa.com.mx/"><span dir="auto">Aldesa Construcciones</span></a><span dir="auto"> , Coalvi, Aldesa Construcciones Polska, China Civil Engineering and Construction Corporation  </span><strong><span dir="auto">submitted the highest bid, with 5,331,449,916.80 pesos</span></strong><span dir="auto"> .</span></p>
<p><span dir="auto">Meanwhile,  </span><strong><span dir="auto">Gami Ingeniería e Instalaciones</span></strong><span dir="auto"> ,  </span><a href="https://www.azvi.es/"><span dir="auto">Azvi</span></a><span dir="auto">  and  </span><a href="https://construccionesurales.mx/"><span dir="auto">Construcciones Urales</span></a><span dir="auto">  proposed four billion 333 million 039 thousand 587.64 pesos.</span></p>
<p><strong><span dir="auto">Constructora de Proyectos Viales</span></strong><span dir="auto"> ,  </span><a href="https://www.ohla-group.com/"><span dir="auto">Obrascon Huarte Lain </span></a><span dir="auto"> and </span><a href="https://www.grupocaabsa.com/"><span dir="auto"> Caabsa</span></a><span dir="auto">  submitted a proposal for four billion 257 million 351 thousand 054.91 pesos.</span></p>
<p><span dir="auto">For their part,  </span><strong><span dir="auto">La Peninsular Compañía Constructora</span></strong><span dir="auto"> ,  </span><a href="https://www.grupo-sef.com/"><span dir="auto">Construcciones y Maquinaria SEF</span></a><span dir="auto"> , Alcance Total, Proveedora de Materiales del Norte and Constructora Milos had an offer of three billion 707 million 728 thousand 516.27 pesos.</span></p>
<p><span dir="auto">This project </span><strong><span dir="auto">includes stations located in Apaseo El Grande, Celaya, Cortázar, Salamanca and Irapuato</span></strong><span dir="auto"> , as well as the rectification of the track area of ​​the existing passenger station in Irapuato and reconfiguration of the freight yard until the effective operation of both.</span></p>
<p><span dir="auto">Comment and follow us on LinkedIn:  </span><a href="https://www.linkedin.com/in/evangelina-del-toro-31b8104b/"><span dir="auto">@Evangelina del Toro</span></a><span dir="auto">  /  </span><a id="menurj3" class="fui-Link ___1q1shib f2hkw1w f3rmtva f1ewtqcl fyind8e f1k6fduh f1w7gpdv fk6fouc fjoy568 figsok6 f1s184ao f1mk8lai fnbmjn9 f1o700av f13mvf36 f1cmlufx f9n3di6 f1ids18y f1tx3yz7 f1deo86v f1eh06m1 f1iescvh fhgqx19 f1olyrje f1p93eir f1nev41a f1h8hb77 f1lqvz6u f10aw75t fsle3fq f17ae5zn" title="https://www.linkedin.com/company/t21-grupo-comunicai-ny-medios/" href="https://www.linkedin.com/company/t21-grupo-comunicai-n-y-medios/" target="_blank" rel="noreferrer noopener" aria-label="Link @GrupoT21"><span dir="auto">@GrupoT21</span></a></p>
<p>El cargo <a href="https://t21.us/this-company-will-build-a-segment-of-section-iii-of-the-queretaro-irapuato-train/">This company will build a segment of section III of the Querétaro-Irapuato train</a> apareció primero en <a href="https://t21.us">T21</a>.</p>
]]></content:encoded>
					
		
		
			</item>
	</channel>
</rss>
