<?xml version="1.0" encoding="UTF-8"?><rss version="2.0"
	xmlns:content="http://purl.org/rss/1.0/modules/content/"
	xmlns:wfw="http://wellformedweb.org/CommentAPI/"
	xmlns:dc="http://purl.org/dc/elements/1.1/"
	xmlns:atom="http://www.w3.org/2005/Atom"
	xmlns:sy="http://purl.org/rss/1.0/modules/syndication/"
	xmlns:slash="http://purl.org/rss/1.0/modules/slash/"
	>

<channel>
	<title>15 TRAINS archivos - T21</title>
	<atom:link href="https://t21.us/tag/15-trains/feed/" rel="self" type="application/rss+xml" />
	<link>https://t21.us/tag/15-trains/</link>
	<description>The leading provider of news in the Transportation and Logistics Sector, including Air, Maritime, Land, and Railway, in Mexico and Latin America.</description>
	<lastBuildDate>Tue, 16 Sep 2025 03:44:28 +0000</lastBuildDate>
	<language>en-US</language>
	<sy:updatePeriod>
	hourly	</sy:updatePeriod>
	<sy:updateFrequency>
	1	</sy:updateFrequency>
	<generator>https://wordpress.org/?v=7.0.4</generator>

<image>
	<url>https://t21.us/wp-content/uploads/2024/04/cropped-t21-favicon-200-32x32-1.png</url>
	<title>15 TRAINS archivos - T21</title>
	<link>https://t21.us/tag/15-trains/</link>
	<width>32</width>
	<height>32</height>
</image> 
	<item>
		<title>This company won the bid to build 15 trains on the AIFA-Pachuca route.</title>
		<link>https://t21.us/this-company-won-the-bid-to-build-15-trains-on-the-aifa-pachuca-route/</link>
		
		<dc:creator><![CDATA[T21 Media]]></dc:creator>
		<pubDate>Tue, 16 Sep 2025 03:44:28 +0000</pubDate>
				<category><![CDATA[Railway]]></category>
		<category><![CDATA[15 TRAINS]]></category>
		<category><![CDATA[AIFA-PACHUCA TRAIN]]></category>
		<category><![CDATA[ARTF]]></category>
		<category><![CDATA[CAF México]]></category>
		<category><![CDATA[CRRC ZHUZHOU LOCOMOTIVE]]></category>
		<guid isPermaLink="false">https://t21.us/?p=630496</guid>

					<description><![CDATA[<p>With a 40% savings difference, the Mexican government awarded the consortium headed by the Chinese company C RRC Zhuzhou Locomotive the construction of 15 passenger trains for the AIFA–Pachuca route . According to the tender decision, the company submitted a bid of 5.846 billion 410 thousand 431.88 pesos, against the subsidiary of the Spanish company [&#8230;]</p>
<p>El cargo <a href="https://t21.us/this-company-won-the-bid-to-build-15-trains-on-the-aifa-pachuca-route/">This company won the bid to build 15 trains on the AIFA-Pachuca route.</a> apareció primero en <a href="https://t21.us">T21</a>.</p>
]]></description>
										<content:encoded><![CDATA[<p><img fetchpriority="high" decoding="async" class="alignnone size-full wp-image-656074" src="https://t21.com.mx/wp-content/uploads/2025/09/Sin-titulo-3.jpg" sizes="(max-width: 1170px) 100vw, 1170px" srcset="https://t21.com.mx/wp-content/uploads/2025/09/Sin-titulo-3.jpg 1170w, https://t21.com.mx/wp-content/uploads/2025/09/Sin-titulo-3-300x179.jpg 300w, https://t21.com.mx/wp-content/uploads/2025/09/Sin-titulo-3-1024x613.jpg 1024w, https://t21.com.mx/wp-content/uploads/2025/09/Sin-titulo-3-768x459.jpg 768w, https://t21.com.mx/wp-content/uploads/2025/09/Sin-titulo-3-600x359.jpg 600w, https://t21.com.mx/wp-content/uploads/2025/09/Sin-titulo-3-150x90.jpg 150w, https://t21.com.mx/wp-content/uploads/2025/09/Sin-titulo-3-750x449.jpg 750w, https://t21.com.mx/wp-content/uploads/2025/09/Sin-titulo-3-1140x682.jpg 1140w" alt="" width="1170" height="700" data-pin-no-hover="true" /><span dir="auto">With a 40% savings difference, the Mexican government awarded the consortium headed by the Chinese company </span><a href="https://www.crrcgc.cc/en/"><span dir="auto">C </span></a><a href="https://www.crrcgc.cc/en/"><span dir="auto">RRC Zhuzhou Locomotive </span></a><strong><span dir="auto">the construction of 15 passenger trains for the AIFA–Pachuca route</span></strong><span dir="auto"> .</span></p>
<p><span dir="auto">According to the tender decision, the company submitted a bid of 5.846 billion 410 thousand 431.88 pesos, against the subsidiary of the Spanish company </span><a href="https://www.cafmobility.com/en/solutions/"><span dir="auto">Construcciones y Auxiliar de Ferrocarriles (CAF)</span></a><span dir="auto"> México, which proposed 9.891 billion 248 thousand 072.39 pesos.</span></p>
<blockquote><p><span dir="auto">“The evaluations determined that CRRC Zhuzhou Locomotive, in a joint venture with Mexico Railway Transportation Equipment, obtained the highest score as a result of the analysis and evaluation of the technical and economic proposal, in addition to offering the lowest and most favorable prices for the </span><a href="https://www.gob.mx/artf"><span dir="auto">Railway Transport Regulatory Agency (ARTF)</span></a><span dir="auto"> ,” the agency stated.</span></p></blockquote>
<figure id="attachment_656075" class="wp-caption alignleft" aria-describedby="caption-attachment-656075">
<p><figure id="attachment_656075" aria-describedby="caption-attachment-656075" style="width: 1040px" class="wp-caption aligncenter"><img decoding="async" class="wp-image-656075 size-full" src="https://t21.com.mx/wp-content/uploads/2025/09/Captura-de-pantalla-2025-09-14-201351.png" sizes="(max-width: 1040px) 100vw, 1040px" srcset="https://t21.com.mx/wp-content/uploads/2025/09/Captura-de-pantalla-2025-09-14-201351.png 1040w, https://t21.com.mx/wp-content/uploads/2025/09/Captura-de-pantalla-2025-09-14-201351-300x107.png 300w, https://t21.com.mx/wp-content/uploads/2025/09/Captura-de-pantalla-2025-09-14-201351-1024x366.png 1024w, https://t21.com.mx/wp-content/uploads/2025/09/Captura-de-pantalla-2025-09-14-201351-768x275.png 768w, https://t21.com.mx/wp-content/uploads/2025/09/Captura-de-pantalla-2025-09-14-201351-600x215.png 600w, https://t21.com.mx/wp-content/uploads/2025/09/Captura-de-pantalla-2025-09-14-201351-150x54.png 150w, https://t21.com.mx/wp-content/uploads/2025/09/Captura-de-pantalla-2025-09-14-201351-750x268.png 750w" alt="" width="1040" height="372" data-pin-no-hover="true" /><figcaption id="caption-attachment-656075" class="wp-caption-text">Source: ARTF.</figcaption></figure><figcaption id="caption-attachment-656075" class="wp-caption-text"><span dir="auto">From the proposal of the CRRC Zhuzhou Locomotive consortium it was detailed that, for the cost of supply, testing and commissioning of the 15 trains, which includes the executive project, model, shipment, freight, start-up, guarantees, 4% of the refurbishment of the value of the fleet and everything necessary for its correct operation and service, </span><strong><span dir="auto">a cost of three billion 919 million 418 thousand 875 pesos</span></strong><span dir="auto"> is estimated .</span></figcaption></figure>
<p><span dir="auto">For the equipment of maintenance workshops, which includes the design and preparation of the executive project, supply and installation of the proposed equipment for workshops, construction monitoring, construction and commissioning of the proposed equipment, training and guarantees, the budget is estimated at </span><strong><span dir="auto">559 million 916 thousand 825 pesos</span></strong><span dir="auto"> .</span></p>
<p><span dir="auto">For the cost of comprehensive maintenance of the fleet for a period of five years, which includes service, necessary consumables, qualified personnel, technical documentation, tools, equipment and everything necessary, </span><strong><span dir="auto">560 million 673 thousand 293 pesos</span></strong><span dir="auto"> are projected .</span></p>
<p><span dir="auto">It&#8217;s worth remembering that the ARTF specified that the construction of the 15 trains must have at </span><strong><span dir="auto">least 50% national content in their manufacturing</span></strong><span dir="auto"> , which will be determined by taking into account labor, inputs for goods, and other aspects.</span></p>
<p><span dir="auto">These units  </span><strong><span dir="auto">will serve a demand of 100,000 passengers daily</span></strong><span dir="auto"> , on a one-hour-and-15-minute journey from Mexico City to Pachuca.</span></p>
<p><span dir="auto">They will also run at a maximum speed of 130 kilometers per hour, will be 100 meters long, allowing for the coupling of two units, with capacity for more than 700 passengers and at least 315 ergonomic seats. They will also feature universal accessibility: level access and priority seating, ensuring safety and comfort.</span></p>
<p><span dir="auto">Comment and follow us on X:  </span><a href="https://twitter.com/evandeltoro"><span dir="auto">@evandeltoro</span></a><span dir="auto">  /  </span><a href="https://twitter.com/GrupoT21"><span dir="auto">@GrupoT21</span></a></p>
<p>El cargo <a href="https://t21.us/this-company-won-the-bid-to-build-15-trains-on-the-aifa-pachuca-route/">This company won the bid to build 15 trains on the AIFA-Pachuca route.</a> apareció primero en <a href="https://t21.us">T21</a>.</p>
]]></content:encoded>
					
		
		
			</item>
	</channel>
</rss>
